The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660265

N/A

Clare - Clare County Council

Proposed Development

the development will consist of: 1. Site Access 2. Construction of a dwelling house 3. Effluent treatment system 4. Construction of a domestic garage 5. All associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Apr 2026

  2. Application withdrawn

    28 Jul 2026

  3. Decision due (upcoming)

    16 Sept 2026

Application Details

Location
Kings Road , Killadysert , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.283 ha
Floor Area
175 sq m
Residential Units
1

Timeline

Registration Date
24 April 2026
Status
WITHDRAWN
Decision
N/A
Decision Due
16 September 2026
Withdrawn
28 July 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

99m
2560131CONDITIONAL14 Mar 2025

for the construction of a new dwelling house and garage complete with a wastewater treatment system and ancillary works

King’s Road , Kildysart , Co Clare

153m
17549CONDITIONAL18 Jul 2017

to erect dwelling house, garage, foul sewer treatment plant, percolation area and new site entrance

Kings Road , Kildysart , Co. Clare

251m
17917CONDITIONAL27 Nov 2017

to construct an extension to the rear of the existing dwelling, construct a new private garage and alter existing site entrance along with all associated site works

Shorepark , Kildysart , Co. Clare

284m
2460449CONDITIONAL19 Sept 2024

to make the following alterations to the existing dwelling house: a) demolish existing front conservatory and rear extension; b) construct new replacement extension to rear of house; c) construct new front porch; d) make elevational changes to the house; e) upgrade existing wastewater treatment system; and f) all associated site works and services. A Natura Impact Statement (NIS) will be submitted with the application

Shorepark , Kildysart , Co. Clare

291m
2360340REFUSED31 Aug 2023

to demolish the existing sub-standard dwelling house and to construct a replacement dwelling house with minor elevational and internal layout changes along with a new private on-site domestic wastewater treatment system and all other associated ancillary site works.

Shorepark , Kildysart , Co. Clare V95 VF57

291m
211373CONDITIONAL22 Dec 2021

to make the following alterations to the existing dwelling house. a) demolish existing front conservatory and rear utility; b) construct new orangery extension to the house; c) make elevational changes to the house and adjoining stables and outbuilding; d) convert existing stables/outbuildings to residential use ancillary to the main dwelling; and e) all associated site works and services

Shorepark , Kildysart , Co Clare

322m
2560809CONDITIONAL18 Dec 2025

to construct an extension to the existing dressing room facility incorporating a multi-purpose indoor area along with all associated works

Ballynacragga , Kildysart , Ennis

322m
2460109CONDITIONAL13 Mar 2024

to (1) RETAIN the erection of flood lighting standards and the construction of two dugouts, (2) Planning permission for the provision of a walking track incorporating low level lighting, provision of flood lights on the aforementioned lighting columns and construction of a spectator stand along with all associated works

Ballynacragga , Kildysart Ennis , Co. Clare

478m
22476CONDITIONAL27 May 2022

to construct an additional afterschool room along with all associated works

Kildysart , Co Clare

518m
23565CONDITIONAL10 Nov 2023

to convert the former shop and residence at the above address into two number townhouses. The proposed development will consist of internal modifications to the existing building including closing up internal access between the two areas as well as the formation of a new front entrance

Mulhern's , Main Street , Kildysert

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?