2660246
N/AKilkenny - Kilkenny County Council
Proposed Development
We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.
View the full application file on the council's planning portal →Application Details
- Location
- Ballytobin , Co. Kilkenny , Ireland
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 8.96 ha
Timeline
- Registration Date
- 24 April 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. The Development consists of works within the curtilage of Ballytobin House, a protected structure, reference ‘C315’ as listed on the County Kilkenny Record of Protected Structures. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Ballytobin & Ballyhall , Co. Kilkenny , Ireland
for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR).
Ballytobin & Ballyhall , Co. Kilkenny
to construct a new agricultural storage shed for the purpose of storing dry farm produce along with all associated site works
Ballaghtobin , Callan , Co Kilkenny
to construct a bungalow, garage, entrance, wastewater treatment system with soil polishing filter, borehole, soakpits and all other associated site works
Coolaghmore , Callan , Co. Kilkenny
for single storey kitchen extension to side of existing house and associated site works at
Coolaghmore , Callan , Co Kilkenny
for new dormer type dwelling house, wastewater treatment system, new entrance and associated site works
Ballytobin , Callan , Co Kilkenny
to erect a cubicle house, slurry storage tanks, an over ground steel slurry storage tank, reception tank & ancillary concrete works on lands
Caherleske , Callan , Co Kilkenny
is being sought for the existing Anaerobic Digester biogas facility at Camphill Ballytobin that received planning permission 1996 and was constructed and commissioned in 1998. (planning reference number 9698) Aspects of the facility that were constructed were at variance with the original permission set of drawings and retention is sought to rectify this.
BEOFS , Ballytobin , Callan
is being sought for the existing Anaerobic Digester biogas facility at Camphill Ballytobin that received planning permission 1996 and was constructed and commissioned in 1998. (planning reference number 9698) Aspects of the facility that were constructed were at variance with the original permission set of drawings and retention is sought to rectify this.
BEOFS , Camphill Ballytobin , Callan
sought for alterations and extensions to previously permitted residential premises to include : 1)Demolition of single storey residential accommodation, 2) Demolition of glazed lean-to conservatory 3)Hallway extension, 4)Entrance lobby extension, 5)Bedroom extension, 6)Corridor extension, 7) Use of part of the premises as ancillary offices; and all associated works at
Gabriels , Caherlesk , Callan
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?