2660905
N/ADonegal - Donegal County Council
Proposed Development
(1) ERECTION OF THREE 4.5 MEGAWATTS (MW) WIND TURBINES WITH A BLADE TIP HEIGHT OF 150M CONSISTING OF A ROTOR DIAMETER OF 136M AND A HUB HEIGHT OF 82M, (2) ERECTION OF ONE 4.2 MEGAWATTS (MW) WIND TURBINE WITH A BLADE TIP HEIGHT OF 135M CONSISTING OF A ROTOR DIAMETER OF 117M AND A HUB HEIGHT OF 76.5M, (3) CONSTRUCTION OF TURBINE FOUNDATIONS, CRANE HARDSTAND AREAS AND ASSEMBLY AREAS, (4) CONSTRUCTION OF 1 NO. PERMANENT 38KV ELECTRICAL ONSITE SUBSTATION AND CONTROL BUILDING COMPOUND INCLUDING A SINGLE-STOREY CONTROL BUILDING WITH WELFARE FACILITIES, ALL ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, SECURITY FENCING, GATES, ALL ASSOCIATED UNDERGROUND CABLING, WASTEWATER HOLDING TANK, AND ALL ANCILLARY STRUCTURES AND WORKS IN THE TOWNLAND OF CORKER MORE, (5) PROVISION OF A NEW JUNCTION WITH ACCESS FROM THE N56 IN THE TOWNLAND OF MEENAVALLY, INCLUDING THE REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS TO FACILITATE THE USE OF IT FOR THE DELIVERY OF CONSTRUCTION MATERIALS TO THE SITE, (6) CONSTRUCTION OF 2 SITE ENTRANCES, ONE ON THE LOCAL ACCESS ROAD TO THE WEST OF THE L8063 TO ACCESS THE MAIN WIND FARM SITE AND ONE ON THE L5635 (MEENAGOLAN ROAD) TO ACCESS THE 38KV ONSITE SUBSTATION AND CONTROL BUILDING, (7) CONSTRUCTION OF 1 NO. NEW BRIDGE ON THE ACCESS ROAD FROM THE NEW JUNCTION ON THE N56 AND 1 NO. BRIDGE UPGRADE ON THE LOCAL ROAD L8063 IN THE TOWNLAND OF MEENAVALLY, (8) CONSTRUCTION OF NEW INTERNAL SITE ACCESS TRACKS (BOTH EXCAVATED AND FLOATING) AND UPGRADE OF EXISTING SITE ACCESS TRACKS, (9) DEVELOPMENT OF A SITE DRAINAGE NETWORK, (10) 1 NO. PERMANENT METEOROLOGICAL MAST OF C.85M IN HEIGHT, AND ASSOCIATED FOUNDATION AND HARD-STANDING AREA IN THE TOWNLAND OF MEENAVALLY, (11) CONSTRUCTION OF TWO TEMPORARY CONSTRUCTION COMPOUNDS FOR USE DURING CONSTRUCTION, (12) ALL ASSOCIATED WIND FARM INTERNAL CABLING WHICH CONSISTS OF OVER AND UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES, MET MAST AND THE ONSITE SUBSTATION AND CONTROL BUILDING (13) A NEW 38KV CABLE WILL EXTEND UNDERGROUND FOR APPROXIMATELY 357M FROM THE ONSITE SUBSTATION AND CONTROL BUILDING TO CONNECT TO THE NATIONAL GRID IN THE TOWNLAND OF CORKER MORE VIA EXISTING OVERHEAD LINES THROUGH THE ERECTION OF 2 NO. END MASTS OF 12M HEIGHT, (14) TWO ON-SITE BORROW PITS, (15) AMENITY ACCESS FOR THE WIDER COMMUNITY AND BIODIVERSITY ENHANCEMENT MEASURES, (16) MINOR TREE FELLING TO FACILITATE THE CONSTRUCTION AND OPERATION OF WIND FARM INTERNAL CABLING FROM THE TURBINES TO THE ONSITE SU
View the full application file on the council's planning portal →Application Timeline
Application received
20 May 2026
Decision due (upcoming)
25 Jun 2027
Application Details
- Location
- MULMOSOG MEENTULLYNAGARN MEENAKILLEW , ALTNAGAPPLE CROCKNAGAPPLE & CORKER MORE KILLYBEGS , CO. DONEGAL
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 58.25 ha
Timeline
- Registration Date
- 20 May 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 25 June 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENAVALLY , ARDARA , DONEGAL PO
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENAVALLY , ARDARA , DONEGAL PO
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENAVALLEY , ARDARA , DONEGAL PO.
(1) RENOVATION OF EXISTING DERELICT DWELLING INCLUDING CHANGES TO ELEVATIONS, (2) CONSTRUCTION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING, AND (3) INSTALLATION OF A WASTEWATER SEWAGE TREATMENT SYSTEM AND ALL ANCILLARY SITE DEVELOPMENT WORKS
ALTNAGAPPLE , MULMOSOG , KILLYBEGS
CONSTRUCTION OF A DWELLING HOUSE WITH ASSOCIATED SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ALTNAGAPPLE , KILLYBEGS , DONEGAL PO
EXTENSION TO THE REAR OF EXISTING DWELLING INCLUDING RAISING THE HEIGHT OF THE EAVES OF EXISTING BUILDING AND PERMISSION FOR COMPLETION OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
CNOCNAGCAPALL , ARDARA , CO DONEGAL
(1) RAISING THE HEIGHT OF EAVES OF EXISTING BUILDING AND PERMISSION FOR (2) COMPLETION OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
CNOCNAGCAPALL , ARDARA , CO DONEGAL
CONSTRUCTION OF 1 NO. BELL-MOUTH ENTRANCE WITH ACCESS ROAD TO FACILITATE ACCESS INTO THE EXISTING FORESTRY PLANTATION FOR THE REMOVAL OF TIMBER AND ALL ANCILLARY WORKS
MEENAVALLY , ARDARA , DONEGAL PO
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM, POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENAKILLEW , KILLYBEGS , DONEGAL PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.