2660677

N/A

Limerick - Limerick County Council

Proposed Development

the construction of a new dwelling house, detached garage, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Jun 2026

  2. Further information requested

    11 Aug 2026

Application Details

Location
Mundellihy , Dromcollogher , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
0.287 ha
Floor Area
114 sq m
Residential Units
1

Timeline

Registration Date
17 June 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

200m
2660859N/A28 Jul 2026

(a) Agricultural building to include cubicle livestock housing, (b) extension to eastern elevation of cubicle livestock housing as granted under Pl. Ref. 13/507, (c) agricultural building to include straw bedded calf housing, (d) concrete walled silage pit. Planning permission is also sought for geomembrane-lined slurry store along with associated site works

Mundellihy , Dromcolliher , Co. Limerick

374m
2560164CONDITIONAL2 Mar 2025

a change of design to an extension that was previously granted planning permission under file number 22/776

Mundehilly , Dromcolliher , Co. Limerick

374m
22776CONDITIONAL13 Jul 2022

(a) demolition of the existing rear extension and open front porch, (b) construct a new extension to rear, a new front porch and install a new roof window to rear, all to existing dwelling, (c) construct a detached domestic garage/store, (d) decommission existing septic tank and install a new wastewater treatment system

Mundellihy , Dromcolliher , Co. Limerick

1.1km
2660634N/A5 Jun 2026

(1) the demolition of a dwelling house due to defective concrete blocks, a new replacement dwelling house, as constructed to subfloor level, (2) PERMISSION for the completion of replacement dwelling, new domestic wastewater treatment system & associated site works

Cloonmore , Dromcollogher , Co. Limerick

1.1km
2560161CONDITIONAL28 Feb 2025

the construction of a dwelling house extension comprising of a loft conversion, raised ridge height, elevation changes & front annex, new domestic wastewater treatment system & associated site works

Cloonmore , Dromcollogher , Co Limerick

1.2km
2061CONDITIONAL29 Jan 2020

the conversion of existing farm sheds into slatted shed, straw bedded area, feeding passages, cattle handling unit and concrete apron

Callahow , Dromcollogher , Co. Limerick

1.3km
21791CONDITIONAL8 Jun 2021

construction of an extension to the existing dwelling house and modifications to the existing dwelling house, together with all associated site works

Mondelihy , Dromcollogher , Co. Limerick

1.4km
17204CONDITIONAL7 Mar 2017

construct an extension to front elevation of existing dwelling house, carry out alterations to existing floor layout to incorporate proposed extension and carry out all associated site works

Callahow , Dromcollogher , Co Limerick

1.4km
17606CONDITIONAL27 Jun 2017

the demolition of existing rear extension to existing cottage, alterations to existing cottage, demolish existing chimney and replace with new chimney, permission to construct a new storey and a half type extension including single storey link corridor to rear of existing cottage, waste water treatment unit, polishing filter and all ancillary site works

Mondellihy , Dromcollogher , Co Limerick

1.6km
211112CONDITIONAL4 Aug 2021

a slatted unit and a storage shed

Coolaboy , Dromcolliher , Co. Limerick

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.