LB200035

N/A

Meath - Meath County Council

Proposed Development

planning permission to construct 5 no. parking bays to serve existing childcare facility, including all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Jan 2020

  2. Application withdrawn

    26 Feb 2021

Application Details

Location
No. 2 Castle Hill , Slane , Co. Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council

Timeline

Registration Date
15 January 2020
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
26 February 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

41m
LB170331CONDITIONAL30 Mar 2017

the development will consist of a single-storey extension to the front of the existing house, alterations to the existing front entrance porch; conversion of the existing adjoining single-storey garage into a study & WC, general alteraions & refurbishment of the existing house and all associated site works

No. 4 Castle Hill , Slane , Co. Meath

50m
21343CONDITIONAL23 Feb 2021

a single-storey extension to the rear and side of existing house, alterations to the existing house and associated site works

No. 4 Castle Hill , Slane , Co. Meath

76m
23314CONDITIONAL23 Mar 2023

the upgrade of the Slane Wastewater Treatment Plant and will comprise the following: the demolition of the existing inlet works and the construction of a new inlet works complete with duty fine screen, manual bypass channel, grit removal system, installation of a GRP kiosk to house electrical control panel and all ancillary site works

Slane Waste Water Treatment Plant , Castle Hill Navan Road , Slane Co Meath

84m
LB200063CONDITIONAL23 Jan 2020

the development will provide for the upgrade of the Slane Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank compete with cleaning system and access stairs; construction of a final effluent washwater pumping station; and all ancillary site development works including hard and soft landscaping

Slane Wastewater Treatment Plant , Castle Hil Navan Road , Slane Co. Meath

90m
23545CONDITIONAL24 May 2023

retention of two storey detached dwelling, home office, shed, boundary walls and entrance

Main Street , Slane , Co Meath C15 E024

100m
25105CONDITIONAL5 Jun 2025

the development will consist of proposed external thermal insulation with render finish to external walls of existing single storey dwelling, proposed single storey extensions to side and rear of same, new front porch, replace existing pitched roof of existing two storey extension to rear with new flat roof together with all associated siteworks

No. 8 St. Erc's Terrace , Slane , Co. Meath C15 KX36

100m
23531CONDITIONAL18 May 2023

retention permission for existing extensions to original dwelling and existing part constructed detached outbuildings/sheds to rear of dwelling and planning permission to convert same into home office/domestic store, including all ancillary site works

No. 8 St. Erc's Terrace , Slane , Co Meath

118m
LB201249CONDITIONAL10 Sept 2020

widening of existing vehicular entrance and driveway to front garden, including construction of new footpath crossover and all associated site works

21 Castle Hill , Slane , Co. Meath

162m
22354CONDITIONAL21 Mar 2022

change of use at ground floor from use as retail unit to use as digital hub offices and for internal alterations to existing offices on first floor

Churchlands , Slane , Co Meath

162m
2460218CONDITIONAL28 Mar 2024

The development will consist of change of use at ground floor from use as retail unit to use as a Gym.

Churchlands , Slane , Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.