The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660446

N/A

Cavan - Cavan County Council

Proposed Development

to demolish out-building, construct single storey extension, carry out alterations to existing bungalow, revised elevations, site works and connect to existing services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Aug 2026

  2. Decision due (upcoming)

    6 Oct 2026

Application Details

Location
Clonandra , Redhills , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.505 ha
Floor Area
94.23 sq m
Residential Units
1

Timeline

Registration Date
12 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
6 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
18461CONDITIONAL1 Nov 2018

to retain as constructed single storey extension to existing dwelling house

Clonandra , Redhills , Co. Cavan

317m
2560065N/A26 Feb 2025

for alterations To Holiday home Development comprising the following:- A. As-built dormer holiday home unit 5, previous Permission 03/1793. B. Change of use of games room to studio accommodation unit. C. As-built activity building with sauna, shower and covered decking. D. Care-taker mobile home, tool sheds and decking area. E. Numerous winter gardens, covered areas and ancillary bait sheds, roof lights to unit 4, revised location of reed bed, revised site boundaries and associated site development works

Clonandra , Redhills , Co. Cavan

318m
2560111CONDITIONAL19 Mar 2025

for alterations To Holiday home Development comprising the following:- A. As-built dormer holiday home unit 5, previous Permission 03/1793. B. Change of use of games room to studio accommodation unit. C. As-built activity building with sauna, shower and covered decking. D. Care-taker mobile home, tool shed and decking area. E. Numerous winter gardens, covered areas and ancillary bait sheds, roof lights to unit 4, revised location of reed bed, revised site boundaries and associated site development works

Clonandra (known as Clonandra Cottages) , Redhills , Co. Cavan

385m
1864CONDITIONAL14 Feb 2018

to erect single storey agricultural storage building and all ancillary site works

Clonandra , Redhills , Co Cavan

396m
2660466N/A22 Aug 2026

for RETENTION of existing underground slurry storage tank with slatted area and solid passage area at ground level together with PERMISSION to (1) construct agricultural shed over existing storage tank subject to retention to incorporate loose bedded calf accommodation and feed passage areas, (2) Complete all ancillary site works and associated site structures

Clonandra , Redhills , Co. Cavan

399m
2247CONDITIONAL11 Feb 2022

to (1) Construct an agricultural slatted shed to incorporate slatted areas, cubicle accommodation, feed and link passages and underground slurry storage tanks, (2) Complete all associated structures and ancillary site works

Clonandra , Redhills , Co. Cavan

768m
2560063CONDITIONAL26 Feb 2025

to construct a new single storey dwelling house, form new combined site access onto existing access laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works

Aughtreagh , Redhills , Co. Cavan

1.4km
2360217REFUSED6 Oct 2023

of an existing prefabricated unit for storage use with hard-standing area surrounding the structure together with improvement works to existing roadside entrance and associated works, all within the curtilage of an existing dwellinghouse

Drumlaney , Redhills , Co. Cavan

1.4km
2360175N/A11 Sept 2023

to retain an existing prefabricated container unit for storage use within the curtilage of an existing dwelling house

Drumlaney , Redhills , Co. Cavan

1.4km
19346CONDITIONAL11 Sept 2019

for development consisting of a straw-bedded cattle house and concrete aprons, together with all ancillary site development works

Killynure , Redhills , Co. Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?