2660622
CONDITIONALDonegal - Donegal County Council
Proposed Development
ERECTION OF (1) EXTENSION TO THE FRONT AND REAR OF EXISTING DWELLING AND (2) DOMESTIC GARAGE, CONNECTION TO EXISTING SERVICES AND ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
13 Apr 2026
Decision: CONDITIONAL
28 May 2026
Decision due
7 Jun 2026
Grant issued
1 Jul 2026
Application Details
- Location
- BALLEEGHAN UPPER , MALIN , LIFFORD PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.339 ha
Timeline
- Registration Date
- 13 April 2026
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 May 2026
- Grant Date
- 1 July 2026
- Permission Expires
- 30 June 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RENOVATION AND ERECTION OF AN EXTENSION OF EXISTING SINGLE STOREY DWELLING TO INCORPORATE INCREASED FOOTPRINT, NEW ROOF WITH UTILISED ROOFSPACE AND CONNECTION TO EXISTING SEPTIC TANK, ERECTION OF NEW DOMESTIC GARAGE, ACCESS VIA EXISTING ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , CO DONEGAL
RENOVATIONS AND ERECTION OF (1) AN EXTENSION TO SINGLE STOREY DWELLING TO INCORPORATE INCREASED FOOTPRINT, NEW ROOF WITH UTILISED ROOFSPACE AND CONNECTION TO EXISTING SEPTIC TANK (2) DOMESTIC GARAGE AND ACCESS VIA EXISTING ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , LIFFORD PO
RENOVATE AND ERECTION OF AN EXTENSION TO EXISTING SINGLE STOREY DWELLING TO INCORPORATE INCREASED FOOTPRINT, NEW ROOF WITH UTILISED ROOFSPACE AND CONNECTION TO EXISTING SEPTIC TANK, NEW DOMESTIC GARAGE, ACCESS VIA EXISTING ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , CO. DONEGAL
CONSTRUCTION OF A NEW DWELLING HOUSE AND ADJOINING GARAGE WITH EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , LIFFORD PO
CONSTRUCTION OF DWELLING HOUSE AND ADJOINING GARAGE WITH EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , LIFFORD PO
ERECTION OF A 2 STOREY DWELLING WITH EFFLUENT TREATMENT PLANT, ACCESS VIA EXISTING ACCESS ROAD, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN UPPER , MALIN , LIFFORD P.O.
ERECTION OF A DWELLING WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ON SITE
BALLEEGHAN LOWER , MALIN , LIFFORD PO
ERECTION OF A DWELLING WITH EFFLUENT TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLEEGHAN LOWER , MALIN , LIFFORD PO
(1) PROVISION OF A VEHICLE AND PEDESTRIAN SET DOWN AREA ADJOINING THE L-1081-1 PUBLIC ROAD, TO THE FRONT OF THE EXISTING CENTRE WITH A NEW PEDESTRIAN ACCESS RAMP AND STEPS AND PROVISION OF A NEW FRONT BOUNDARY WALL AND (2) PROVISION OF ADDITIONAL CAR PARKING AREA TO THE REAR OF THE CENTRE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ETB TRAINING CENTRE , BALLEEGHAN UPPER , CULKEENY INISHOWEN
(1) PROVISION OF A VEHICLE AND PEDESTRIAN SET DOWN AREA ADJOINING THE L-1081-1 PUBLIC ROAD, TO THE FRONT OF THE EXISTING CENTRE WITH A NEW PEDESTRIAN ACCESS RAMP AND STEPS AND PROVISION OF A NEW FRONT BOUNDARY WALL AND (2) PROVISION OF ADDITIONAL CAR PARKING AREA TO THE REAR OF THE CENTRE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ETB TRAINING CENTRE , BALLEEGHAN UPPER , CULKEENY INISHOWEN
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?