4014/24
APPLICATION DECLARED INVADublin - Dublin City Council
Proposed Development
The development will consist of the installation of a modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area.
Application Timeline
Application received
12 Jul 2024
Decision: APPLICATION DECLARED INVA
16 Jul 2024
Decision due
5 Sept 2024
Application Details
- Location
- Supervalu Shopping Centre, Walkinstown Road, Dublin 12, D12 XDK2
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 129 ha
Timeline
- Registration Date
- 12 July 2024
- Status
- Decision Notice Issued
- Decision
- APPLICATION DECLARED INVA
- Decision Date
- 16 July 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Planning permission for attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
44 Thomas Moore Road, Walkinstown, Dublin 12, D12E8W5
Attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
44 Thomas Moore Road, Walkinstown, Dublin 12, D12E8W5
single-storey extension to front, demolition of existing extension to rear & Chimney and single and double storey extension to rear of existing property and all associated site works
4, Hardebeck Avenue, Walkinstown, Dublin 12, D12 EOY2
Retention of existing rooflights to front and side elevations and existing attic conversion at 47, Walkinstown Rd, Walkinstown, Dublin 12
47, Walkinstown Road, Walkinstown, Dublin 12, D12
Retention of existing rooflights to front and side elevations and existing attic conversion at 47, Walkinstown Rd, Walkinstown, Dublin 12
47, Walkinstown Road, Walkinstown, Dublin 12
Retention of existing rooflights to front and side elevations and existing attic conversion at 47, Walkinstown Rd, Walkinstown, Dublin 12
47, Walkinstown Road, Dublin 12
The construction of a single storey extension to the front of the building, consisting of a front porch and an extension to the front living room
6, Hardebeck Avenue, Walkinstown, Dublin 12
The development will consist of the installation of approx. 1020 sq.m of photo-voltaic solar panels onto the existing supermarket roof. The solar panels will be used to create green electricity, all of which will be used by the store.
Supervalu Walkinstown, Walkinstown Avenue, Dublin 12
The development will consist of the installation of a modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area.
Supervalu Shopping Centre, Walkinstown Road, Dublin 12, D12XDK2
The development will consist of:- 1) Demolition of existing warehouse building and all other structures on site; 2) The construction of 8 no. residential houses in 2 no. blocks; 3) The proposed blocks consist of the following: a. 2 no. 2-storey, 2-bedroom semi-detached houses; b. 6 no. 2-storey plus attic level, 4-bedroom terraced houses; 4) Associated access road widening car parking spaces; & 5) Bicycle parking, refuse stores, landscaping, boundary treatments and all associated site development works and services.
5 Walkinstown Road, D12 HD78 comprising of an industrial building, yards and grounds to the rear of houses on Walkinstown Road and Thomas Moore Road, Dublin 12.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?