2660297

N/A

Sligo - Sligo County Council

Proposed Development

to decommission the existing Septic tank and percolation area on site and install a new wastewater treatment system on site consisting of an Effluent treatment unit and soil polishing filter, together with all ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jul 2026

  2. Decision due (upcoming)

    14 Sept 2026

Application Details

Location
Killoran South , Lavagh Ballymote , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.413 ha

Timeline

Registration Date
21 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
14 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.5km
2131N/A9 Feb 2021

development consisting of (a) build a storey and half extension to the side of existing dwelling house, 109 square metres, (b) make alterations to front elevation of the existing dwelling house, together with all ancillary site works and services

Gortnadrass , Lavagh , Ballymote

1.5km
2660269N/A3 Jul 2026

(a) Retention Permission for an existing calf shed (b) Planning Permission for demolition of an existing calf rearing shed (c) Planning Permission for the construction of an agricultural building consisting of cubicles and underground slatted storage tanks (d) Planning Permission for the construction of an agricultural building consisting of calf rearing pens and all associated site works

Killoran North , Coolaney , Co. Sligo

1.6km
2360241CONDITIONAL12 Sept 2023

development consisting of: retention permission for: (i) rear porch, corridor and shower room. (ii) With permission to upgrade existing sewerage system to new treatment system and percolation area. (iii) With connection to existing services and all associated site works

Deenodes , Lavagh Ballymote , Co. Sligo

1.6km
2360243CONDITIONAL13 Sept 2023

(a) alterations to elevations of existing dwelling house, (b) extension to front and side of existing dwelling house, (c) demolish rear section of existing dwelling house (d) installation of a new wastewater treatment system consisting of an effluent treatment unit and soil polishing filter on site, (e) new site entrance for vehicular access, together with all ancillary site works and services on site

Tullanaglug , Tubbercurry , Co. Sligo

1.6km
22289CONDITIONAL24 Aug 2022

development consisting of the construction of a new two storey detached dwelling and garage following the demolition of the existing dwelling, the installation of a new septic tank with percolation area, new entrance gates and pillars and associated site works

Carrownloughan , Coolaney , Co. Sligo

1.8km
22436CONDITIONAL20 Dec 2022

development consisting of (a) demolish existing dwelling house and shed on site, (b) construct a dwelling house, garage, septic tank and percolation area, together with all ancillary site works and services

Claragh Scotch , Ballinacarrow , Ballymote

1.8km
18484CONDITIONAL10 Dec 2018

for development consisting of an existing 36 metre high telecommunications support structure with antennas, equipment container and associated equipment within a fenced compound and access track (Previous ref. No PL 07/1134). The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network

Cunghill , Lavagh , Co. Sligo

1.8km
2460332CONDITIONAL2 Oct 2024

(1) the part demolition of existing dwelling house (2) alterations to existing dwelling house (3) extensions to existing dwelling house including the raising of part of the existing roof (4) new garage (5) a new effluent treatment system and percolation area (6) formation of new site entrance (7) and all associated site works

Carrowmurray , Coolaney , Co Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?