2660425
CONDITIONALDonegal - Donegal County Council
Proposed Development
REFURBISHMENT, CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DWELLING INCLUDING ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
16 Mar 2026
Decision: CONDITIONAL
30 Apr 2026
Decision due
10 May 2026
Grant issued
3 Jun 2026
Application Details
- Location
- CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.179 ha
Timeline
- Registration Date
- 16 March 2026
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 April 2026
- Grant Date
- 3 June 2026
- Permission Expires
- 2 June 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF (A) A FRONT PORCH EXTENSION, (B) A REAR EXTENSION TO PROVIDE BEDROOM AND BATHROOM ACCOMMODATION AND (C) THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND SAND POLISHING FILTER TO DWELLING
CRAGHY , DUNGLOE , LETTERKENNY P.O.
ERECTION OF A DWELLING HOUSE WITH TREATMENT PLANT AND POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS
CROAGHNASHALLOG , DUNGLOE , LETTERKENNY P.O.
ERECTION OF A DWELLING HOUSE WITH TREATMENT PLANT AND POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS
CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO
ENTRANCE & DRIVEWAY SERVING EXISTING DWELLING
CROAGHNASHALLOG , DUNGLOE , CO DONEGAL
CONSTRUCTION OF A SHED AND A GARDEN ROOM INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CRAGHY , DUNGLOE , LETTERKENNY PO
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)
CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CROAGHNASHALLOG , DUNGLE , LETTERKENNY PO
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND WORKS TO CONNECT THE EXISTING DWELLING HOUSE GRANTED UNDER PLANNING REF NO. 92/927 TO THIS PROPOSED WASTEWATER TREATMENT SYSTEM
DUNGLOW , DUNGLOE , LETTERKENNY PO
CONSTRUCTION OF A NEW DWELLING HOUSE AND A DOMESTIC GARAGE
CARNMORE ROAD , DUNGLOE , LETTERKENNY P.O.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?