The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660422

N/A

Cavan - Cavan County Council

Proposed Development

to develop Lavey Filing Station, as follows:- A. Demolish existing vacant two-storey dwelling, existing shop, stores, garage and associated structures. B. Construct new petrol service station and shop, incorporating off-licence, store, deli and associated office and toilet facilities. C. Provide 2 no. additional petrol pumps, extend canopy, alterations to existing carparking, new signage, connection to existing services, EV charging points and associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2026

  2. Decision due (upcoming)

    22 Sept 2026

Application Details

Location
Dublin Road , Knockanoark Stradone , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.32 ha

Timeline

Registration Date
29 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
22 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
2292CONDITIONAL8 Mar 2022

to provide off-licence within existing shop unit and associated works

Lavey Service Station , Dublin Road Knockanoark Stradone , Co. Cavan

227m
2560493CONDITIONAL25 Aug 2025

to retain single story extension to the rear of an existing building, a change of use from an existing storage area to meeting space and all associated internal alterations and ancillary works

Knockanoark , Stradone , Co. Cavan

463m
2462CONDITIONAL25 Sept 2024

for a proposed dry bedded calf shed proposed 2 no silage pits proposed dung stead and underground effluent storage tank and all associated site works

Corraghoe , Stradone , Co Cavan

463m
23340N/A22 Dec 2023

for a calf bedded shed, 2 no. silage pits, dung stead and underground effluent storage tank and associated site works

Corraghoe , Stradone , Co Cavan

563m
21294N/A17 May 2021

to retain development as previously granted under Planning Reference 01/1510 and subsequent altered Planning Reference 06/1431. The amendments include 1) Revised site layout and site boundary, 2) Revised location of dwelling as constructed and 3) All ancillary site development works

Lisnaglea , Stradone , Co. Cavan H12 R259

631m
22373N/A14 Sept 2022

to carry out the following alterations to existing dwelling house (1) demolish existing storey outbuilding to rear (2) construct new two-storey extension to side and rear (3) carry out modifications to existing elevations including renovation works to existing building (4) upgrade existing septic tank to new mechanical wastewater treatment system & percolation area

LISNAGLEA , STRADONE , CAVAN

642m
18306CONDITIONAL17 Jul 2018

to construct an extension to 1 no. free range poultry house together with all ancillary structures and all associated site works arising from the above proposed development

Knockanoark , Stradone , Co Cavan

713m
17416CONDITIONAL28 Sept 2017

to erect single storey detached storage shed and all ancillary works. Significant further information and revised plans have been submitted

Corragho , Stradone , Co. Cavan

725m
1953N/A21 Feb 2019

for alterations to previously approved planning permission (PL Ref: 08/1559 and extension of time PL Ref: 14/224) for change of use from storage unit to manufacture unit, alterations to site plan, additional office accommodation, alterations to elevations, new sewerage treatment facilities and all ancillary works

Lisnaglea , Stradone , Co. Cavan

737m
17355CONDITIONAL9 Aug 2017

to erect detached agricultural shed, new entrance and all ancillary works. Significant further information and revised plans have been submitted

Corragho , Lavey , Stradone

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?