2660375

N/A

Cavan - Cavan County Council

Proposed Development

for (a) The removal of existing 2 storey log cabin (b) construction of a new replacement 2 storey cabin utilizing the same footprint and constructed on the existing concrete slab and foundations (c) Decommissioning of existing septic tank system, installation of a pumping chamber and connection to existing sewage treatment system serving the hotel (d) together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Jul 2026

  2. Further information requested

    21 Aug 2026

Application Details

Location
Crover , Mountnugent , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.24 ha

Timeline

Registration Date
1 July 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

96m
2320CONDITIONAL24 Jan 2023

for the erection of a single storey extension to the rear of existing hotel to include store room, office and new toilets and all associated site works

Crover House Hotel , Crover , Mountnugent

192m
17338CONDITIONAL26 Jul 2017

for (a) the removal of an existing porch to the south elevation (b) the construction of a two storey extension to "Lake View" bar on the south elevation (c) the construction of a single storey extension to the Main Entrance on south elevation (d) alteration to existing carpark layout with all associated site works

Crover House Hotel , Crover , Mountnugent

196m
22523CONDITIONAL21 Dec 2022

erect prefabricated machinery storage shed and associated site works

Crover , Mountnugent , Co Cavan

199m
17551CONDITIONAL22 Dec 2017

to retain and complete single storey kitchen extension to the rear of hotel together with all associated site works

Crover House Hotel , Mountnugent , Co. Cavan

593m
18313CONDITIONAL25 Jul 2018

for the demolition of an existing dwelling and domestic garage and the construction of a replacement, part two storey part single storey domestic dwelling with attached carport, entrance gates and piers, upgrade of existing septic tank to new treatment system and polishing filter in accordance with EPA guidelines, together with all associated site works. A Natura Impact Statement (NIS) is being submitted to the Planning Authority with this application

Crover , Mountnugent , Co. Cavan

689m
17521REFUSED13 Dec 2017

to construct new entrance walls, piers, and all associated site works

Fortland , Mountnugent , Co. Cavan

690m
17361CONDITIONAL18 Aug 2017

to decommission and relocate the existing septic tank as constructed under PL64/7401 and permission to construct a new sewage treatment plant and percolation area within the boundary of my existing site and attached ancillary site works

Fortland , Mountnugent , Co. Cavan

690m
21682CONDITIONAL10 Nov 2021

for alterations & dormer extension to side elevation of the existing dwelling to include entrance hall, utility room, toilet, kitchen, pantry, dining, living area and at first floor, a bedroom, dressing and bathroom

Fortland , Mountnugent , Co Cavan

741m
2660212CONDITIONAL28 Apr 2026

to construct a two-storey dwelling, a single storey detached domestic garage and install propriety sewage treatment unit and percolation area, together with all associated site works, at Fortland, Mount Nugent, Co. Cavan, on behalf of Orna Cassells. A Natura Impact Statement will be submitted to the Planning authority with the application

Fortland , Mountnugent , County Cavan

1.2km
19206CONDITIONAL31 May 2019

retain the following: (1) position of site entrance and alterations to site boundaries and (2) single storey detached domestic garage and all associated works

Killyfassy , Mountnugent , Co Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?