ED22/0003
Declared Not ExemptDublin - South Dublin County Council
Proposed Development
First floor extension of existing office space (c.17.6m.sq.)
View the full application file on the council's planning portal →Application Timeline
Application received
28 Mar 2022
Decision: Declared Not Exempt
22 Apr 2022
Decision due
24 Apr 2022
Application Details
- Location
- Unit F2, South City Business Centre, Killinarden Link Road, Whitestown, Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Declaration of Exemption Sect. 5
- Planning Authority
- South Dublin County Council
- Site Area
- 146.709313628766 ha
Timeline
- Registration Date
- 28 March 2022
- Status
- Decision
- Decision
- Declared Not Exempt
- Decision Date
- 22 April 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1 no additional office space at first floor, the installation of a mezzanine level for storage purposes and associated additional stair and exit door to rear of existing Unit F1.
Unit F1, South City Business Centre, Whitestown Way, Tallaght, Dublin 24.
Erection of a first floor mezzanine area & provision of additional staff facilities and alterations at ground floor level along with additional fenestration at both ground floor and first floor levels to the rear.
Unit F4, South City Business Centre, Killinarden Link Road, Whitestown Way, Tallaght, Dublin 24
Construction of a new 125sq.m (9.0m high) single storey side extension to existing facility for the storage of materials ancillary to the existing business currently operating on site with minor internal modifications and associated site development and ancillary works.
Unit F6, South City Business Park, Tallaght, Dublin 24
Additional use of premises as a 'Refuse Transfer Station' for WEEE and associated batteries. This additional use will also require the holding of a 'Waste facility Permit'.
Unit E10, South Business Park, Tallaght, Dublin 24
The development will consist of three blocks comprising 38 new light industrial/warehouse units with a total gross internal area of 8,600sq.m of which 1,426sq.m will be ancillary office space; 226 car parking spaces, estate roads, landscaping, drainage, E.S.B. sub station and associated site works.
Site At Killinarden Link Road, Whitestown Way, Tallaght, Dublin 24
Amalgamation of previously approved units D3, D4 and D5 into one single unit; internal and external alteration to office area of previously approved Unit E5; Alteration to increase office area of previously approved Unit E20 and external alteration to elevation of previously approved Unit F4.
South City Business Centre, Killinarden Link Road, Whitestown Way, Tallaght, Dublin 24.
Change of use from light industrial to the use as a training centre and showroom for garage equipment for motor mechanics and for the examination and preparation of vehicles for the NCT test.
E19, South City Business Centre, Killinarden Link Road, Whitestown Way, Tallaght, Dublin 24
8,117 sq.m. Confectionery Manufacturing Facility comprising 1) A 7,223 sq.m. main building (generally 14m high), incorporating areas for: a] Manufacturing (3,233 sq.m., part 18m high) b] Warehouse (1200 sq.m.) c] Office, Workshops, Stores (3,702 sq.m.) d] Plant Area (288 sq.m.) e] Utilities (864 sq.m.) f] Bulk Storage (270 sq.m.) 2) An electrical substation (48 sq.m., 3 m high) 3) Utility area (30 sq.m., 5m high) 4) Utility compound (816 sq.m., 3m high), to accommodate a] Sprinkler Tank (8m high) b] Pump House c] Chillers (5m high) d] Condensers e] Waste Water Treatment Plant f] 2 No. Electrical transformers g] 1 No. Oil storage tank 5) Associated roadways; service yard; car parking (55 spaces); landscaping and site development works. 6) Vehicular Access to the site will be provided via a new road constructed for South City Business Park that will access the local road system via the new extension to Killinarden Heights to Roundabout on Whitestown Way. The proposed development comprises of an activity in relation to which a waste licence is required.
Site 3, South City Business Park, Whitestown, Tallaght, Dublin 24
The addition of 85sq.m. of covered area to the existing building. The works consist of the formation of a new covered enclosure (85sq.m.) over existing plant equipment at ground level. These works are covered under the previously approved Environmental Impact Statement and waste licence.
Unit 3, South City Business Park, Whitestown, Tallaght, Dublin 24.
120 sq.m. extension to the existing Confectionery Manufacturing Facility comprising a pallet storage area (5m high) together with associated modifications to the roadways; service yard; landscaping and site development works. The proposed development comprises of an activity in relation to which a waste licence is required.
Site 3, South City Business Park, Whitestown, Tallaght, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?