construction of a new single storey passive house, new entrance, access roadway, septic tank waste water treatment system, percolation area and associated groundworks and landscaping. A new access roadway will be constructed lined by mixed species native Irish hedging and native irish trees. the roadway will have an entrance from the L2255-1. The development will make use of sustainable building materials throughout and solar panels with battery storage for its main power source

View the full application file on the council's planning portal →

Application Details

Location
Coolderry Farm , Norwood , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.72 ha

Timeline

Registration Date
18 May 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

23m
2660360N/A26 Apr 2026

a new single storey passive house, entrance and associated groundworks, garden and landscaping, a new access roadway will be constructed lined by mixed species native Irish hedging and native Irish trees. the roadway will have an entrance from the L2255-1. The development will make use of sustainable building materials throughout and solar panels with battery storage for its main power source

Coolderry Farm , Norwood , Nenagh Co. Tipperary

187m
2660587N/A17 Jun 2026

the construction of a new single storey passive house, new entrance, access roadway, septic tank waste water treatment system, percolation area and associated groundworks and landscaping

Coolderry , Norwood , Nenagh

620m
2560145N/A26 Feb 2025

refurbishment and extension of an existing single storey vacant property (42m2). The extension will include a new bedroom, bathroom, kitchen and utility room, (149.48m2), tie into existing waste water treatment and water supply from existing site borehole

Coolderry Farm , Nenagh , Co. Tipperary

645m
2560220CONDITIONAL19 Mar 2025

renovation and extension of existing vacant property, new driveway and associated ancilliary works

Coolderry Farm , Coolderry , Norwood Nenagh

991m
18601148CONDITIONAL21 Sept 2018

to demolish existing dwelling house and out buildings on site and construct a new dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Coolderry , Toomevara , Nenagh

991m
19601215CONDITIONAL31 Oct 2019

to renovate and extend existing cottage on site and construct a new garage, waste water treatment system and entrance along with all ancillary site works in place of the development granted permission under 18601148

Coolderry , Toomevara , Nenagh

994m
211289CONDITIONAL27 Aug 2021

construction of a new single storey dwelling, domestic garage, waste water treatment system, entrance and all ancillary site works

Coolderry , Toomevara , Co. Tipperary

1.1km
2660534N/A29 May 2026

RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of 160m, a hub height of 92m, a rotor diameter of 136m and all associated foundations. - A permanent meteorological mast with an overall height of 92m - Turbine and meteorological mast temporary and permanent hard-standing areas including crane hardstand areas; - Upgrade of an existing farm entrance and access track off the R498 regional road to the south of the site in the townland of Grenanstown, to serve as construction and operation access; - Upgrade and widening of existing internal tracks and provision of new permanent and temporary site access tracks and all associated site drainage; - 1 no. borrow pit and associated drainage infrastructure to be used as a source of stone material during construction; and as a permanent material storage area. - Construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing - A permanent 38kV on-site substation to include control building with electrical infrastructure, welfare facilities, car parking, security fencing and lighting, and all associated infrastructure, services, and site works. - All associated underground electrical and communications cabling connecting the turbines to the proposed on-site 38kV substation. - Underground grid connection between the onsite 38 kV substation and the existing Nenagh 110 kV substation comprising approximately 0.75km within the windfarm, 6.2km along the R498, and 1.1km along the L5136. - Biodiversity enhancement areas - All associated site works above and below ground, including site clearance, site drainage, security gates, fencing, permanent and temporary signage, landscaping and revegetation

Townlands of Coolderry Grenanstown Ballinamona Knockbrack Kilconane Kilkeary Ballygasheen Knockalton Upper Lisbunny Tyone and Lissatunney , Nenagh , Co. Tipperary

1.2km
2360972N/A6 Dec 2023

dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works

Shanbally , Norwood , Nenagh

1.2km
2360989CONDITIONAL14 Dec 2023

the construction of a dwelling house, garage and carport, waste water treatment system, entrance, driveway along with all ancillary site works

Shanbally , Norwood , Nenagh Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?