The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

NA190020

CONDITIONAL

Meath - Meath County Council

Proposed Development

permission to replace existing 12.4m high telecoms structure with a 21m high lattice communication structure, carrying communication dishes and antennae within an existing 2.4 metre high fenced compound

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Jan 2019

  2. Further information received

    12 Nov 2019

  3. Decision: CONDITIONAL

    6 Dec 2019

  4. Decision due

    9 Dec 2019

  5. Appeal submitted

    24 Dec 2019

  6. Appeal decided: MODIFIED

    19 Mar 2020

Application Details

Location
Academy Street , Limekilnhill , Navan Co . Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
0.874 ha

Timeline

Registration Date
15 January 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 December 2019
Permission Expires
18 March 2025

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-306279-19
Decision
MODIFIED
Submitted
24 December 2019
Decided
19 March 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

52m
NA181585CONDITIONAL21 Dec 2018

existing 3 no. 1.3m high antennae, 1 no. 0.3m dish on existing 21 metre high lighting structure, equipment cabinet and associated equipment within a fenced compound. The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network.

Navan Rugby Club , Balreask Old , Navan

108m
NA201724N/A16 Nov 2020

permission for alterations to development permitted under planning reference NA/180879 to include 1. Alterations to forecourt sales building to include a reduced extension footpring comprising of retail with ancillary off-licence, deli area, public seating area with ancillary stores, toilets, ATM and office 2. Omission of repositioned existing car wash and associated works and 3. Construction of new fuel delivery off-loading area at Riverside Service Station, Dublin Road, Limekilnhill, Navan, Co Meath C15 TCK3

Riverside Service Station , Dublin Road Limekilnhill , Navan Co meath C15 TCK3

120m
NA180879CONDITIONAL8 Aug 2018

partial demolition of existing building, retention of existing roof and alterations and extension to existing forecourt sales building to include additional deli, public seating area, public toilets, off-license, relocation of store, relocation of ATM and offices. To reposition existing carwash and reconfiguration of existing carparking including location of air/water services, vent pipes and compound. Significant further information/revised plans submitted on this application

Riverside Service Station , Dublin Road Limekilnhill , Navan Co. Meath C15 TCK3

123m
2111CONDITIONAL5 Jan 2021

permission for alterations to development permitted under planning reference NA/180879 to include 1. Alterations to forecourt sales building to include a reduced extension footprint comprising of retail with ancillary off-licence, deli area, public seating area with ancillary stores, toilets, ATM and office 2. Omission of repositioned existing car wash and associated works and 3. Construction of new fuel delivery off-loading area at Riverside Service Station, Dublin Road, Limekilnhill, Navan, Co Meath C15 TCK3

Riverside Service Station , Dublin Road Limekilnhill , Navan Co meath C15 TCK3

129m
2460509CONDITIONAL8 Jul 2024

the development will consist of: (A)- The Construction of a split-level building with part single-storey and part three-storey school for Árd Rí Community National School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3,591.00m². (B)- The Construction of a two-storey building for St. Ultan’s Special School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs suite, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 4,359.20m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Baker Hall along with additional pedestrian access points to the north and west. Significant further information/revised plans submitted on this application

