The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2661152

N/A

Galway - Galway County Council

Proposed Development

chun Seomra Ceardaíochta a Choinneáil

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Jul 2026

  2. Decision due (upcoming)

    1 Sept 2026

Application Details

Location
Inis Oírr , An Baile Thiar , Oileáin Árann
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.04 ha

Timeline

Registration Date
8 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
1 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

125m
171542UNCONDITIONAL25 Oct 2017

for minor modifications to existing planning permission (planning reg. ref. no. 11/168) to include the following: (a) relocation of proposed percolation area to adjoining land for proposed new Bison wastewater treatment plant and associated site development works (b) relocation of proposed new soak hole / rain water harvesting system to adjoining land. Previous Planning Reference No. 12/1549.

Inisheer ,

144m
211601CONDITIONAL2 Sept 2021

to demolish existing dwelling house and construct a new house in its place and all ancillary works. A Natural Impact Assessment (N.I.S.) is being submitted with this application. Gross floor space of proposed works: 202.24 sqm. gross floor space of any demolition: 126.9 sqm

Baile Thair Inis Oirr ,

156m
2360910CONDITIONAL4 Aug 2023

for the construction of a domestic garage with all ancillary works to service dwellinghouse granted under pl. ref. 21/1601

Baile Thair Inis Oirr , Co. Galway

158m
181277REFUSED7 Sept 2018

chun Teach Cónaithe a leagan, agus Teach Cónaithe nua le garáiste a thógáil in áit, agus ag iarradh Cead Pleanála chun Athrú Usáide a dhéanamh ar chuid de fhoirgneamh an Bhrú go usáid mar Caife agus Cead Pleanála chun síneadh a thógáíl air, agus Córas Séarachais nua. Spás urláir comhlán na n-oibreacha beartaithe, 385sqm agus Spás urláir comhlán d'aon scartáil, 180sqm.

Baile Thiar Inis Oirr ,

158m
19266REFUSED27 Feb 2019

chun teach cónaithe a leagan, agus teach cónaithe nua le garáiste a thógáil ina áit, agus ag iarradh cead pleanála chun athrú usáide a dhéanamh ar chuid de fhoirgneamh an bhrú go usáid mar caife agus cead pleanála chun síneadh athógáil air, agus córas séarachais nua a thógáil. Ta iarraid cead pleanála chomh maith, chun teach mhuintire a cheangal leis an gcóras séarachais seo. Spás urláir comhlán na n-oibreacha beartaithe: Teach - 260 sqm, Garaiste - 46 sqm, Caife - 140 sqm

Baile Thiar Inis Oirr ,

160m
201858CONDITIONAL7 Dec 2020

for (1) change of use of hostel to a guest house including internal alterations (2) Side extension to café, (3) New Pedestrian entrance (4) New on-site sewage treatment system, polishing filter (5) and all associated site works, original planning ref no. 58670. A Natura Impact Assessment (NIS) is been submitted with this application. Gross floor space of proposed works: 42.6 sqm

Baile Thair Inis Oirr ,

160m
2643UNCONDITIONAL3 Mar 2026

for (1) change of use of hostel to a guest house including internal alterations (2) Side extension to café, (3) New Pedestrian entrance (4) New on-site sewage treatment system, polishing filter (5) and all associated site works, original planning ref no. 58670 (A Natura Impact Assessment (NIS) was submitted with the application)

Baile Thair Inis Oirr ,

176m
2560450N/A22 Apr 2025

to decommission old outdated sewage system and install new sewage treatment plant and tertiary polishing filter and all associated works

Inis Oírr , Inis Oírr , Aran Islands

193m
18869CONDITIONAL26 Jun 2018

for modifications to an existing planning permission granted under PL. Ref. No. 11/168 and extended under PL. Ref. 15/116. As per the previously granted proposal, the proposed works will increase the total number of bedrooms from 14 to 16. The proposed works to the existing hotel will include the following: (a) minor modifications to the internal layout at ground floor level and 6.7 sqm. of proposed new ground floor area to allow for corridor access to a relocated toilet block (b) the demolition of part of an existing ground floor store to accommodate a new external stairs to serve the first floor. The proposed area for demolition is 9 sqm. (c) the provision of new windows to the existing south-east (side) and north-east (front) elevation (d) minor modifications to the internal layout at first floor level and 270.3 sqm. of proposed new first floor area (e) the provision of new roof windows to the existing roofs and walls of the north-west (side) elevation (f) all associated site development works. Gross floor space of proposed works 277 sqm. demolition 9sqm

Inis Oírr ,

206m
2560939CONDITIONAL11 Jul 2025

chun teach cónaithe nua, garáiste agus córas séarachais a thogaíl. Spás urláir comhlán na n-oibreacha beartaithe: 110 sqm(H), 45.00 sqm(G)

Inis Oirr , An Baile Thiar Oileáin Árann , Co. na Gaillimhe

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?