the development will consist of alterations to a previously approved Data Centre Campus application (Meath County Council ref: RA/150605/An Bord Pleanala ref: PL17.245347) comprising the following elements: 1) Alterations to the layout, design, external lighting and siting of the previously consented entrance guardhouse of the Data Centre Campus (granted under reg. ref: RA/150605 and ABP reg. ref: PL17.245347) involving the extension of the guardhouse canopy and adddition of Corten steel to the facade and canopy of the building; 2) Proposed boundary treatment improvements including: 3.0m high weathered steel Corten Picket fencing on a concrete base wall (Type 1); 3.0m high mesh boundary fencing with matching gates (Types 2 and 3) and associated works; 3) CCTV cameras; 4) 3.0m high fence and matching gates along the internal substation access road; 5) 600mm high oak bollards on the edge of road/pathways; and 6) All other associated works. The above application is concurrent with a separate planning application to Fingal County Council for alterations to the previously approved boundary treatments under register reference FW16A/0127
View the full application file on the council's planning portal →Application Timeline
Application received
22 Jan 2018
Decision: CONDITIONAL
6 Mar 2018
Decision due
18 Mar 2018
Grant issued
13 Apr 2018
Application Details
- Location
- Lands at Portan Gunnocks & Clonee County Meath - bounded to the south by the R147 , to the west by the Kilbride Road to the north by The Mayne and to the east by , lands at Damastown Industrial Park
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Meath County Council
- Site Area
- 92.32 ha
Timeline
- Registration Date
- 22 January 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 March 2018
- Grant Date
- 13 April 2018
- Permission Expires
- 12 April 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the proposed development will consist of an expansion of the existing approved data centre Campus (Meath County Council ref: RA/150605 / An Bord Pleanala ref: PL 17.245347) comprising the following elements (a) Construction of two single-storey data centre buildings with a gross floor area (GFA) of circa 57,400m2; (b) A single storey administration / office building with a GFA of circa 5,710m2 which is physically linked to the proposed data centre buildings; (c) Site infrastructure to include entrance gates and appropriate signage, a security guardhouse of circa 60m2 and associated canopy; (d) Road works including a new permanent site access, internal roadways, underpass & footpaths, circa 276 no. car parking spaces, bicycle parking facilities, upgrades to a section of the L5028 Kilbride Road together with an emergency access via the L10101 to include resurfacing only a section of the road and additional of circa 1 no. passing bay; (e) General drainage networks and arrangements and a connection to the existing public sewer network; (f) Surface level back-up generators with internal fuel tanks; (g) Hard & soft landscaping incorporating perimeter fencing to include both external and internal circa 3.0 metre high architecturally designed metal fencing and matching gates; (h) Temporary construction access and associated car parking arrangements off the Kilbride Road (L5028); and (i) Associated & ancillary site works. Planning permission is being sought for a 10 year period. The is a separate planning application and associated EIAR on lands enclosed by the data centre application. It is a Strategic Infrastructure Development (SID) application to An Bord Pleanala under S182A of the P&D Act 2000, as amended. The application comprises the construction of a new 220KV substation compound & assoc. underground 220KV cables connecting to the existing substation at Portan, Clonee(consented ABP ref PL17.VA0018). An Environmental Impact Assessment Report (EIAR) has been prepared for the proposed development and has been submitted with this application.
Portan Gunnocks Loughsallagh & Clonee , Co. Meath
Signage in the form of a 2no. Installation Notice Board, measuring 1200mm x 750mm. 2no windstocks (2.13 in lenght), upon 6m high galvanised masts. The works have been erected to comply with the requirements of a Camus-wide Industrial Emissions Licence from the Environmental Protection Agency. The works to be retained are at the entrances to the existing buildings onsite, namely Buildings 1-3 (Eircode D15 NN9V and Buildings 5-6 (Eircode D15 TP6X).
