The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2660788

N/A

Galway - Galway County Council

Proposed Development

for a single storey sports facility to include dressing rooms, referees’ room, showers, toilets, store, multi-purpose / meeting room, proprietary treatment plant and polishing filter and all associated site development and external works. The application is accompanied by a Natura Impact Statement

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 May 2026

  2. Further information requested

    7 Jul 2026

  3. Further information received

    14 Aug 2026

  4. Decision due (upcoming)

    8 Oct 2026

Application Details

Location
Middlequarter Fawnmore , Inishbofin , Co Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
1.3 ha

Timeline

Registration Date
20 May 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
8 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22152REFUSED10 Feb 2022

for a single storey sports facility to include dressing rooms, referees room, showers, toilets, store, multi-purpose/meeting room, proprietary treatment plant and polishing filter and all associated site development and external works. Gross floor space of proposed works: 166sqm

Middlequarter ,

115m
17963CONDITIONAL29 Jun 2017

to demolish and reconstruct the existing dwelling house. Gross floor space of proposed works: Proposed 156sqm., demolition 106sqm

Middlequarter ,

227m
19117CONDITIONAL30 Jan 2019

to demolish existing outbuildings and to construct a dwellinghouse and effluent treatment system. A Natura Impact Statement will be lodged with this application. Gross floor space of proposed works: 78 sqm

Fawnmore ,

237m
201856CONDITIONAL7 Dec 2020

to construct a museum building with display area, photographic exhibition room, restoration workshop, archive storage and gift shop with coffee dock. The proposed development will also include a wastewater treatment system and new road entrance. This application contains an NIS. Gross floor space of proposed works: 312 sqm

Middlequarter Inishbofin ,

237m
25173REFUSED15 Jul 2025

on pl. ref. no. 201856 to construct a museum building with display area, photographic exhibition room, restoration workshop, archive storage and gift shop with coffee dock. The proposed development will also include a wastewater treatment system and new road entrance. This application contains an NIS. Gross floor space of proposed works: 312 sqm

Middlequarter , Inishbofin , Co Galway

237m
25354UNCONDITIONAL19 Dec 2025

of pl ref 201856 to construct a museum building with display area, photographic exhibition room, restoration workshop, archive storage and gift shop with coffee dock. The proposed development will also include a wastewater treatment system and new road entrance. This application contains an NIS

Middlequarter , Inishbofin

285m
201140CONDITIONAL13 Aug 2020

to construct a new extension to the side of my existing dwelling along with a new entrance and replacement of existing septic tank with new wastewater treatment system. The application will include a Natura Impact Statement. Gross floor space of proposed works: 143 sqm

Middlequarter ,

285m
25174UNCONDITIONAL15 Jul 2025

on pl. ref. 20/1140 to construct a new extension to the side of my existing dwelling along with a new entrance and replacement of existing septic tank with new wastewater treatment system. The application will include a Natura Impact Statement. Gross floor space of proposed works: 143 sqm

Middlequarter , Inishbofin , Co. Galway

325m
181814UNCONDITIONAL17 Dec 2018

for renovation of existing house to include demolition of rear extension and replacement with new single storey kitchen/bathroom extension. New two storey educational/cultural building to the west of the existing house with manager's accommodation at first floor and finished in timber cladding, render and stone with a metal clad roof. Associated small scale accommodation building to the north of the existing house containing two en-suite bedrooms finished in render and timber cladding with a slate roof with solar thermal panels. Wastewater is to be treated on site through constructed wetlands and settlement tank. New pedestrian access is proposed to the west of the existing access with bicycle parking and notice board. A phased build programme is proposed with the erection of the two-storey educational/cultural building as phase one. (Gorss floor area proposed 263sqm). Previous Planning Reference No. 14/665

Middlequarter ,

326m
191068REFUSED12 Jul 2019

consisting of fitting out of the roof space with the installation of windows and roof lights to the existing dwelling together with modifications to the existing effluent treatment system and associated site works. Gross floor space of proposed works: 91 sqm. Gross floor space of work to be retained: 252 sqm

Fawnmore ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?