2660618
N/AKerry - Kerry County Council
Proposed Development
the demolition of existing entrance porch and flat roof extension and to construct a single storey extension to the north and west of existing dwelling house and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Jul 2026
Decision due
27 Aug 2026
Application Details
- Location
- No.7 Doon Bay Chalets , Doon Bay Road , Ballybunnion
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.018 ha
Timeline
- Registration Date
- 3 July 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 27 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
SINGLE STOREY EXTENSION AND ALTERATIONS TO EXISTING PORCH TO FRONT, SINGLE STOREY EXTENSION TO REAR, FORMING NEW OPE AND ALTERATION TO EXISTING WINDOW OPE BOTH TO (NORTH) ELEVATION, BLOCKING UP OPE TO SIDE (SOUTH) ELEVATION AND ALL ANCILLARY SITE WORKS
6 DOON BAY CHALETS , DOON BAY ROAD , DOON WEST
RETAIN EXISTING DWELLING AS BUILT AND ALL ASSOCIATED SITE WORKS
CASTLE VIEW DOON BAY CHALETS , DOON BAY ROAD , DOON WEST
INVALID APPLICATION
Castlecview , Doon bay Road , Ballybunion
RETAIN FOR ENTRANCE AND ACCESS ROAD TO SERVE THEIR DWELLING HOUSES AND ASSOCIATED SITE WORKS
DOONBAY ROAD , DOON WEST , BALLYBUNION
RETAIN ENTRANCE AND ACCESS ROAD TO SERVE THEIR DWELLING HOUSES AND ASSOCIATED STIE WORKS
DOONBAY ROAD , DOON WEST , BALLYBUNION
TO CONVERT ADMINISTRATIVE OFFICE/TOILET BLOCK INTO A TWO BEDROOM DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
DOON BAY ROAD , BALLYBUNION , CO KERRY
(a) demolition of chimney stack, (b) changing roof profile of single storey roof to front (east) and side (south) from pitched to flat, (c) elevational changes to opes to all elevations at ground floor level comprising (i) forming new door to front (east), (ii) blocking up door to front (east), (iii) changing window to door to side (north), (iv), new window to side (south), (v) changing window and door to side (south) to form new sliding doors, (vi) changing windows to side (south) and rear (west) to form new corner window, (vii) new window to rear (west), (viii) forming new door to rear (west), (d) forming new gable window to rear (west) at first floor level, (e) dormer extension to first floor to side (south) including window to rear (west) and first floor terrace to side (south) and (f) all ancillary site works
Doon Bay Road , Doon West , Ballybunion Co. Kerry
FOR A CHANGE OF USE FROM AN EXISTING ADMINISTRATION OFFICE / TOILET BLOCK INTO A TWO BEDROOM SHORT TERM RENTAL HOLIDAY HOME AND ALL ASSOCIATED SITE WORKS
DOON BAY ROAD , BALLYBUNION , CO KERRY
(A) CONSTRUCT A DETACHED SINGLE STOREY DWELLING HOUSE, (B) CONNECTION TO PUBLIC FOUL AND STORM WATER SEWERS, (C) NEW VEHICULAR ENTRANCE TO FRONT AND (D) ALL ANCILLARY SITE WORKS
DOON BAY ROAD , BALLYBUNION , CO KERRY
(A) CONSTRUCTION OF DETACHED SINGLE STOREY DWELLING HOUSE, (B) PUMPED CONNECTION TO PUBLIC FOUL SEWER, (C) NEW VECHICULAR ENTRANCE TO FRONT, AND (D)ALL ANCILLARY SITE WORKS AT SITE
DOON BAY ROAD , BALLYBUNION , TRALEE
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?