LB200063

CONDITIONAL

Meath - Meath County Council

Proposed Development

the development will provide for the upgrade of the Slane Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank compete with cleaning system and access stairs; construction of a final effluent washwater pumping station; and all ancillary site development works including hard and soft landscaping

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Jan 2020

  2. Decision: CONDITIONAL

    16 Mar 2020

  3. Decision due

    18 Mar 2020

  4. Grant issued

    19 Jun 2020

Application Details

Location
Slane Wastewater Treatment Plant , Castle Hil Navan Road , Slane Co. Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
0.2 ha

Timeline

Registration Date
23 January 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 March 2020
Grant Date
19 June 2020
Permission Expires
18 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
23314CONDITIONAL23 Mar 2023

the upgrade of the Slane Wastewater Treatment Plant and will comprise the following: the demolition of the existing inlet works and the construction of a new inlet works complete with duty fine screen, manual bypass channel, grit removal system, installation of a GRP kiosk to house electrical control panel and all ancillary site works

Slane Waste Water Treatment Plant , Castle Hill Navan Road , Slane Co Meath

84m
LB200035N/A15 Jan 2020

planning permission to construct 5 no. parking bays to serve existing childcare facility, including all ancillary site works

No. 2 Castle Hill , Slane , Co. Meath

90m
LB170331CONDITIONAL30 Mar 2017

the development will consist of a single-storey extension to the front of the existing house, alterations to the existing front entrance porch; conversion of the existing adjoining single-storey garage into a study & WC, general alteraions & refurbishment of the existing house and all associated site works

No. 4 Castle Hill , Slane , Co. Meath

98m
21343CONDITIONAL23 Feb 2021

a single-storey extension to the rear and side of existing house, alterations to the existing house and associated site works

No. 4 Castle Hill , Slane , Co. Meath

106m
23545CONDITIONAL24 May 2023

retention of two storey detached dwelling, home office, shed, boundary walls and entrance

Main Street , Slane , Co Meath C15 E024

141m
25105CONDITIONAL5 Jun 2025

the development will consist of proposed external thermal insulation with render finish to external walls of existing single storey dwelling, proposed single storey extensions to side and rear of same, new front porch, replace existing pitched roof of existing two storey extension to rear with new flat roof together with all associated siteworks

No. 8 St. Erc's Terrace , Slane , Co. Meath C15 KX36

141m
23531CONDITIONAL18 May 2023

retention permission for existing extensions to original dwelling and existing part constructed detached outbuildings/sheds to rear of dwelling and planning permission to convert same into home office/domestic store, including all ancillary site works

No. 8 St. Erc's Terrace , Slane , Co Meath

174m
LB190258UNCONDITIONAL8 Mar 2019

EXTENSION OF DURATION OF PLANNING PERMISSION SA140107 - Construction of a single storey extension to the rear of an existing house

Church Street , Slane , Co. Meath

175m
22354CONDITIONAL21 Mar 2022

change of use at ground floor from use as retail unit to use as digital hub offices and for internal alterations to existing offices on first floor

Churchlands , Slane , Co Meath

175m
2460218CONDITIONAL28 Mar 2024

The development will consist of change of use at ground floor from use as retail unit to use as a Gym.

Churchlands , Slane , Co. Meath

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?