The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660

N/A

Kilkenny - Kilkenny County Council

Application Timeline

  1. Application received

    5 Aug 2026

  2. Decision due (upcoming)

    29 Sept 2026

Application Details

Location
Templeorum , Piltown , Co. Kilkenny
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
5 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
29 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20483N/A28 Jul 2020

to construct a single storey dwelling with on site sewerage treatment system, new entrance onto public road and all associated works

Templeorum , Piltown , Co. Kilkenny

0m
21418CONDITIONAL17 May 2021

to construct a single storey dwelling with on site sewerage treatment system, new entrance onto public road and all associated works

Templeorum , Piltown , Co Kilkenny

51m
1725CONDITIONAL24 Jan 2017

to construct a single storey dwelling with on site sewerage treatment system, new entrance onto public road and all associated works

Templeorum , Piltown , Co. Kilkenny

365m
2660439N/A9 Jul 2026

to demolish an existing derelict dwelling house and to construct a new dwelling house in its place, new garage, the installation of a new sewage treatment system and percolation area, including all necessary site works

Ashtown , Piltown , Co. Kilkenny

403m
2460107CONDITIONAL5 Mar 2024

for the erection of a dwelling house and domestic garage/store with treatment system and percolation area and all associated site works

Templeorum , Piltown , Co. Kilkenny

445m
19953CONDITIONAL20 Dec 2019

for a Proposed new bungalow style dwelling with a storey and a half accommodation. Proposed new vehicular entrance, Driveway, Borewell, Packaged wastewater system with soil polishing filter percolation, Storm water soakaways and all associated site works

Oldcourt , Templeorum , Piltown

588m
182CONDITIONAL2 Jan 2018

to construct a single storey dwelling, on site sewerage treatment system and all associated works

Templeorum , Piltown , Co. Kilkenny

610m
226CONDITIONAL7 Jan 2022

to construct a single storey dwelling with on-site sewerage treatment, detached domestic garage, new entrance onto the public road and all associated works

Templeorum , Piltown , Co. Kilkenny

654m
20172N/A16 Mar 2020

to construct six new dormer dwellings comprised of two separate dwelling blocks, each block will consist of two semi-detached and one terraced dwelling, on-site waste water treatment system, new entrance onto public road, on-site parking and all associated works

Oldcourt , Templeorum , Piltown

731m
2660042CONDITIONAL22 Jan 2026

for existing dwelling position which differs from that permitted by permission 03/152. Retention Permission is also sought for a domestic garage, Boundary wall, entrance piers and all associated site development works

Ashtown , Templeorum , Piltown

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?