The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660268

N/A

Sligo - Sligo County Council

Proposed Development

We, St. Michaels GAA Club, wish to apply for full planning permission for the following works: 1. permission to upgrade the existing clubhouse from a single storey to a two-storey structure, the extended building will encompass larger changing room facilities on the ground floor. 2. The 1st floor will include a meeting room, kitchen area, viewing balcony and additional toilet facilities. 3. To construct 2 no. ground floor single storey extensions to the existing clubhouse to include additional toilet facilities and storage facilities. 4. To construct a pedestrian pathway around the perimeter of the facility to include low level lighting. 5. To construct a pedestrian pathway to connect both existing GAA pitches. 6. To construct spectator perimeter fencing on both pitches. 7. To fit solar panels to the roof of the new 2 storey building. 8. To construct a new spectator stand, scoreboard and all ancillary works. The works are located at St. Michaels GAA Club, Kingsfort, Ballintogher, Co. Sligo.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jul 2026

  2. Further information requested

    24 Aug 2026

Application Details

Location
St. Michaels GAA Club , Kingsfort Ballintogher , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
3.81 ha

Timeline

Registration Date
3 July 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

189m
15132CONDITIONAL22 Apr 2020

development consisting of the construction of a domestic garage together with all associated ancillary works

Altvelid , Ballintogher , Co. Sligo

305m
20125CONDITIONAL27 Apr 2020

PP & PR - development consisting of the following: retention of a change of use from commercial use to a child care facility and all ancillary services. We also apply for full planning permission to construct a car parking facility on the site

Tiratick , Ballintogher , Co Sligo

424m
2247CONDITIONAL11 Feb 2022

Development consisting of the following works: 1. Retention of existing first floor attic conversion from storage to habitable rooms along with 3 roof lights to front and 1 one rear, 2. Replace 2 no. existing Velux windows to the rear with 2 flat roof dormers with windows suitable for escape and rescue, 3. Include one additional Velux window to front, 4. Construction of a flat roof extension to rear of house 35m2 floor area, 5. Elevational changes to existing south side gable to form new window and door opening for access to newutility room along with all associated site works

9 Kingsfort , Ballintogher , Co Sligo

476m
20130CONDITIONAL30 Apr 2020

Development consisting of the following works: 1. Demolition of existing shelter structure located to the east of existing school; 2. Construction of a new classroom and link corridor extension to the east and north sides of the existing school including signage; 3. Provision of alterations to staffroom block to west side of existing school; 4. Elevation changes to the existing school; 5. Provision of new access ramp and external steps to front (north) of school and provision of a new playground to rear (south) of school; 6. Connection of foul drainage to existing public sewer, connection of surface water into existing system on site and all associated site works

Kingsfort , Ballintogher , Co Sligo

476m
17305CONDITIONAL9 Aug 2017

for development consisting of the construction of an additional temporary prefab type classroom, connect to all public services and construct a new school sign on the front gable of the school together with all associated ancillary works

Kingsfort , Ballintogher , Co. Sligo

494m
2560171CONDITIONAL5 May 2025

1. Construction of a new storey and a half type dwelling 2. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice 3. Construction of a new vehicular entrance and access road to serve dwelling 4. All associated site development works

Rathgeean , Ballintogher , Co. Sligo

603m
18105CONDITIONAL5 Apr 2018

Development consisting of the construction of five, two storey detached dwelling houses on existing vacant sites located to the east of existing house number six.

Kingsfort Manor , Ballintogher , Co Sligo

608m
2360381CONDITIONAL23 Dec 2023

(a) construct one detached two storey dwelling house on vacant site number one, (b) construct two semi-detached two storey dwelling houses on vacant site number thirty six and thirty seven and (c) construct one detached two storey dwelling house on vacant site number thirty eight

Kingsfort Manor Housing Estate , Ballintogher , Co. Sligo

638m
17123CONDITIONAL3 Apr 2017

development consisting of the construction of 1 no. two-storey detached dwelling house and 2 no. two-storey semi-detached dwelling houses on vacant sites located to the south of house no. 35. Permission is also sought for completion of the public footpath, road, vehicle turning area and site services adjacent to these proposed dwelling houses

Kingsfort Manor , Ballintogher , Co. Sligo

841m
2460200N/A7 Jun 2024

Permission to construct new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works

Rathgeean , Ballintogher , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?