The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660417

N/A

Cavan - Cavan County Council

Proposed Development

for 1) Change of use of existing detached domestic garage to dwelling, 2) Erection of single storey extension to the front and side, 3) Alterations to the existing plans and elevations, 4) All ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2026

  2. Decision due (upcoming)

    22 Sept 2026

Application Details

Location
Kill , Kilnaleck , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.23 ha
Floor Area
46 sq m
Residential Units
1

Timeline

Registration Date
29 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
22 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

217m
2297CONDITIONAL10 Mar 2022

to construct a biomass boiler house and ancillary storage silo, site services and development works

Kill , Kilnaleck , Co. Cavan

318m
2460274N/A19 Jun 2024

of 1. Constructing a 1 bed kitchen diner ground floor extension (154.5sqm) to the existing dwelling 2. To reconfigure the interior of the existing dwelling with minor alterations externally which include blocking up the front door 3. To decommission the existing sewage system and upgrade to a new BAF Sewage Treatment System with percolation area and with all ancillary site development works

Kilnaleck , Kill , Co. Cavan

323m
23265CONDITIONAL27 Jul 2023

to install a 200KV ground mounted PV array, associated mounting frames, site services and development works

Kill , Kilnaleck , Co Cavan

552m
2522CONDITIONAL7 May 2025

to construct a two storey type dwelling with a detached domestic garage sewerage treatment unit percolation area erect new entrance walls and piers and all associated site works

Kill , Kilnaleck , Co Cavan

583m
2360047CONDITIONAL7 Jun 2023

for alterations to an existing dwelling to include the demolition of front porch structure and rear extension, the construction of a part two storey, part single storey extension to the rear, amendments to the front elevation, the construction of an attached carport and domestic garage, new site entrance including new entrance gates and piers, upgrade of existing waste water treatment system with percolation area and all associated site works

Drumbee , Kilnaleck , Co. Cavan

650m
2560555CONDITIONAL11 Sept 2025

for 12 number single storey timber pitched roof shed buildings each with a metal fenced external area attached to each shed building. The sheds are to be used to house the animals for the purpose of the business

Drumbee , Kilnaleck , Co Cavan

825m
2360229CONDITIONAL16 Oct 2023

to RETAIN and complete alterations to existing floor plans and elevations of existing dwelling, also planning PERMISSION sought to erect extension to the rear, erect detached domestic garage with carport and install sewage treatment facilities, complete entrance and siteworks and all ancillary works granted under previous planning reference 06362

Kill , Kilnaleck , Co. Cavan

825m
2360129N/A4 Aug 2023

to alter floor plans and elevations of existing dwelling, erect extension to the rear, erect detached domestic garage with carport and install sewage treatment facilities, complete entrance and siteworks and all ancillary works granted under previous planning reference 06362

Kill , Kilnaleck , Co. Cavan

1.0km
22210CONDITIONAL25 May 2022

of changes made to house location, entrance location, front elevation, and domestic garage (prev. planning ref no. 90/18637)

The Green , Kilnaleck , Co Cavan

1.1km
1776CONDITIONAL8 Mar 2017

to erect fully serviced warehouse incorporating workshop, storage and all associated facilities, connection to existing services and all ancillary works

Kilnaleck , Co. Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?