The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

S99A/0855

Refuse Outline Permission

Dublin - South Dublin County Council

Proposed Development

Change of use of Baldonnel House, a list 2 building, and associated lands and outhouses including the stables and derelict gate lodge from residential use to use as hotel and golfing facilities.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Jan 2000

  2. Decision: Refuse Outline Permission

    18 Feb 2000

  3. Decision due

    2 Mar 2000

Application Details

Location
Baldonnel House, Baldonnel, Dublin 22.
Applicant
N/A
Application Type
Outline Permission
Planning Authority
South Dublin County Council
Site Area
25.6 ha
Floor Area
394 sq m

Timeline

Registration Date
5 January 2000
Status
Decision
Decision
Refuse Outline Permission
Decision Date
18 February 2000

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

135m
SD08A/0200Granted25 Mar 2008

Constructional of an additional 106.62sq.m. of internal infill floor space at first floor level providing storage and 3 no. office spaces.

Unit A8, Kingswood Business Park, Baldonnel Road, Baldonnel Lower, Dublin 22.

141m
SD09A/0392Granted21 Dec 2009

Extension of use of 214sq.m. warehouse/light industrial area to include waste transfer station for the temporary storage of non hazardous commercial waste for onward disposal by a licensed waste contractor. The waste will be stored in a sealed and enclosed skip located internally. A Waste Permit will be applied for from South Dublin County Council. All plans, elevations including overall building height of 9.0m, office area of 93sq.m. on 2 floors and subject area of 214sq.m. remain unaltered due to this extension of use application and remain as per the granted planning applications Reg. Ref. SD06A/0245 and SD07A/0141.

Unit B2, Kingswood Business Park, Baldonnell, Dublin 22

152m
SD08A/0087Granted16 Apr 2008

Change of use from previously approved light industrial/warehouse use (Reg. Ref. SD07A/0141), internal alterations and construction of a new first floor level. The proposed use will be computer storage, computer maintenance amd workshop areas, security vault together with office areas, recovery suites and ancillary staff areas; alterations to the east elevation to provide new ground and first floor windows and new fire exit door and the erection of new illuminated signs in the north and east elevations.

Unit B18, Baldonnel Business Park, Baldonnel Lower, Clondalkin, Dublin 22

152m
SD06A/0245Granted7 Dec 2006

In response to the request for Additional Information, the development has been revised to provide for the relocation of the main access road from Baldonnell Road to the north, alterations to the layout and revisions to the red line site boundary deriving from the change in the position of the access road. The revised scheme provides for two blocks comprising 35 new light industrial/warehousing units with a total gross internal area of 7985 sq. m., of which 1415 sq. m. will be ancillary office space; 276 car parking spaces.

Site at Baldonnel Road, Baldonnell Lower, Dublin 22.

164m
SD21A/0115Refused12 May 2021

Further alterations to an existing granted planning application (previously granted permissions Reg. Ref. S018A/0314 (ABP-304148-19); SD19A/0408; S020A/0187); alterations consist of site plan alterations; revised site boundary to suit new arrangement of additional land used as concrete yard and HGV parking; omission of an existing roundabout and provision of a road junction with an access/egress to the proposed development and to the existing business park; provision of a new boundary fence type A to the southern and eastern site boundary; associated drainage adjustments; all other details will remain as per the aforementioned granted planning applications.

Kingswood Business Park, Baldonnel, Dublin 22.

167m
SD24A/0258WGranted2 Mar 2025

The proposed development will consist of the following: 1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.

Baldonnell Lower, Kingswood Business Park, Dublin 22, D22E9C3

167m
SD24A/0220WInvalid - Site Notice3 Oct 2024

1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.

Baldonnell Lower, Kingswood Business Park, Dublin, D22 E9C3

167m
SD24A/0240WInvalidate Application4 Nov 2024

The proposed development will consist of the following: 1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.

Baldonnell Lower, Kingswood Business Park, Dublin 22, D22E9C

170m
SD21A/0239Granted1 Feb 2022

Alterations to an existing granted planning application (previously granted permissions Reg. Ref. SD18A/0314 [ABP-304148-19], SD19A/0408, SD20A/0187); reconfiguration of the ground floor area consisting of a new ancillary storage area to the proposed building's eastern elevation measuring 75sq.m, at mezzanine level; change of use of 57sq.m of warehouse floor area to staff facilities due to the following, addition of single storey fire protected corridor from Office A to in the south-west corner of the warehouse, overall 45sq.m floor area addition; addition of stairs from warehouse to mezzanine level, overall 12sq.m floor area addition; elevation alterations, introduction of covered glazed structure at the main Office entrance to the front (southern) elevation, overall height 6.18m; introduction of Integrated Modular Louvre System to Charging Area to the front (southern) and side (eastern) elevation; change of colour of southern elevation warehouse canopy to Anthracite; introduction of fire escape doors to the side (eastern) elevation; site plan alterations, omission of an existing roundabout and provision of revised road junction with an access/egress to the proposed development and to the existing Business Park; provision of a new boundary fence Type A to the southern and eastern site boundary; introduction of additional 26 HGV parking spaces to the western concrete yard (overall area 1547sq.m) and the omission of car parking at the same location; introduction of 8 van parking spaces (overall area 240sq.m) and rearrangement of the car parking spaces due to introduction of the above changes, plus addition of gas tank and generator; associated drainage layout adjustments due to the inclusion of the above alterations; all other details such as landscaping, external surface finishes etc. will remain as per the aforementioned granted planning applications.

Kingswood Business Park, Baldonnel, Dublin 22.

170m
SD08A/0026Granted17 Jan 2008

Amalgamation of previously approved Units A12 and A13 into one single unit.

Kingswood Business Park, Baldonnell Road, Baldonnell Lower, Dublin 22.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?