AA191780

N/A

Meath - Meath County Council

Proposed Development

the demolition of the exising 121sqm potato loading shed & adjoining 64.8sqm 2 storey toilet/office structure and the construction of a new 144sqm waste management area, 92.1sqm plant room and new 138sqm potato loading area (all 8.2m in height) and 5.5m high 89sqm link corridor all attached to the rear of the exisiting manufacturing building and all associated services

View the full application file on the council's planning portal →

Application Details

Location
Kilbrew , Ashbourne , Co. Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
10.03 ha

Timeline

Registration Date
20 December 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
221522CONDITIONAL23 Nov 2022

the development will consist of planning permission for (a) demolition/removal of the existing security hut, (b) modifications to existing surface level carpark and a new surface level carpark (total = 157 spaces), new single storey security hut, modification to the existing site entrance area, new security barriers, associated carpark lighting, electric vehicle charging points and surface mounted weighbridge (c) 2.4m high covered walkway, (d) 2.4m high security fence to the perimter of the site, (e) relocation/redistribution of existing earth mound to the rear within the subject site, (f) modifications to the fenestration of the existing Tayto Museum building at the north west of the factory building (g) change of use of the existing Tayto Museum building to offices at the north west of the factory building, (h) retention of the existing hardstanding and security fencing to the south east of the site and all associated site works at our premises

Tayto Snacks , Kilbrew , Ashbourne Co Meath

35m
AA200183CONDITIONAL7 Feb 2020

the demolition of the exising 121sqm potato loading shed & adjoining 64.8sqm 2 storey toilet/office structure and the construction of a new 144sqm waste management area, 92.1sqm plant room and new 138sqm potato loading area (all 8.2m in height) and 5.5m high 89sqm link corridor all attached to the rear of the exisiting manufacturing building and all associated services

Kilbrew , Ashbourne , Co. Meath

63m
212027CONDITIONAL20 Oct 2021

planning permission for the retention of a) 2no. new extract flues to the roof of existing factory building, b) a storage compound with low level walls, security fence and security barriers all to the rear of the site and c) all associated site works. Significant further information/revised plans submitted on this application

Tayto Snacks Limited Kilbrew , Ashbourne , Co. Meath

138m
2461081CONDITIONAL10 Dec 2024

the demolition of the existing single & two storey offices & high level walkway structure, (2,118 sqm in extent) and the construction of replacement new two storey office buildings with roof top comms/plantroom and external roof mounted plant with louvred screens and roof mounted photovoltaic solar panels (2,734 sqm in extent), the rearranging of the car parking to the front (North) complete with the landscaping of the resultant area, a new substation/transformer room/switchroom (52.5 sqm in extent), to the rear of the existing factory building and all associated site works at our premises at Kilbrew, Ashbourne, Co. Meath. The installation to rear of the site of temporary portacabins (1000 sqm in extent) to house office workers during construction. These buildings will be served by a new wastewater treatment system connected to the existing wastewater system serving the existing offices. These temporary structures will be removed once the new office is constructed and available for occupation. There will be no changes to the existing access, circulation within the overall site or to the industrial buildings and processes on site as a consequence of this application

Tayto Snacks Ltd. , Kilbrew Ashbourne , Co. Meath A84 F854

138m
2660639CONDITIONAL27 May 2026

Application for Planning Permission for the installation of a new sprinkler system water storage tank (850m3) on a new concrete base with a new pump house and all associated site works

Kilbrew , Ashbourne , Co Meath

157m
2460250CONDITIONAL12 Apr 2024

the development will consist of the erection of a single storey extension linking the existing house to an adjacent barn and the change of use of the barn to residential accommodation as part of one dwelling, elevation changes to the house, elevation changes to the barn including raising the eaves level and the addition of a colonnade, new wastewater treatment system and percolation area and all associated site works

Kilbrew , Ashbourne , Co. Meath

217m
221489N/A15 Nov 2022

the development will consist of planning permission for (a) modifications to existing surface level carpark and a new surface level carpark (total = 157 spaces), single storey security hut, modification to the existing site entrance area, new security barriers, associated carpark lighting, electric vehicle charging points and surface mounted weighbridge (b) a 2.4m high security fence to the perimter of the site, (c) relocation/redistribution of existing earth mound to the rear within the subject site, (d) modifications to the fenestration of the existing Tayto Museum building at the north west of the factory building (e) change of use of the existing Tayto Museum building to offices at the north west of the factory building, (f) retention of the existing hardstanding and security fencing to the south east of the site and all associated site works

Tayto Snacks , Kilbrew , Ashbourne Co Meath

242m
212407CONDITIONAL22 Dec 2021

the construction of 2 no. new themed junior attractions consisting of a 'Crazy Bus Ride' with a maximum height of 7m Above Ground Level and a 'Samba Balloon Ride' with a maximum operating height of 5.2m Above Ground Level. 1 no. Operations Room (2.89 sqm Gross Floor Area (GFA) is also provided, associated and ancillary to the 'Samba Balloon Ride'. The proposed development also incorporates amendments to existing internal paths and connections within Tayto Park, boundary treatments and infrastructure, together with all associated and ancillary development works on a combined site area of 0.0287ha

Tayto Park Visitor Centre , Kilbrew , Ashbourne Co Meath

249m
RA190090N/A31 Jan 2019

a 173 sq.m. two-storey extension to front of existing warehouse and All Associated Site Development Works

Kilbrew , Ashbourne , Co. Meath

254m
RA190032N/A17 Jan 2019

a 173 sq.m. two-storey extension to front of existing warehouse and All Associated Site Development Works

Kilbrew , Ashbourne , Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.