2660465

N/A

Limerick - Limerick County Council

Proposed Development

the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Apr 2026

  2. Further information requested

    16 Jun 2026

  3. Further information received

    13 Aug 2026

  4. Decision due (upcoming)

    9 Sept 2026

Application Details

Location
Martinstown , Kilmallock , Co. Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
0.4 ha

Timeline

Registration Date
23 April 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
9 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
22491CONDITIONAL3 May 2022

a dormer style dwelling to include a vehicular entrance, installation of wastewater treatment, connection to public water supply and all associated site works

Martinstown , Kilmallock , Co. Limerick

47m
2221CONDITIONAL12 Jan 2022

construction of a dwelling house and associated site works, including entrance and wastewater treatment system

Martinstown , Kilmallock , Co. Limerick

53m
211208CONDITIONAL27 Aug 2021

dormer style dwelling to include a vehicular entrance, installation of wastewater treatment, connection to public water supply and associated development works

Martinstown , Kilmallock , Co. Limerick

62m
18671N/A2 Jul 2018

a dwelling house, domestic garage, new entrance, domestic wastewater treatment system and associated site works

Martinstown , Kilmallock , Co. Limerick.

91m
1930CONDITIONAL17 Jan 2019

a dwelling house, domestic garage, new entrance, domestic wastewater treatment system and associated site works

Martinstown , Kilmallock , Co. Limerick.

119m
17155CONDITIONAL21 Feb 2017

permission to construct an extension consisting of a single classroom with en-suite toilets, accessible wc, extended main entrance; to the side and rear of existing school, decommissioning of existing percolation area, upgrading and relocation of existing wastewater treatment system (permitted previously under planning ref: 11212), new sand polishing filter and all associated site works all within revised site boundaries

Martinstown National School , Martinstown Kilmallock , Co Limerick

506m
19951CONDITIONAL26 Sept 2019

a hay & machinery storage shed and Retention Permission for an existing agricultural machinery shed

Martinstown , Kilmallock , Co. Limerick.

760m
2560649CONDITIONAL3 Jul 2025

a ground-mounted solar photovoltaic (PV) energy system and associated site works. The proposed development will comprise a 231.84 kWp solar PV array on approximately 1,125.74 m² of land within the existing agricultural holding. The development will consist of 336 photovoltaic panels, each with a capacity of 690 Wp, mounted on galvanised steel support structures in a fixed, south-facing, portrait layout. The proposal includes all associated underground electrical cabling and connections to the existing residential electricity supply, as well as the use of temporary access routes and a temporary construction compound/set-down area

Martinstown Stud , Martinstown Kilmallock , Co. Limerick

897m
23506N/A20 Oct 2023

the renovation and extension of an existing dwelling house, construction of a new entrance and all associated site works

Bosnetstown , Martinstown , Kilmallock

898m
2560591CONDITIONAL19 Jun 2025

renovation and extension of the existing detached dwelling. The works include removal of front door projection, demolition of existing outbuilding and walls, construction of a single storey extension to the side and rear, provision of a new waste water treatment system, a new entrance and all associated site works

Bosnetstown , Martinstown Kilmallock , Co. Limerick

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.