Baker Hall , Limekilnhill , Navan Co. Meath

140m
2660722N/A12 Jun 2026

Permission for a Large-Scale Residential Development - planning permission for the development of a large-scale residential development at this site of c.1.76 hectares relating to amendments to the permitted SHD (ABP-306021-19 as amended by MCC Planning Reg. Refs: 22/1258, 22/1309, 23/60450 and 25/60599 and extended by Reg. Ref.: 25/71 known as “Baker Hall” at Academy Street, Navan, Co. Meath. The development will consist of: a) The replacement of the 3 no. permitted apartment buildings (Block A – 5 & 6-storeys; Block B – 6-storeys & Block C – 5-storeys of 160 no. apartments comprising 38 no. 1-bedroom apartments and 122 no. 2-bedroom apartments) with an additional 85 no. apartments to provide an overall 245 no. apartments (all apartments with balcony or terrace) and revised mix in 3 no. Blocks as follows: i. Block 1 (5 & 6-storeys) consists of 85 no. apartment units (22 no. studio, 40 no. 1-bedroom and 23 no. 2-bedroom apartments, with internal cycle parking at ground floor level; ii. Block 2 (6-storeys) consists of 93 no. apartment units (24 no. studio, 45 no. 1-bedroom apartments and 24 no. 2-bedroom apartments, with internal cycle parking at ground floor level; iii. Block 3 (5-storeys) consists of 67 no. apartments (20 no. studio, 37 no. 1-bedroom and 10 no. 2-bedroom apartments, with internal cycle parking at ground floor level; b) Vehicular access will be from the permitted entrance from Academy Street, with provision of 172 no. car parking spaces and 468 no. bicycle spaces comprising 328 no. long-stay spaces for residents, 18 no. cargo bicycle spaces and 122 no. visitor bicycle spaces; c) Connections to services (foul, water and attenuation) will be to the permitted SHD layouts (ABP-306021-19, as amended); d) Permission is also sought for 3 no. single-storey bicycle/bin stores along with a single-storey ESB sub-station, revisions to landscaping to include amendments to landscaping to accommodate permitted Part 8 scheme along Academy Street (MCC Reg. Ref. P822011), communal open space, provision of an emergency access route, pumping station and all associated site works to facilitate the proposed development. A Natura Impact Statement has been prepared in respect of the proposed development and is submitted with this application. A dedicated website has been set up for the LRD application which can be viewed at: www.academystreetlrd.ie

Academy Street , Navan , Co. Meath

140m
2660748CONDITIONAL18 Jun 2026

We, Glenveagh Homes Ltd., intend to apply for planning permission for the development of a large-scale residential development at this site of c.1.76 hectares relating to amendments to the permitted SHD (ABP-306021-19 as amended by MCC Planning Reg. Refs: 22/1258, 22/1309, 23/60450 and 25/60599 and extended by Reg. Ref.: 25/71 known as “Baker Hall” at Academy Street, Navan, Co. Meath on lands within the curtilage of Belmount House (a protected structure - RPS ID 90938). The development will consist of: a) The replacement of the 3 no. permitted apartment buildings (Block A – 5 & 6-storeys; Block B – 6-storeys & Block C – 5-storeys of 160 no. apartments comprising 38 no. 1-bedroom apartments and 122 no. 2-bedroom apartments) with an additional 85 no. apartments to provide an overall 245 no. apartments (all apartments with balcony or terrace) and revised mix in 3 no. Blocks as follows: i. Block 1 (5 & 6-storeys) consists of 85 no. apartment units (22 no. studio, 40 no. 1-bedroom and 23 no. 2-bedroom apartments, with internal cycle parking at ground floor level; ii. Block 2 (6-storeys) consists of 93 no. apartment units (24 no. studio, 45 no. 1-bedroom apartments and 24 no. 2-bedroom apartments, with internal cycle parking at ground floor level; iii. Block 3 (5-storeys) consists of 67 no. apartments (20 no. studio, 37 no. 1-bedroom and 10 no. 2-bedroom apartments, with internal cycle parking at ground floor level; b) Vehicular access will be from the permitted entrance from Academy Street, with provision of 172 no. car parking spaces and 468 no. bicycle spaces comprising 328 no. long-stay spaces for residents, 18 no. cargo bicycle spaces and 122 no. visitor bicycle spaces; c) Connections to services (foul, water and attenuation) will be to the permitted SHD layouts (ABP-306021-19, as amended); d) Permission is also sought for 3 no. single-storey bicycle/bin stores along with a single-storey ESB sub-station, revisions to landscaping to include amendments to landscaping to accommodate permitted Part 8 scheme along Academy Street (MCC Reg. Ref. P822011), communal open space, provision of an emergency access route, pumping station and all associated site works to facilitate the proposed development. A Natura Impact Statement has been prepared in respect of the proposed development and is submitted with this application. A dedicated website has been set up for the LRD application which can be viewed at: www.academystreetlrd.ie

Academy Street , Navan , Co. Meath

145m
NA190633CONDITIONAL21 May 2019

permission for revised opening hours until 6pm, for the part of the existing creche facility at former Apt 123 at

Kiddy Academy , Academy Square Academy Street , Navan Co. Meath

163m
NA170921N/A8 Aug 2017

construct single storey extension to rear of existing dwelling, to replace existing rear window with proposed door, install rooflights to existing dwelling, including all ancillary site works

37 Academy Street , Navan , Co. Meath

168m
2460203CONDITIONAL22 Mar 2024

The development will consist of to erect an Entrance Canopy over front door to Doctor on Call facility to South West entrance.

Ground Floor Unit 2 , Block G Academy Square , Academy Street Navan Co. Meath.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?