The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660240

N/A

Westmeath - Westmeath County Council

Proposed Development

RETENTION permission for an extension to an existing dwelling house together with all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Ballynakill , Moate , Co. Westmeath
Applicant
N/A
Application Type
RETENTION
Planning Authority
Westmeath County Council
Site Area
0.69 ha

Timeline

Registration Date
12 May 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660300CONDITIONAL6 Jun 2026

RETENTION permission for an extension to an existing dwelling house together with all associated site works

Ballynakill , Moate , Co. Westmeath

702m
2560450CONDITIONAL10 Sept 2025

to construct new slatted shed, new dungstead and ancillary site works

Ballynakill , Moate , Co Westmeath

760m
21691CONDITIONAL23 Dec 2021

(i) the conversation of a former house into a habitable dwelling, (ii) Increase the eaves, ridge height and first floor level of dwelling (iii) demolition of 3 sheds located on the south elevation of the dwelling and demolition of existing porch located on the east elevation of the dwelling (iv) construction of an extension to the south elevation of the dwelling, construction of a porch to the east elevation, conversion of existing attached shed on the north elevation to 1&1/2 storey habitable space, increasing eaves and ridge height of same and the addition of rooflights to the west elevation of the dwelling, (iv) alterations to windows and door openings on the east, west and north elevations and the addition of new window openings to east and west elevations (v) the addition of a natural stone finish to sections of the dwelling (vi) the installation of a treatment system and percolation area (vii) and construction of a new dual entrance and all associated site works

Ballynamuddagh , Moate , Co Westmeath

798m
2660272CONDITIONAL23 May 2026

development which will consist of the following: (i) Single storey extension to the west elevation and the east elevation of the existing dwelling (ii) minor elevational changes to the north elevation and all associated site works

Ballinamudda , Moate , Co. Westmeath

870m
21360CONDITIONAL1 Jul 2021

Construction of a dwelling house, domestic garage, single dwelling treatment system with percolation area and associated site works

Attymurtagh , Castledaly , Co Westmeath

942m
2560345N/A8 Jul 2025

permission to construct a milk silo tank and all ancillary site works.

Moneen , Ballynakill , Moate Co Westmeath.

942m
2560393CONDITIONAL5 Aug 2025

to construct a milk silo tank and all ancillary site works

Moneen , Ballynakill , Moate Co Westmeath.

1.2km
21517CONDITIONAL22 Sept 2021

to construct a dwelling house and detached garage with treatment system and percolation area with all ancillary site works

Curries , Moate , Co Westmeath

1.3km
197029CONDITIONAL11 Feb 2019

The development consists of the following: Retention of (i) a single storey extension to the north elevation of the existing dwelling (ii) a single storey porch to the east elevation of the existing dwelling (iii) and a boiler house located to the south elevation of the existing dwelling and all ancillary site works.

Ballyscarvan , Moate

1.3km
21565CONDITIONAL19 Oct 2021

to construct an extension to an existing dwelling. The application will also include a domestic garage, new effluent treatment system and percolation area, the decommissioning of existing septic tank and percolation area, minor alterations to existing elevations and all associated site works and drainage.

Gorteen , Moate , Co. Westmeath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?