SD02A/0480
GrantedDublin - South Dublin County Council
Proposed Development
Relocation of existing jet car wash, provision of new automatic car wash, relocation of car parking, remove section of existing palisade fence and erect new section of palisade fence.
View the full application file on the council's planning portal →Application Timeline
Grant issued
6 Jan 2002
Application received
14 Aug 2002
Decision due
9 Oct 2002
Decision: Grant Permission
14 Nov 2002
Application Details
- Location
- Grange Castle Filling Station, Nangor Road, Clondalkin Dublin 22
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 0.1043 ha
Timeline
- Registration Date
- 14 August 2002
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 14 November 2002
- Grant Date
- 6 January 2002
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of existing dwelling and construction of 1590 m. sq. of new small enterprise units to consist of between 1 and 6 units or combination thereof, to suit occupiers requirements and all associated site works. For use as light industrial and industry offices to consist of data processing, software development, telemarketing, research development, information technology and science research.
Kilcarbery Business Park, Nangor Road, Dublin 22.
Retention of existing air conditioning condenser units and associated services with a modified layout affixed to the rear wall.
25, The Courtyard, Kilcarberry Business Park, Clondaklin, Dublin 22
Retention of existing air conditioning condenser units and associated services with a modified layout affixed to the rere wall.
Unit 25 The Courtyard, Kilcarbery Business Park, Clondalkin, Dublin 22.
6062 sq.m. of small enterprise units for light industrial and industry office use. The development will be sub- divided into either 16 or 25 units or combination thereof to suit occupier's size requirements.
Kilcarbery Industrial Park, Nangor Road, Dublin 12.
Phase 1 of a services and retail centre and will consist of 3 no. office blocks as follows: (1) Block A comprises a five storey office building of 3,019.6 sq.m. gross floor area which fronts onto the Nangor Road and which will accommodate 18 no. own door office units and 1 no. ESB substation; (2) Block B comprises a five storey office building of 2,905.1 sq.m gross floor area which fronts onto the Nangor Road and is located adjacent to the boundary with Grange Castle Golf Course - this block will accommodate 26 no. own door office units; (3) Block C comprises a four storey office building of 2,684.8 sq. m. gross floor area located adjacent to the boundary with Grange Castle Golf Course which will accommodate 24 no. own door office units. The proposed blocks are arranged in a u-shaped configuration around a central landscaped square. Vehicular access to the site is proposed via a left-turning entry and exit slip lane from the Nangor Road and also via the internal Spine Road permitted under application Reg. Ref. SD06A/0568. The proposed development includes 30 no. surface level car parking spaces and one level of underground car parking which will accommodate 200 no. car spaces. The development also includes all ancillary services, landscaping and site works on a site of 1.3163 hectares. This application is being lodged pursuant to application Reg. Ref: SD06A/0568 under which planning permission was granted for the development of roads and services to facilitate the 'Profile Park' Business Park.
'Profile Park', Nangor Road, Ballybane, Dublin 22.
Gatehouse, security barriers, gates and flanking walls.
Entrance to Kilcarbery Distribution Park, Nangor Road, Clondalkin, Dublin 22.
10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
Erection of a 2.4m high perimeter fence along Nangor Road boundary (approximately 250m long) with separate entrance gates for vehicular, bicycle and pedestrian access; construction of a single storey security hut with security barriers.
Profile Park, Nangor Road, Clondalkin, Dublin 22
Installation of a non-illuminated sign comprising of individual letters and logo to be mounted to the building facade
Gleneely Foods Ltd, Unit 5, Kilcarbery Park, New Nangor Road, Clondalkin, , Dublin 22.