2660403
N/AMayo - Mayo County Council
Proposed Development
permission for change of use of existing vacant school building to dwelling house with integrated independent living unit & to include alterations to the existing layout & elevations, relocation of site entrance and to carry out all ancillary site works.
View the full application file on the council's planning portal →Application Timeline
Application received
21 May 2026
Further information requested
14 Jul 2026
Further information received
13 Aug 2026
Decision due (upcoming)
9 Sept 2026
Application Details
- Location
- Carha , Bonniconlon , Ballina
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
- Site Area
- 0.472 ha
Timeline
- Registration Date
- 21 May 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 9 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CHANGE OF USE OF SCHOOL BUILDING TO DWELLINGHOUSE, ALTERATIONS TO FRONT AND REAR ELEVATIONS, ALTERATIONS TO REAR ROOF AND ALTERATIONS TO SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS.
CARHA , BONNICONLON , BALLINA
Construction of a Bungalow Dwelling, Effluent Treatment System and together with site access & all associated site works.
Carha , Bonniconlon , Co Mayo
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
CARHA , BONNICONLON , BALLINA
IMPORTATION OF INERT FILL SOILS MATERIAL FOR AGRICULTURAL IMPROVEMENT PURPOSES, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES
CARHA , BUNNYCONNELLAN , BALLINA
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
Cahra , Bonniconlon , Co. Mayo
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
Cahra , Bonniconlon , Co. Mayo
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
Cahra , Bonniconlon , Co. Mayo
construction of a slatted shed with underground slurry storage tank along with all associated site works
Carra , Bonniconlon , Ballina
CONSTRUCT NEW DWELLING HOUSE, CONSTRUCT NEW DOMESTIC GARAGE, CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM, CONSTRUCT NEW DOMESTIC ENTRANCE OFF PUBLIC ROAD AND CARRY OUT ALL REQUIRED ANCILLARY WORKS ON SITE
CARROWNAGLOGH , BONNICONLON , BALLINA
development consisting of the construction of 1 No. Domestic Garage incorporating Storage & Utility. Including all other ancillary site work and services
Knockbrack , Corballa , Co. Sligo
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?