2660212
N/ACarlow - Carlow County Council
Proposed Development
the construction of portal frame curing shed for pre-cast concrete products and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
10 Jul 2026
Decision due (upcoming)
3 Sept 2026
Application Details
- Location
- Powerstown , Milford , Co. Carlow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Carlow County Council
- Site Area
- 0.7 ha
Timeline
- Registration Date
- 10 July 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 3 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the retention of: a rock splitter and associated ancillary canopy covering an area of c. 120.1sqm with a maximum height of c. 7.2m and associated single storey cabin/site office measuring c. 4.7sqm in area; aggregate washing plant with a maximum height of c. 10.7m; welding shed measuring c. 190.2sqm in area with a maximum height of c. 8.4m; and Electricity Supply Board substation measuring c. 13.5sqm in area with a maximum height of c. 3.2m. Retention is also sought for all associated ancillary site development works, including site levelling, lighting, cabling and ducting
Powerstown , Milford , Co. Carlow
permission for recovery activities - the infilling, as a soil recovery facility , of a 4.68 hectare area with uncontained soil and stone, for agricultural improvement purposes; - crushing and recovery of selected construction and demolition wastes on a 0.28 hectares area, and all associated site works and services required to facilitate the development
Mary Kelly's Pit , Powerstown , Milford
recovery activities, over a total area of 4.84-hectares comprising: a) The infilling of lands as a soil recovery facility with inert waste consisting of suitable uncontaminated soil & stone and dredging spoil, to improve land for agricultural use (i.e., 4.792-hectare area, total net import of 199,500 tonnes over 8 years), b) Administration Area, in a 0.048-hectare area, to include a site hut/site office and portable chemical toilet, and c) All other associated site works and services required to facilitate the development
Mary Kelly's Pit , in the townland of Powerstown , Milford
recovery activities, over a total area of 4.84-hectares, comprising: - The infilling, as a soil recovery facility, of a 4.66-hectare area with uncontaminated soil and stone, for agricultural improvement purposes; - Crushing and recovery of selected construction and demolition wastes on a 0.18-hectare area; and - All associated site works and services required to facilitate the development
Mary Kelly's Pit , Powerstown , Milford
Change of use from quarry to recovery activities, over a total area of 4.84-hectares, comprising: -The infilling of lands as a soil recovery facility with inert waste consisting of suitable uncontaminated soil & stone and dredging spoil, to improve land for agricultural use (i.e., 4.792-hectare area, total net import of 199,500 tonnes over 8 years); -An Administration Area (i.e., 0.048-hectare area), to include a site hut/site office and portable chemical toilet; and -All associated site works and services required to facilitate the development. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the application
Mary Kelly’s Pit , Powerstown , Milford Co. Carlow
Permission for the conversion of existing outbuilding to rear of dwelling for habitable use, including renovations and raised ridge height. Permission is also sought for the construction of a single storey annex link from dwelling to converted outbuildings, upgrade the on-site wastewater treatment system and all associated ancillary works
Powerstown , Milford , Carlow
the construction of a bungalow style dwelling, on site wastewater system, bored well, access from existing private lane and all associated site development works
Powerstown , Milford , Co. Carlow
the temporary placement of a mobile home on site for the duration of the construction of dwelling house as granted under PL Ref. 19/491 and temporarily connect to services as granted under same, all ancillary site works at services
Garryhundon , Milford , Co. Carlow
to construct a dormer style dwelling house, garage, septic tank and associated percolation area, bored well, new site entrance, all ancillary site works and services
Garryhundon , Milford , Co. Carlow
of a partially complete domestic shed as built. Planning permission for the completion of same shed and for all other associated ancillary site development works
Garryhundon , Milford , Co. Carlow
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?