2689
N/AKerry - Kerry County Council
Proposed Development
to construct a two storey extension to the side of the existing dwellinghouse and the installation of a new wastewater treatment system to replace the existing septic tank system and associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
28 May 2026
Further information requested
21 Jul 2026
Further information received
29 Jul 2026
Decision due
25 Aug 2026
Application Details
- Location
- Dooneen , Castleisland , Co.Kerry
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.23 ha
Timeline
- Registration Date
- 28 May 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 25 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construct a single storey extension to the side of existing dwelling house and associated site development works
Dooneen , Castleisland , Co.Kerry
(1) DEMOLISH AN EXISTING LOW LEVEL FARM SHED AND COLLECTION YARD WALLS, (2) CONSTRUCT A NEW FARM SHED OVER THE EXISTING COLLECTION YARD AND OVER PART OF THE EXISTING MILKING PARlOUR STRUCTURE, INCLUDING ALLOW FOR ALL ASSOCIATED ANCILLARY CONCRETE AND SITE WORKS
KNOCKAUNTEE , CASTLEISLAND , CO KERRY
RETAIN EXTENSION TO EXISTING DWELLING HOUSE
DOONEEN , CASTLEISLAND , CO KERRY
(A) CHANGE OF USE OF GROUND FLOOR GARAGE AREA AND PART OF THE EXISTING DWELLINGHOUSE INTO GRANNY FLAT, (B) CONSTRUCT A NEW SIDE EXTENSION ONTO THE EXISTING DWELLING HOUSE TO FORM A NEW GRANNY FLAT AND (C) ELEVATION CHANGES AND INTERNAL ALTERATIONS TO EXISTING HOUSE (D) DECOMMISSION EXISTING WAST WATER TREATMENT SYSTEM AND INSTALL A NEW PACKAGED WASTEWATER TREATMENT SYSTEM , POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CRAG , CASTLEISLAND , CO KERRY
RETAIN DWELLING HOUSE AS CONSTRUCTED, DWELLING HOUSE AS CONSTRUCTED, DOMESTIC SHED AND ALL ASSOCIATED SITE WORKS WITHIN REVISED SITE BOUNDARIES
CRAG , CASTLEISLAND , CO KERRY
1. Retention permission to retain: 1(A) the conservatory house extension 1(B) the kitchen house extension 1(C) the domestic garage concrete floor slab 1(D) all associated site works and services 2. Permission to: 2(A) construct a sod and stone splayed site entrance with associate works 2(B) complete the domestic garage structure 2(C) install a pump chamber followed by a Tricell Tero Module polishing filter at Crag, Castleisland, Co. Kerry
Crag , Castleisland , Co. Kerry
RETAIN EXISTING BUNGALOW DWELLING HOUSE AND ADJACENT GARAGE
AHANEBOY , CASTLEISLAND , CO KERRY
TO ALTER AND EXTEND EXISTING WAREHOUSING FACILITY WITH ANCILLARY SITE DEVELOPMENT WORKS
AHANEBOY , CASTLEISLAND , CO KERRY
(1) ALTER AND EXTEND EXISTING AMBIENT STORAGE FACILITY AND (2) RETAIN EXISTING REPACKAGING EXTENSION AND AMBIENT/COLD STORAGE EXTENSION WITH ELEVATIONAL CHANGES TO PREVIOUS PLANNING REG 08/2366 ALL WITH ANCILLARY SITE WORKS FACILITY ALL WITH ANCILLARY SITE DEVELOPMENT WORKS
AHANEBOY , CASTLEISLAND , CO KERRY
CONSTRUCT A SINGLE STOREY DWELLING WITH ATTIC CONVERSION WITH DETACHED DOMESTIC GARAGE AND WASTEWATER TREATMENT UNIT AND POLISHING FILTER WITH ALL ASSOCIATED SITE WORKS
CRINNY WEST , CASTLEISLAND , CO KERRY
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?