AA201525
CONDITIONALMeath - Meath County Council
Proposed Development
retention planning permission for change of use from light industrial to Fitness Gymnasium with internal modifications and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
21 Oct 2020
Decision: CONDITIONAL
8 Dec 2020
Decision due
15 Dec 2020
Grant issued
2 Feb 2021
Application Details
- Location
- Unit 20d Ashbourne Business Centre , Ballybin Road , Ashbourne Co. Meath
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Meath County Council
- Site Area
- 0.002 ha
Timeline
- Registration Date
- 21 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 December 2020
- Grant Date
- 2 February 2021
- Permission Expires
- 1 February 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
retention planning permission for change of use from light industrial to Fitness Gymnasium with internal modifications and associated site works
Unit 20d Ashbourne Business Centre , Ballybin Road , Ashbourne Co. Meath
1) Construction of a 655m2 extension to the southern side of the existing commercial building, (2) Construction of a 560m2 first floor mezzanine within the building and (3) All associated site works
Unit 21 Ashbourne Business Centre , Ballybin Road , Ashbourne Co. Meath
planning permission to erect 430.00 m2 or 111.20 kWp of photovoltaic panels on the roof of our existing commercial building, with all associated site works
Unit 21 Ashbourne Business Centre , Ballybin Road , Ashbourne Co. Meath A84 WV52
changes to previously granted planning permission (ref. AA/170368) to provide for 72. no photovoltaics panels to the south east roof totaling 110sq. There are no other changes proposed to previously approved planning
Colaiste De Lacy Ashbourne Education Campus , Killegland , Ashbourne Co. Meath
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23m2 Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045m2 Proposed site works to include the construction of new 25m2 standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48m2 external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.
Coláiste De Lacy Ashbourne Education Campus , Ballybin , Ashbourne Co. Meath.
EXTENSION OF DURATION ON PLANNING REF AA170368: the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2 storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2 storey west block comprising of 17 general classrooms, 4 specialist classrooms, library, offices, staff room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link cirulation. Total floor area of phase 2 extension C.5045m2 Proposed site works to include the construction of new 115m x 80m grass pitch the removal of 3 no. existing ball courts to be replaced with hard play area, 6 no. basketball courts, 1 bicycle stand, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping
Colaiste De Lacy , Ashbourne Education Campus , Killegland Ashbourne Co. Meath
the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2 storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2 storey west block comprising of 17 general classrooms, 4 specialist classrooms, library, offices, staff room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link cirulation. Total floor area of phase 2 extension C.5045m2 Proposed site works to include the construction of new 115m x 80m grass pitch the removal of 3 no. existing ball courts to be replaced with hard play area, 6 no. basketball courts, 1 bicycle stand, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping
Colaiste De Lacy , Ashbourne Education Campus Killegland , Ashbourne Co. Meath
retention planning permission for 1. Refurbishment of existing storage unit onsite including new roof and cladding to elevation (Ciara. 300m2). 2. Retention of single storey storage unit (Ciara 146m2). 3. Upgraded site access and associated site works
Cookstown Cottage , Ballybin Road , Ashbourne Co. Meath
retention planning permission for refurbishment of existing storage unit onsite including new roof and cladding to elevation (circa. 300m2), retention of single storey storage unit (circa 146m2), upgraded site access and associated site works
Cookstown Cottage , Ballybin Road , Ashbourne Co. Meath
retention planning permission for refurbishment of existing storage unit onsite including new roof and cladding to elevation (Ciara. 300m2). Retention of single storey storage unit (Ciara 146m2). Upgraded site access and associated site works. Significant further information/revised plans submitted on this application
Cookstown Cottage , Ballybin Road , Ashbourne Co. Meath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?