2661130
N/AGalway - Galway County Council
Proposed Development
for the installation of 6 No. floodlighting columns to existing pitch including all associated site development, landscaping and external works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Jul 2026
Decision due
27 Aug 2026
Application Details
- Location
- Headford , Headford Rd , Co Galway
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 1.257 ha
Timeline
- Registration Date
- 3 July 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 27 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the conversion of an existing football pitch to an all-weather 3G football pitch, including the erection of a 3m high perimeter fence surrounding the pitch and additional 3m high nets on top of the fence behind the goals.
Headford ,
of additional pitch lights, net posts and additional fencing on revised site boundaries. Area of site to which the application relates to 0.890 hectares.
Headford ,
for the construction of a community leisure/gymnasium facility with associated services. Gross floor space of proposed works: 448 sqm
Headford ,
for change of plan for the Community Leisure Facility previously granted under Planning Reference No. 202032
Headford , Headford , Co. Galway
for a change of plan for the Community Event Centre previously granted under planning ref 202032 & planning ref 2460561
Headford , Co. Galway
for extensions & alterations to the existing clubhouse previously granted under Planning Reference No. 065046 and Planning Reference No 1459
Headford , Headford , Co Galway
for the development consisting of the following: 1. Construction of 65 no. residential dwellings consisting of: a. 03 no. 4 bedroom 2 storey detached dwellings; b. 21 no. 4 bedroom 2 storey semi- detached dwellings; c. 01 no. 4 bedroom 3 storey terrace dwelling; d. 19 no. 3 bedroom 2 storey semi- detached dwellings; e. 09 no. 3 bedroom 2 storey terrace dwellings; f. 04 no. 2 bedroom 2 storey semi- detached dwellings; g. 08 no. 2 bedroom 2 storey terrace dwellings. 2. New road works along the R334 Cong Road to provide for; a vehicular and pedestrian entrance to serve the development, provision of gateway signage, road re-alignment, together with a pedestrian crossing point. 3. Provision of public and private open spaces, play spaces, bin stores, bicycle parking, site landscaping, revised boundary treatments, and public lighting; 4. Provision of residential carparking including a proportion of electric charging spaces and ducting to all spaces for future electric charging points; 5. Connection to public sewer and public watermain along Cong Road, together with on-site surface water drainage works; 6. Footpath connections, signage locations and all associated site development works and services. A Natura Impact Statement is submitted to the planning authority with this application. Gross floor space of proposed works: 7,807.40 sqm
Headford , Cong Road Headford , Galway
for 1. construction of 65 no. residential dwellings comprising of: a.1 no. 4 bedroom 2 storey detached dwelling, b.19 no. 4 bed 2 storey semi-detached dwellings, c. 19 no. 3 bedroomed 2 storey semi-detached dwellings, d. 12 no. 3 bedroomed 2 storey terraced dwellings, e.1 no. 4 bedroomed 3 storey terraced dwelling, f.4 no. 1 bedroom apartment units and 9 no. 2 bedroom apartments units, together with an associated communal bike and bin store within a two storey duplex building. 2. Construction of a single storey creche building, together with associated play area, bin store, parking and set down areas. 3. New road works along the R334 Cong Road to provide for; a vehicular and pedestrian entrance to serve the development, provision of gateway signage for the town of Headford, road re-alignment, construction of roadside footpath and public lighting, a pedestrian crossing point with pedestrian traffic signal, traffic calming ramps and associated warning signage. 4. Provision of public and private open spaces, play spaces, bicycle parking, site landscaping, revised boundary treatments, and public lighting within the estate; 5. Provision of residential carparking including a proportion of electric charging spaces and ducting to all spaces for future electric charging points; 6.Connection to public sewer and public watermain along Cong Road, together with on-site surface water drainage works; 7. Footpath connections, signage locations, ESB substation and all associated site development works and services. A Natura Impact Statement will be submitted to the planning authority with this application. Gross floor space of proposed works: 7,446 sqm(houses), 518.00 sqm(commercial)
Headford , Cong Road , Co. Galway
for; (1) refurbishment of an existing single storey vacant cottage. (2) Addition of a new two storey extension to the rear. (3) All associated site development, external works & services
Headford , New Street , Co Galway
for the following: 1. The construction of 28 no. residential units, comprising of 22 no. 3-bed houses and 6 no. 4-bed houses. 2.Extension of internal Cúl na Coirre pedestrian and vehicular access (currently under construction) to service the proposed development. 3.Provision of all associated surface water and foul drainage services, provision of an attenuation tank and sustainable drainage solutions (SuDS), connections and all associated site works and ancillary services. Gross floor space of proposed works: 3183.96 sqm
Headford , Cul na Coirre , Co. Galway
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?