The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660410

REFUSED

Limerick - Limerick County Council

Proposed Development

modifications and widening of the existing dwelling entrance: demolition of existing pier and part of front boundary wall. Construction of new pier and widened gateway entrance with associated elevational modifications, including all associated site works above and below ground

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Apr 2026

  2. Decision due

    4 Jun 2026

  3. Decision: REFUSED

    4 Jun 2026

Application Details

Location
Sacre Coeur , Fortmary Park , North Circular Road Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
0.068 ha

Timeline

Registration Date
10 April 2026
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
4 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

28m
21446CONDITIONAL8 Apr 2021

demolition of existing garage and lean to extension to rear, two storey extension to side of existing dwelling and single storey extension to rear of existing dwelling, widening of existing vehicular access to front with new gate and associated site works

Glenbeigh , Fortmary Park , North Circular Road Limerick

30m
19889N/A6 Sept 2019

the demolition of existing garage and lean to extension to rear, two storey extension to side of existing dwelling and single storey extension to rear of existing dwelling and associated site works

Glenbeigh , Fortmary Park , North Circular Road Limerick.

51m
2560882N/A3 Sept 2025

extension to Granny Flat and Permission for Incorporating Upgraded Granny Flat as Extra En-Suite Bedroom to Existing Home with Courtyard and for the Widening the Vehicular Entrance and Installation of Electric Gate

Palm Court , North Circular Road , Limerick.

52m
2460871REFUSED30 Aug 2024

the development that will consist and consists of: Extension to Granny Flat and Permission for Widening the Vehicular Entrance and Installation of Electric Gate

Palm Court , North Circular Road , Limerick

58m
2561068REFUSED22 Oct 2025

extension to granny flat and permission for incorporating upgraded granny flat as extra en-suite bedroom to existing home with courtyard and for the widening the vehicular entrance and installation of electric gate

Palm Court , North CIrcular Road , Limerick.

80m
22249N/A3 Mar 2022

external canopy over front door and attic conversion including rear rooflights

4 Eden Court , North Circular Road , Limerick

106m
2230CONDITIONAL14 Jan 2022

part demolition and reconstruction of existing rear structure. Construction of new single storey rear/ side extensions and first floor rear extension and all associated site works to existing dwelling house

30 Revington Park , North Circular Road , Co. Limerick

107m
22561CONDITIONAL20 May 2022

the construction of works to front of boundary wall including new vehicular entrance with gate & piers and hard standing for the parking of two cars and all associated site works

Manderville , Fort Mary Park , North Circular Road Limerick

109m
201346CONDITIONAL15 Dec 2020

demolition of single storey annex to LHS of dwelling and sunroom to rear of dwelling, provision of a 2-storey extension to LHS of dwelling with study, WC, utility and kitchen to ground floor and 2 no. bedrooms with 1 no. ensuite to first floor, provision of single storey extension to rear of dwelling to accommodate dining & living space, provision of single storey garden building with loggia and shed, provision to externally insulate existing 2-storey dwelling and associated site works

2 Eden Court , North Circular Road , Limerick

122m
20400CONDITIONAL19 May 2020

a single storey extension to an existing two storey dwelling house and all associated site works

Currabawn , Fortmary Park , North Circular Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?