The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660136

N/A

Westmeath - Westmeath County Council

Proposed Development

to demolish 58.3 Sqm of the existing dilapidated dwelling and extension as previously granted planning permission under file reference number 80/366. Permission is sought to re-roof and renovate 93.5 Sqm of the existing bungalow together with permission to construct a new storey-an-a-half extension connected via a flat roof link to the proposed renovated bungalow Permission is also sought to connect to the existing wastewater treatment system and percolation area together with permission to use the relocated site entrance when constructed as previously granted planning permission under file number 25/60105 together with permission for all associated ancillary site works.

View the full application file on the council's planning portal →

Application Details

Location
Lisheen , Kilmore Streete , Co. Westmeath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council
Site Area
0.277 ha

Timeline

Registration Date
25 March 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660180CONDITIONAL15 Apr 2026

to convert the existing derelict structure to a habitable dwelling. The proposed refurbishment and extension works consists of the following. Permission is sought to demolish 62.5 Sqm of the existing dwelling and extension as previously granted planning permission under file reference number 80/366. Permission is sought to re-roof and renovate 93.5 Sqm of the existing bungalow together with permission to construct a new storey-an-a-half extension connected via a flat roof link to the proposed renovated bungalow. Permission is also sought to connect to the existing wastewater treatment system and percolation area together with permission to use the relocated site entrance when constructed as previously granted planning permission under file number 25/60105 together with permission for all associated ancillary site works

Lisheen , Kilmore Streete , Co. Westmeath

1m
2560105CONDITIONAL14 Mar 2025

development which will consist of the decommissioning of existing septic tank and the proposed construction of a replacement wastewater treatment system with percolation area and all associated ancillary site works

Lisheen , Kilmore Streete , CO. WESTMEATH

589m
2660361N/A3 Jul 2026

proposed modifications, alternations and partial demolition to existing Streete Parish Community Centre including extending the Centre with a new part two-storey, part single storey extension. The proposed ground floor extension will consist of new access stairs/ lifts, handball/badminton court, theatre hall, Plant room, medical room, Reception Area, community shop, associated storage areas, children’s play zones, coffee / meeting room / kitchen area, Multipurpose room, Bar extension, toilets and team and referee’s changing rooms with shower facilities. First floor extension will consist of new access stairs/ lifts, gym extension, new Resource Rooms, Storage, external Sauna / Steam Rooms with Changing areas, Internal / external new viewing gallery areas. External developments will include the Reconfiguration of the existing car parking layout including 7No. disabled and 11No. EV charging spaces, bicycle parking, bus parking and public lighting. Adjustment of existing walking track, New all-weather astro-turf pitch area with basketball area and proposed synthetic running track surrounded associated perimeter fencing and floodlighting. New external soft playground area with perimeter fencing, construction of New Men’s Shed, Women’s Shed with public toilets and Vintage Shed and section of new 2m high concrete block Boundary wall to the northeastern boundary. The installation of a proprietary wastewater treatment system, Ecoflo Coco filter and Gravel distribution percolation Area and all associated site development and ancillary works

Streete Parish Park & Community Centre , Kilmore Streete , Co. Westmeath

1.2km
1881CONDITIONAL20 Apr 2018

proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, septic tank with percolation area and all ancillary works

Freaghmeen , Lisryan , Co. Longford.

1.3km
176258CONDITIONAL13 Sept 2017

existing extension (100.7 m sq), to dwelling house. The development consists of extension to rear of dwelling, consisting of dining room, hall, WC and bedroom (41.6 sq m) and renovation of attic consisting of two no habitable rooms with bathroom (59.1 sq m). Retention is also sought for existing septic tank and percolation area and all associated site works.

Kilmore , Boherquill , Streete

1.3km
176033N/A10 Feb 2017

existing extension (100.7 sqm) to dwelling house which consists of extension to rear of dwelling consisting of dining room, hall, WC and bedroom (41.6 sqm) and renovation of attic consisting of 2 no. habitable rooms with bathroom (59.1 sqm), also retention for existing septic tank and percolation area and all associated site works.

Kilmore , Boherquill , Streete

1.5km
186383CONDITIONAL19 Dec 2018

retention of domestic garage/store of circa 34.38sqm

Barradrum , Streete , Co.Westmeath

1.6km
22486CONDITIONAL7 Oct 2022

retention permission for alterations to the dwelling including new porch; side and rear extension; retention of existing shed; retention for new vehicular entrance and all associated site development works

Kilmore , Streete , Co.Westmeath

1.7km
2360007REFUSED16 Jan 2023

development which shall consist of retention permission for the demolition of an existing cottage; the proposed demolition of an existing hay shed; construction of a replacement dwelling; relocation of vehicular entrance; decommission of existing septic tank and percolation area and replacement with a new wastewater treatment system and tertiary polishing filter; and all associated site development works

Kilmore , Streete , Co Westmeath

1.8km
2560383N/A1 Aug 2025

Planning permission to erect a new dwelling with services and associated site works including garage

Boherquill , Lismacaffery , Co. Westmeath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?