2661327

N/A

Galway - Galway County Council

Proposed Development

for the construction of 16 no. dwelling houses comprising of the following; 10 no. 3 Bed Semi-Detached 2 storey houses, 4 no. 3 Bed Terraced 2 storey houses, 1 no. 4 Bed Detached 2 and a half storey house, and 1 no. 2 Bed Bungalow; Provision of vehicular access into the site via the existing housing estate at Eallagh to the west with reservation for possible future vehicular access onto the N84 to the east; Provision of new pedestrian connectivity on to the N84, with provision of a new footpath to connect with the existing footpath further to the north towards the town centre, together with the provision of dropped kerbs at existing vehicular entrances along the N84; Provision of ducting to facilitate public lighting along the proposed footpath at the edge of the N84; Provision of car parking to include EV parking and ducting to all spaces for future EV charging points; Provision of a centrally located communal open space area, private open space areas, landscaping, footpaths, raised crossing point, bicycle stands, public lighting, groundworks and revised boundary treatments; Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jul 2026

  2. Decision due (upcoming)

    23 Sept 2026

Application Details

Location
Headford , Eallagh , Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.72 ha
Floor Area
1828.6 sq m
Residential Units
1

Timeline

Registration Date
30 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
23 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
2261135REFUSED10 Nov 2022

for the A.The construction of 16 no. houses. These houses to consist of: 8 no. 3 bedroom semi-detached two storey units, 6 no. 3-bedroom mid-terrace two storey units, 1 no. 2 bedroom single storey bungalow and 1 no. 4 bedroom detached two storey unit. B. The provision of a vehicular access point off Galway Road (N84), C. Central communal open space area, D. Internal road, raised pedestrian crossing and pedestrian connectivity via the existing Eallagh estate, E. Public realm landscaping & new boundary treatments, F. Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services.Gross floor space of proposed works 1894 sqm.

Eallagh , Headford , Co. Galway

45m
211620CONDITIONAL6 Sept 2021

for the construction of new dwelling with garage along with new service connections and all associated site works. Gross floor space of proposed works: 340 sqm

Headford ,

80m
2460305N/A21 Mar 2024

for the existing dwelling house with basement, domestic garage, and all associated services, all on revised site boundaries from that previously granted under planning reference no. 18/980

Headford , Co. Galway , Co. Galway

80m
2460786CONDITIONAL27 Jun 2024

of the existing dwelling house with basement, domestic garage and all associated services, all on revised site boundaries from that previously granted under planning reference No. 18/980. Gross floor space of work to be retained: 350 sqm (house) & 60 sqm (garage)

Headford , Co. Galway , H91 AH9F

99m
2361498CONDITIONAL14 Dec 2023

of dwelling house, domestic garage and all associated services on revised site boundaries to those granted under previous planning reference no. 47509

Headford , Headford , Co. Galway

128m
191001CONDITIONAL28 Jun 2019

for 21 No. residential units, comprising of 16 No. 3 Bedroom semi-detached dwellings, 04 No. 4 bedroom semi-detached dwellings, 01 No. 4 bedroom detached dwellings, with connection of all units to existing water supply, public sewer, storm water sewer. The provision of temporary construction site access route with site compound and all ancillary site services. Gross floor space of proposed works: 3044 sqm

Headford ,

128m
25125UNCONDITIONAL27 May 2025

for 21 No. residential units, comprising of 16 No. 3 Bedroom semi-detached dwellings, 04 No. 4 bedroom semi-detached dwellings, 01 No. 4 bedroom detached dwellings, with connection of all units to existing water supply, public sewer, storm water sewer. The provision of temporary construction site access route with site compound and all ancillary site services. Gross floor space of proposed works: 3044 sqm

Headford ,

128m
2660867CONDITIONAL29 May 2026

for change of house type for 17no. dwellings (Nos. 02-18) from previously permitted 3 storey units to 2 storey units, granted under Pl. Reg. Ref. 19/1001 and extended under Pl. Reg. Ref 25/125. Retention of works to date - these dwellings to be completed in accordance with the revised house design and all associated site and development works

Headford , Siúlóid Fhursa , Co. Galway.

138m
19999CONDITIONAL28 Jun 2019

of second floor and elevation alterations to 2 No houses on site numbers 77 and 82 Eallagh, for development approved under Planning Reference No. 06/2696. Gross floor space of work to be retained: 56.4 sqm

Headford ,

141m
19548REFUSED11 Apr 2019

for the construction of a serviced dwelling and associated services. Gross floor space of proposed works: 122 sqm

Headford ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.