The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660398

N/A

Kildare - Kildare County Council

Proposed Development

(A) construction of a one and a half storey type house to form a family cluster, (B) garage / store for domestic use, (C) the installation of an Corcoran wastewater treatment system with a circle 7 tertiary treatment unit and percolation area and (D) Combined recessed entrance with applicant’s brother’s house file ref no. 21/731 and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Apr 2026

  2. Further information requested

    5 Jun 2026

  3. Further information received

    6 Aug 2026

  4. Decision due (upcoming)

    2 Sept 2026

Application Details

Location
Ladytown , Newbridge , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.276 ha
Floor Area
246 sq m
Residential Units
1

Timeline

Registration Date
14 April 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
2 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
2560710N/A26 Jun 2025

for (A) construction of a one and a half storey type house to form a family cluster, (B) garage / store for domestic use, (C) the installation of an Corcoran wastewater treatment system with a circle 7 tertiary treatment unit and percolation area and (D) Combined recessed entrance with applicant’s brother’s house file ref no. 21/731 and all associated site works

Ladytown , Newbridge , Co. Kildare

8m
21731CONDITIONAL26 May 2021

(a) Erection of one and a half storey type house, (b) Garage/fuel store for domestic use, (c) Installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (d) New vehicular recessed entrance and access driveway and all associated site works. Revised by Significant Further Information which consists of revised site location and layout including revised location of entrance and wastewater treatment

Ladytown , Newbridge , Co. Kildare.

18m
2560723REFUSED27 Jun 2025

for (A) construction of a one and a half storey type house to form a family cluster, (B) garage / store for domestic use, (C) the installation of an Corcoran wastewater treatment system with a circle 7 tertiary treatment unit and percolation area and (D) Combined recessed entrance with applicant’s brother’s house file ref no. 21/731 and all associated site works

Ladytown , Newbridge , Co. Kildare

135m
22642CONDITIONAL27 May 2022

1 no. advertising signage to the front façade and 1 no. advertising signage to the rear façade of existing light industrial unit and all associated development works

Unit L2 Willow Drive , Naas Enterprise Park , Ladytown Naas Co. Kildare

136m
201055CONDITIONAL15 Sept 2020

The amalgamation of structures and property at 1b and 1c Willow Drive, Naas Enterprise Park. The proposed development will include a double height, single storey building to link Units 1b and 1c and reconfiguration of space inside both buildings to create a single, operational, production facility including warehouse storage and ancillary office space (with an internal link between the existing ancillary office space in Units 1B and 1C within the link building); a security hut; rising barriers at access points on the site; cycle parking and smoking shelters and ESB substation building to the south of the site; mechanical plant compounds to the west of Unit 1c; new dock levellers; two silo structures to the west of Unit 1c (including the relocated silo currently located to the east of Unit 1b); two sprinkler tanks and pump house to the north of the site; an HGV maintenance and washing area to the north of the site; gas meter building to the south west of the site; reorganization of parking to the front of the building; removal of structures in the rear yard of Unit 1b and ancillary demolition to facilitate the development; new boundary fencing; all proposed signage; all ancillary underground drainage to facilitate the development and all other ancillary works or uses such as revised HGV parking and waste handling areas to the north of the units

Units 1b & 1c Willow Drive , Naas Enterprise Park , Ladytown

161m
22560CONDITIONAL16 May 2022

the construction of a double height single storey extension to the rear of the property with alterations to previously granted planning reference 20/1055 to consist of alteration to ESB Substation, bicycle and smoking shelter location, alterations to elevations, reconfiguration to internal layouts and loading dock pods, alterations to site services and all ancillary site development works

Units 1b and 1c Willow Drive , Naas Enterprise Park , Ladytown Naas

162m
221536CONDITIONAL23 Dec 2022

previously permitted under planning reference no's 20/1055 & 22/560. The development will consist of the retention of a) alterations to site layout, b) relocation of silos, c) relocation of external stairs and all associated and ancillary works

units 1b and 1c Willow Drive , Naas Enterprise Park

176m
2460889N/A9 Sept 2024

for alterations to front elevation cladding, provision of new glazing/window and all associated development works

Unit 1B Willow Drive Naas Enterprise Park , Ladytown , Naas

185m
2461065CONDITIONAL17 Oct 2024

for alterations to front elevation cladding, provision of new glazing/window and all associated development works

Unit 1B Willow Drive Naas Enterprise Park , Ladytown , Naas

199m
2460737REFUSED31 Jul 2024

for (A) construction of a one and a half storey type house, (B) garage / store for domestic use, (C) the installation of an Oakstown BAF wastewater treatment system with polishing filter percolation area and (D) new vehicular recessed entrance & drive way and all associated site works

Ladytown , Newbridge , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?