The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

AA171289

CONDITIONAL

Meath - Meath County Council

Proposed Development

the development consists of the retention of 2 no. groundwater abstraction wells; a building of 40 sqm GFA, containing a water treatment system and pumping plant; 3 no. vented storage tanks and all associated and ancillary infrastructure and site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Nov 2017

  2. Decision: CONDITIONAL

    20 Dec 2017

  3. Decision due

    9 Jan 2018

  4. Grant issued

    8 Feb 2018

Application Details

Location
Tayto Park Visitor Centre , Kilbrew , Ashbourne Co. Meath
Applicant
N/A
Application Type
RETENTION
Planning Authority
Meath County Council
Site Area
0.021 ha

Timeline

Registration Date
6 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 December 2017
Grant Date
8 February 2018
Permission Expires
7 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
21674CONDITIONAL9 Apr 2021

the construction of a new junior rollercoaster attraction with a ride length of approximately 254m and a maximum height of 11.6m above ground level. Associated and ancillary buildings include a rollercoaster station structure (93 sqm Gross Floor Area (GFA), a toilet block (80 sqm GFA), a photo shop (10 sqm GFA) and a plant room (20 sqm GFA). The proposed development also incorporates internal paths connecting to the existing paths within the Park, landscaping, boundary treatments and infrastructure, together with all associated and ancillary development works on a site area of 0.305 ha. Significant further information/revised plans submitted on this application

Tayto Park Visitor Centre , Kilbrew , Ashbourne Co Meath

106m
AA181453CONDITIONAL6 Dec 2018

the construction of a new rollercoaster attraction incorporating 2 separate rollercoaster rides with a combined ride length of approximately 972m and a maximum height of 31 m above ground level; rollercoaster station structures; ancillary buildings including a toilet block (80 sqm Gross Floor Area (GFA), a photo shop (8 sqm GFA), a ground shop (30 sqm GFA), 2 no. concession stands (12.8 sqm GFA each) and an ESB substation (14 sqm GFA); 2 no. pedestrian bridges over the Hurley River; internal paths and roadways connecting to existing Tayto Park infrastructure; drainage infrastruture; landscaping; and, all associated and ancillary plant and development works on a site area of 4.53 ha.This application is accompanied by an Environmental Impact Assessment Report (EIAR)

Tayto Park Visitor Centre , Kilbrew , Ashbourne Co. Meath

396m
24120CONDITIONAL20 Mar 2024

(a) retention of a change of use of part of an existing and storage building (825 sqm) for warehousing and storage use other than solely in connection with the operation of Emerald Park, as required under Condition 2 of the permission granted by An Bord Pleanala under Ref. ABP-301053-18 (MCC Ref. AA171418) and omission of Condition 2 of Ref. ABP-301053-18 to facilitate that change of use and (b) retention of an ancillary single storey external refrigeration unit with a gross floor area of 67 sqm to be used in connection with the operation of Emerald Park. Significant further information/revised plans submitted on this application

Emerald Park , Kilbrew , Ashbourne Co Meath

396m
2481N/A27 Feb 2024

(a) retention of a change of use of part of an existing and storage building (825 sqm) for warehousing and storage use other than solely in connection with the operation of Emerald Park, as required under Condition 2 of the permission granted by An Bord Pleanala under Ref. ABP-301053-18 (MCC Ref. AA171418) and omission of Condition 2 of Ref. ABP-301053-18 to facilitate that change of use and (b) retention of an ancillary single storey external refrigeration unit with a gross floor area of 67 sqm to be used in connection with the operation of Emerald Park

Emerald Park , Kilbrew , Ashbourne Co Meath

401m
211758CONDITIONAL8 Sept 2021

permission for retention is sought for a themed train ride attraction comprising: an at grade train track of 396 m in length; a timber clad tunnel and maintenance structure associated with the train ride attraction, and for the inspection repair and servicing of Tayto Park attraction (Gross Internal Floor Area 161.5 sqm, and 3.85m in height); a railway station façade structure of 4.9 m in height and 23.7 m in length; amendments to existing internal paths and connections within Tayto Park; and all associated landscaping, boundary treatment, development and works, on an overall site of 0.393 ha. The structures are located adjoining the 'Eagle's Nest' area of Tayto Park, and to the south of Kilbrew Graveyard

