2660261

N/A

Clare - Clare County Council

Proposed Development

for the construction of a detached dwelling house, entrance, driveway, packaged wastewater unit with percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Apr 2026

  2. Further information requested

    16 Jun 2026

Application Details

Location
Kilmore , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.081 ha
Floor Area
167.5 sq m
Residential Units
1

Timeline

Registration Date
23 April 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

32m
24136N/A25 Apr 2024

the development consists of modifications of 1) existing dwelling by constructing a partly two storey extension to both sides and rear of the existing property following the demolition of previous publican house storage room and 2) all associated ground works

Kilmore , Co Clare

33m
2460423REFUSED4 Sept 2024

for the change of use of an existing derelict public house for use as a dwelling house. Permission is also being sought for the following to facilitate the change to a dwelling house:- 1) renovation of the existing building to include elevational changes; 2) demolition of existing single storey extension to the rear; 3) construction of a two storey extension to the rear; 4) construction of a two storey side extension to both sides ; 5) provision of 3 number rooflights to the rear existing roof slope and 6) all associated site development works

Wuthering Heights , Kilmore , Co Clare V94 N8W5

35m
21363CONDITIONAL16 Apr 2021

for the construction of a dwelling house, detached garage, recessed entrance with piers, waste water treatment plant with polishing filter, bored well and all ancillary site works

Kilmore , Co Clare

48m
18408CONDITIONAL21 May 2018

for the construction of a shared vehicular entrance, 2 dwelling houses each with private well & domestic wastewater treatment system & polishing filter system together with all associated site works.

Kilmore , Co Clare

48m
17830REFUSED27 Oct 2017

for the construction of a shared vehicular entrance, 2 dwelling houses each with private well, domestic waste water treatment system and polishing filter system together with all associated site works

Kilmore , Co. Clare

60m
21186CONDITIONAL3 Mar 2021

to construct a stepped dwelling house, domestic garage, package wastewater treatment system with polishing filter, new entrance and all associated site works

Kilmore , Co Clare

115m
2460516N/A22 Oct 2024

for the construction of a vehicular entrance off private roadway, dwelling house, proprietary wastewater treatment system with polishing filter together with all associated site works

Kilmore , Co Clare

132m
2460518N/A22 Oct 2024

for the construction of a vehicular entrance off private roadway, dwelling house, proprietary wastewater treatment system with polishing filter together with all associated site works

Kilmore , Co Clare

161m
2460517N/A22 Oct 2024

for the construction of a vehicular entrance off private roadway, dwelling house, proprietary wastewater treatment system with polishing filter together with all associated site works

Kilmore , Co. Clare

191m
2460519REFUSED22 Oct 2024

for the construction of a vehicular entrance off private roadway, dwelling house, proprietary wastewater treatment system with polishing filter together with all associated site works

Kilmore , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.