2660870

N/A

Galway - Galway County Council

Proposed Development

for the erection of an 18m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete plinth, palisade fence with access gate, concrete plinth, fibre chamber, stone compound ground finish, replacement of existing gate with farm gate and hanging post and all ancillary development works thereto. The development is required to carry the broadband data from the new high speed fibre broadband network on the Island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the Islands, at the same data speed. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 May 2026

  2. Further information requested

    17 Jul 2026

  3. Further information received

    4 Aug 2026

  4. Decision due (upcoming)

    28 Sept 2026

Application Details

Location
Middlequarter , Lands at Galway County Council Sheep Dipping Lands , Inishbofin Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.009 ha

Timeline

Registration Date
29 May 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
28 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

433m
2461508REFUSED8 Nov 2024

for the installation of a 18-metre high lattice structure supporting 1 no. radio-link dish, a ground-level dual bay cabinet, palisade fence and gate, fibre chamber, concrete plinth and white stone compound ground finish. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A natura Impact Statement (NIS) has been prepared and submitted in support of this application

Middlequarter , Inishbofin Island , Co. Galway

474m
181470N/A17 Oct 2018

to demolish existing agricultural sheds and to construct an agricultural barn which will be used for the purpose of fodder storage and the storage of agriculture related material. Gross floor space of proposed works: 246.5 sqm. Gross floor space of any demolition: 48.5 sqm. (agricultural)

Middle quarter Inishbofin ,

474m
18421REFUSED9 Apr 2018

to construct an agricultural barn. Gross floor space of proposed works 246.5 sqm.

Middlequarter ,

474m
20221CONDITIONAL21 Feb 2020

to demolish existing agricultural sheds and to construct an agricultural barn which will be used for the purpose of fodder storage and the storage of agriculture related materials. A Natura Impact Statement will be lodged with this application. Gross floor space of proposed works: 228.50 sqm. Gross floor space of any demolition: 48.50 sqm (Agricultural)

Middlequarter ,

678m
2261155REFUSED17 Nov 2022

for the construction of new ferry staff accommodation, office and equipment storage along with a wastewater treatment system. Gross floor space of proposed works 134.00 sqm

Cloonamore , Inishbofin , Co. Galway

679m
17963CONDITIONAL29 Jun 2017

to demolish and reconstruct the existing dwelling house. Gross floor space of proposed works: Proposed 156sqm., demolition 106sqm

Middlequarter ,

684m
2460409CONDITIONAL16 Apr 2024

for: 1. Renovations and extension to existing cottage, 2. New onsite sewage treatment plant, percolation area and all associated works, 3. A Natura Impact Statement (NIS) has also been included with the application. Gross floor space of proposed works: 40 sqm

Middle Quarter , Inisboffin , Co. Galway

688m
23478CONDITIONAL11 Dec 2023

for change of use from store/garage on the ground floor to community shop

Middlequarter , Inishbofin , Co. Galway

721m
2560295CONDITIONAL20 Mar 2025

for the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works. This application will be accompanied by a Natura Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144 sqm(H)

MIddlequarter , Inishbofin , Co. Galway

721m
2461391REFUSED21 Oct 2024

for the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works.This application will be accompanied by a Natural Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144.00 sqm

Middlequarter , Inishbofin , Co. Galway

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.