Kilbrew , Ashbourne , Co. Meath

405m
AA171418CONDITIONAL8 Dec 2017

the development will supersede part of previously granted application AA161769, namely construction of 960sqm Lofting Aviary Structure at this location will not take place. The development will consist of the demolition of existing hay shed & stable, construction of new storage shed incorporating small personnel office and toilets

Ashbourne Visitor Centre , Tayto Park Visitor Centre , Kilbrew Ashbourne Co. Meath

407m
AA170579N/A24 May 2017

the construction of a seven storey over basement Hotel of approximately 31,955 sqm, providing 250 no. bedrooms (approximately 1000 no. bedspaces) at first to fifth floor levels, accessed from the established internal Tayto Park access road. The proposed hotel incorporates a Leisure Centre of 3,382 sqm at ground floor and mezzanine level, a dedicated Function/Conference area of 2,359 sqm at ground floor; a Spa and Therapy Centre of 530 sqm at first and second floor level; 2 no. Sky Lounges of 702 sqm at sixth floor level and all associated and ancillary stores, services and circulation space. The ground floor level provides a main entrance porch, foyer and lounge areas; a main lounge and bar; 3 no. main dining rooms and 2 no. ancillary dining rooms providing 2 no. restaurants for fine dining and general dining; 3 no. kitchens and associated stores; a servery area; a single shop/kiosk unit (23 sqm); plant; an ESB substation and a service corridor to the rear. Ancillary and associated storage and staff facilities including a staff room, toilet facilities, changing facilities and a dedicated kitchen are located at mezzanine level above the kitchens at ground floor level. The basement level provides associated plant and storage space for the Hotel and Leisure Club with vehicular access to the basement via a service ramp from the proposed surface car parking area. The Function/Conference area incorporates 3 no. reception areas and bars and a dedicated entrance. The proposed Leisure Centre consists of a dedicated landscaped entrance; foyer; adult and family changing areas; a junior play and acitivity area; a parents' lounge and viewing area; a family leisure pool including flume slide; a 30m exercise pool; 2 no. wet lounges; a Jacuzzi; Sauna, Steam and Plunge Pool rooms; and a gym incorporating a studio room and cardio vascular room at ground floor level along with a weights area at mezzanine level. Ancillary and associated office suites for the hotel are located adjacent to the weights area at mezzanine level. The proposed development also includes the provision of an attenuation pond of 3,145 sqm surface area; 2 no. vehicular bridges and 1 no. pedestrian bridge over the River Hurley (incorporating the existing bridge); internal roads and junctions with the established internal access road; hardstanding service yard to the rear; vehicular set down areas at the hotel entrance; 40 no. surface car parking spaces associated ..........

Tayto Park Visitor Centre , Kilbrew Ashbourne , Co. Meath

414m
AA170159CONDITIONAL17 Feb 2017

the development will supersede part of previously granted application AA160769, namely construction of 960sqm Lofting Aviary Structure at this location will not take place. The development will consist of the demolition of existing hay shed & stable, construction of a new storage shed incorporating personnel office and toilet used to house light goods and non-perishable materials with external lean-to canopy to one side of shed. The storage shed shall have a gross floor area of 2218 sqm and a max height of 10.7m with external lean to canopy a max height of 6.2m, together with all associated ancillary development and site works

Tayto Park Visitor Centre , Kilbrew Ashbourne , Co. Meath

427m
AA201471N/A12 Oct 2020

permission is sought for the retention of a timber clad tunnel and maintenance structure associated with a train ride attraction, and for the inspection, repair and servicing of Tayto Park attractions. The structure has a gross internal floor area of 161.5 sqm and an overall height of 3.85m

Tayto Park Visitor Centre , Kilbrew , Ashbourne

443m
221541REFUSED28 Nov 2022

erection of a 21m monopole telecommunications support structure together with antennae, dishes and associated telecommunications equipment, all enclosed in security fencing and to extend the access track. Significant further information/revised plans submitted on this application

Tayto Park Visitor Centre , Kilbrew , Ashbourne Co Meath

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?