The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660356

CONDITIONAL

Clare - Clare County Council

Proposed Development

for the construction of an entrance, dwelling house, garage, driveway, advanced waste water treatment system together with all ancillary site development works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 May 2026

  2. Decision: CONDITIONAL

    23 Jul 2026

  3. Decision due

    24 Jul 2026

Application Details

Location
Culleen , Newmarket on Fergus , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.538 ha
Floor Area
241 sq m
Residential Units
1

Timeline

Registration Date
30 May 2026
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
23 July 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

185m
21697CONDITIONAL2 Jul 2021

To construct a single dwelling house, advanced water treatment system and ancillary site works.

Culleen , Newmarket-on-fergus , Co. Clare

332m
23454CONDITIONAL22 Aug 2023

to renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works

Cullen , Newmarket-on-Fergus , Co Clare

660m
21347CONDITIONAL15 Apr 2021

for development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works

Culleen , Drumline , Co Clare

668m
21683CONDITIONAL30 Jun 2021

for an extension to dwelling house and carrying out of ancillary works

Killulla Stud , Killulla , Newmarket-on-Fergus Co Clare

682m
25190N/A12 Jun 2025

for development which will consist of 1. Land reclamation for agricultural purposes by levelling ground between two contours using imported inert soil and stone class (170504) concrete class (170101) for roadways, together with the associated site works. 2 RETENTION permission of land reclamation of existing lands for agricultural use under planning references 20/712 and 21/347

Ballycasey Beg , Culleen , Newmarket-on-Fergus Co. Clare

701m
20712CONDITIONAL1 Oct 2020

the development consists of the construction of a slatted unit and associated site works

Culleen , Drumline , Co Clare

964m
24435N/A23 Dec 2024

for the development at this site at the townlands of Ballycar, lislea, Kilulla, Mogullaan and Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare The development will consist of an application for a 10-year development phase followed by a 40-year operational lifespan for a solar farm on a site encompassing approximately 109 hectares. The proposed development includes the installation of ground-mounted solar photovoltaic (PV) panels on steel frames accross the site. The project will incorporate 256 inverters arranged in a series string configuration, supported by 24 electrical skid hardstands that will house transformer units and a ring main unit facility. The development also entails the construction of a transformer compound to facilitate a connection to the existing 110kV Drumline Substation. An internal network cable will be installed to enable an under-the-fence connection from the on-site transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18 metre-high lightning monopole mast. Approximately 8.6 Kilometres of new and upgraded internal access tracks will be developed to provide connectivity within the site. Six new site entrances are proposed, including modification to existing junctions to accommodate construction access and the delivery of abnormal loads. These access points will connnect to Local Roads (L3166, Ballycar Road L3174 and L3136) and the Regional Road R458. All new entrances will link directly to the public road network. This application seeks approval for all associated site development and ancillary works necessary to support the successful delivery and operation of the proposed solar farm. A Natura Impact Statement will also be submitted to the Planning Authority with this application

Ballycar Lislea Killulla , Mogullaan & Crossagh Rathlaheen South , Culleen Drumline & Ballycasey Beg Co Clare

965m
25260CONDITIONAL8 Aug 2025

for the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application

Mogullaan Crossagh , Rathlaheen South Culleen , Drumline and Ballycasey Beg Co. Clare

1.1km
2560551CONDITIONAL5 Sept 2025

for the change of use of existing detached garage to granny flat with disabled access including alterations to existing building, connection to existing services & all ancillary site works

Mogullaan , Newmarket on Fergus , Co. Clare

1.1km
2073CONDITIONAL12 Feb 2020

for development which will consist of the construction of a dwelling house, a proprietary waste water treatment system and ancillary site works

Leamaneigh Beg , Newmarket on Fergus , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?