Portan & Clonee , North of Clonee Village , Co Meath
the development will consist/consists of 2 no. Steel Storage sheds with the following approximate dimensions (i) 6ft wide x 10ft long x 8ft high, (ii) 6ft wide x 7ft long x 8ft high. Both shall be located beside each other in the corner of the existing carpark near the practice wall. They shall be situated above the existing carpark tarmac. Colour shall be neutral to the location (e.g. grey, brown, black, dark green)
Dunboyne Tennis Club , Old Kilbride Road , Clonee Co. Meath D15 Y228
the developlment will consist of alterations to a previously approved Data Centre Campus application (Meath County Council ref: RA/150605/An Bord Pleanala ref: PL17.245347) comprising the following elements: 1) Alterations to the layout, design, external lighting and siting of the previously consented entrance guardhouse of the Data Centre Campus (granted under reg. ref: RA/150605 and ABP reg. ref: PL17.245347) involving the extension of the guardhouse canopy and adddition of Corten steel to the facade and canopy of the building; 2) Proposed boundary treatment improvements including: 3.0m high weathered steel Corten Picket fencing on a concrete base wall (Type 1); 3.0m high mesh boundary fencing with matching gates (Types 2 and 3) and associated works; 3) CCTV cameras; 4) 3.0m high fence and matching gates along the internal substation access road; 5) 600mm high oak bollards on the edge of road/pathways; and 6) All other associated works. The above application is concurrent with a separate planning application to Fingal County Council for alterations to the previously approved boundary treatments under register reference FW16A/0127
Lands at Portan Clonee County Meath - bounded to the south by the R147 , to the west by the Kilbride Road to the norht by The Mayne and to the east by , lands at Damastown Industrial Park
the development will consist of the demolition of the existing two storey dwelling and the construction of a new development of 2 no. residential blocks (Block A and Block B) giving a total of 73 no. Apartments (36 no. 1 beds, 29 no. 2 beds and 8 no. 3 beds), Block A consists of 14 no. 1 beds, 17 no. 2 beds and 8 no. 3 beds from first to fifth floor. Block B consists of 22 no. 1 beds, and 12 no. 2 beds from first to sixth floor. The development will also include all associated car parking at ground floor of Block A and B and surface parking, new vehicular and pedestrian site access, cycle lane, public open space with a new access to the site, landscaping, bin storage, bike storage, signage, ESB substation and all associated site development works including connections to foul and surface water drainage/attenuation and water supply/storage
Aylesbury House , Main Street Portan , Clonee Co. Meath
the construction of a public park to include a playground (c.1,024 sqm) comprising 12 no. pieces of play equipment and safety surfacing, 5 no. car parking spaces, bicycle parking, public lighting, footpath and cyclepath, bins, benches, signage, boundary treatments, landscaping and all associated site development works. All on a site area of 1.6 ha. Access to the proposed development will be from the existing public road (Old Kilbride Road). The proposed development includes a modification to the boundary permitted under Reg Ref RA/191603
(formerly known as Aylesbury House & Surrounding lands) , Main Street , Clonee Co Meath
the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as temporary substation to help power the campus during construction stage. The site area is circa 0.04 Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the lower side of the tier and a height of 4.27 metres on the higher tier. The building has a width of 5.3 metres at both ends. The building being retained has an area of 69.5sq.m.
Lands at Loughsallagh to the north of Clonee Village , Co. Meath
the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as a temporary substation to help power the campus during construction stage. The site are is circa 0.04Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the lower side of the tier and has a height of 4.27 metres on the higher tier. The building has a width of 5.3 metres at both ends. The building being retained has an area of 69.5sq.m.
Lands at Loughsallagh to the north of Clonee Village , Clonee , Co. Meath
The development will consist of the proposed amendment to existing approved permission references RA190648 & ABP306842-20 and the development will consist of: 1. Demolition of existing Public House, Outbuildings & and any associated existing structures. 2. Construction of a new part 4 storey & part 5 storey mixed use building to accommodate 3 no. commercial/retail units & 36 no apartments, with the breakdown per floor as follows: a) On ground floor 3 no. new commercial/retail units, 3 no. 1 bedroom apartments & 1 no. 2 bedroom apartment & public plaza/hard landscaped area fronting onto the main street. b) On first floor 6. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. c) On second floor 6. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. d) On third floor 6. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. e) On fourth floor 2 no. 2 bedroom apartments with associated private amenity spaces & a rooftop terrace communal amenity spaces for the building residents. 3. New parallel parking spaces at the main street. 4. New private carpark and bicycle parking to the rear of the building with new development entrance. 5. Provision of a new foul sewer connection to the adjoining public foul sewer network. 6. Provision of storm water drainage and connection to adjoining public storm water network. 7. Provision for a new water connection to the building from the adjoining public water main. 8. Provision of public lighting throughout the development site. 9. Provision of bin storage (integrated into the building at ground floor level). 10. All associated site development works & services.
Clonee House , Main Street , Clonee
the development will consist of: 1. Demolition of existing vacant Public House, Outbuildings & and any associated existing structures. 2. Construction of a new part 4 storey & part 5 storey mixed use building to accommodate. 3 no. commercial/retail units & 36 no apartments, with the breakdown per floor as follows: a) On ground floor 3 no. new commercial/retail units, 3 no. 1 bedroom apartments & 1 no. 2 bedroom apartment & public plaza/hard landscaped area fronting onto the main street. b) On first floor 5. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. c) On second floor 6. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. d) On third floor 6. No 1-bedroom apartments & 4 no. 2 bedroom apartments with associated balconies/private amenity spaces. e) On fourth floor 2 no. 1 bedroom apartments & 1 no. 2 bedroom apartment with associated private amenity spaces & a rooftop terrace communal amenity spaces for the building residents. 3. New parallel parking spaces at the main street. 4. New private carpark and bicycle parking to the rear of the building with new development entrance. 5. Provision of a new foul sewer connection to the adjoining public foul sewer network. 6. Provision of storm water drainage and connection to adjoining public storm water network. 7. Provision for a new water connection to the building from the adjoining public water main. 8. Provision of public lighting throughout the development site. 9. Provision of bin storage. 10. All associated site development works & services. Significant further information/revised plans submitted on this application