The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660200

CONDITIONAL

Clare - Clare County Council

Proposed Development

the development will consist of the change of use of a vacant classroom into a full daycare childcare service and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Mar 2026

  2. Decision: CONDITIONAL

    13 May 2026

  3. Decision due

    21 May 2026

  4. Grant issued

    16 Jun 2026

Application Details

Location
Saint Fachnan's National School , Kilcarragh , Kilfenora Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.33 ha

Timeline

Registration Date
27 March 2026
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 May 2026
Grant Date
16 June 2026
Permission Expires
15 June 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
23464CONDITIONAL29 Aug 2023

for the following development: to erect two number 10m high floodlight poles, associated fittings, including ancillary site works

Kilfenora National School , Kilcarragh , Kilfenora Co Clare

135m
221122N/A9 Dec 2022

the proposed development will consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanala under reference ABP-305756-19, and consists of: 1. A new surface water drainage network to include infiltration/ detention systems, storm water drains, pipework, swale channel and all associated supporting infrastructure, 2. Modifications to the internal site access roads to include widening/reconfiguration in focused areas, and; 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Kilcarragh and Ballybreen Townlands , Kilfenora , Co Clare

144m
2560013CONDITIONAL16 Jan 2025

the proposed development will consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Modifications to site access and internal roads at the wastewater treatment plant to include (a) raising of access road level from the public road (L1034) to the site entrance gates, to include provision of permeable paving finish, and (b) widening/reconfiguration of internal road in focused areas, permeable paving finish, hard surface area and gully, and provision of petrol interceptor; 2. Modifications to site access and internal road at the percolation area to include new roadside channel drain and provision of permeable paving finish; 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Killcarragh and Ballybreen (Townlands) , Kilfenora , Co. Clare

271m
2460061CONDITIONAL20 Feb 2024

to apply a mural to the South elevation of the community Hall

Main Street , Kilfenora , Co. Clare

295m
21317CONDITIONAL8 Apr 2021

for retention permission for use of the ground floor retail unit as a childcare facility

Main Street , Kilfenora , Co Clare

295m
25221CONDITIONAL9 Jul 2025

for the erection of a mural on the east-facing gable end of the premises formerly known as 'Maire Rua' Craft shop V95 W0HA. The development will consist of a public mural approximately 7m x 5m in scale and comprise work by a professional artist

'Maire Rua' Main Street , Kilfenora , Co.Clare

307m
1931CONDITIONAL22 Jan 2019

for development which will consist of 1. Provision of the following in the townland of Kilcarragh: The construction of a new 330 PE wastewater treatment plant and demolition of the existing treatment works. The development will consist of inlet works, a storm water storage tank, treatment works including tertiary filtration and UV disinfection, sludge treatment, a control kiosk, flood protection bund, site lighting, a 2.4m high security fence and a scheme identification sign. All associated site development and site excavation works above and below ground for the wastewater treatment plant. 2. Provision of the following in the townland of Ballybreen: The construction of a percolation area, including a treated effluent pumping station, a control kiosk, an internal road, site lighting, a 1.2m high fence and a scheme identification sign. All associated site development and site excavation works above and below ground for the percolation area. A Natura Impact Statement has been prepared in respect of this planning application

Kilfenora , Co. Clare

319m
18394CONDITIONAL15 May 2018

to RETAIN the development which consists of the sub-division of a dwelling house to form two seperate dwelling houses together with ancillary site works

Main Street , Kilfenora , Co Clare

322m
20934REFUSED9 Dec 2020

the development will consist of the construction of an 18 metre-high free-standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network

Kilfenora , Co Clare

369m
23550CONDITIONAL27 Oct 2023

to renovate an existing vacant building and to construct an extension to the rear. Construct new divisional boundary wall to the East, demolish existing outbuildings, provide new gated entrance in existing front wall and build up existing, and carry out all ancillary site works

Main Street , Kilfenora , Co Clare V95 Y5Y6

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?