SD07A/1047
GrantedDublin - South Dublin County Council
Proposed Development
(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270m2); (d) provision of security hut with associated toilet facility (20m2); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping.
View the full application file on the council's planning portal →Application Timeline
Application received
21 Dec 2007
Decision due
22 Feb 2008
Decision: Grant Permission
22 Feb 2008
Grant issued
1 Apr 2008
Application Details
- Location
- Belgard Quarry, Cheeverstown Townland, Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 40000 ha
- Floor Area
- 290 sq m
Timeline
- Registration Date
- 21 December 2007
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 22 February 2008
- Grant Date
- 1 April 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270sq.m.); (d) provision of security hut with associated toilet facility (20sq.m.); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping.
Belgard Quarry, Cheeverstown Townland, Tallaght, Dublin 24
The development of a plant for the manufacture of precast concrete products with associated offices (approximate gross floor area of 4831sq.m); batching plant incorporating cement silo and aggregate storage bins; 30 car parking spaces and associated site and landscaping works. The highest point of the development will be 17m above ground level. Access to the site will be provided from existing entrances off the Naas Road and Cookstown Road at
Fortunestown, Dublin 24.
Installation of an ESB 38kV Overhead Line Switching Compound at Roadstone Belgard Quarry Lands, in the part of the Quarry Lands which are located in the Townland of Cheeverstown, Barony of Upper Cross, Dublin 24. The location of the proposed Compound will be east of the recently commissioned New Outer Ring Road R136, Cheeverstown N7 to N81 and the east of the existing Screening Bund, which follows the route of the Outer Ring Road, in Belgard Quarry Lands Cheeverstown Townland, and will be adjacent to, and will be accessed from, the new Belgard Quarry entrance Road, off the above mentioned Outer Ring Road. The Compound will contain three no. 38kV 12 Metre Line Termination Masts and two no. Double Wood Portals. LBFM Switchgear will be installed at the top of the Double Wood Portals. The proposed Compund will measure 80 metres X 30 metres and will require the installation of a 2.4 metre High Palisade Fence, with gates for ESB access. The 38kV Overhead Line Switching Compound will be required to facilitate undergrounding of a section of the Grange Castle-Saggart/Tee Cheeverstown 38kV Line, while still maintaining a 38kV switching Facility for ESB Control of the circuit.
East Of R136 Outer Ring Road, Cheeverstown N7 To N81
Recovery of pre-sorted construction and demolition waste (namely concrete, bricks, tiles and ceramics, asphalt and topsoil) on a 3.9 hectare site within its existing landholding. Construction of an internal access road within Belgard Quarry, hardstanding area for stockpiling and waste recovery and waste inspection area (200m2). Provision is also made for portakabin office (39m2). Operations to be carried out include crushing and stockpiling of material using mobile plant.
Belgard Quarry, Cheeverstown, Co. Dublin.
Retention of the following: (1) Quarry control office & garage (1835sq.m) & 5 storage portacabins (14sq.m,14sq.m, 14sq.m 12.6sq.m & 8.4sq.m); (2) ESB switching station (58sq.m) & substation (36sq.m); (3) spare parts storage area (c. 2445sq.m); (4) maintenance shed (117.7sq.m); (5) car park (30 spaces & 627.7sq.m); (6) 2 lampost (10.5m high); (7) 'Clause 804' plant (1177.7sq.m); (8) wet sand plant (684.4sq.m); (9) 2 weighbridges (325.4sq.m); (10) general waste storage area (c. 12.5sq.m); (11) quarry fuelling station with two 9m3 fuel tanks (126.8sq.m); (12) metal recycling storage area (c.310sq.m); (13) truck parking area (c. 6632sq.m); (14) 1 security camera post (2.2m high); (15) 1 lamp post (9.2 high); (16) hydrocarbon interceptor; (17) tyre storage bays (c.140sq.m); (18) dry sand pant (2203.4sq.m); (19) 1 lamp post (10.3m high); (20) quarry stores (163sq.m); (21) effluent holding tank; (22) security station (13.9sq.m) and 2 lamp post (6.5m high); (23) wheel wash (236.3sq.m); (24) 'Tricel' effluent treatment system; (25) settlement lagoon system (3208.9sq.m); (26) sand polishing filter; (27) security fence (2.9m high); (28) overburden storage mound (7.3 ha); (29) perimeter screening berm (5m to 8m high by 1.6km long & 6ha); (30) perimeter screening berm (5.2m high by 310m long & 7930sq.m); (31) plant storage area ( 8356sq.m); (32) perimeter screening berm (9.2m high by 147 long & 4770sq.m); (33) screening berm (8.4m high by 340m long & 5257sq.m); (34) perimeter screening berm (6.5m high by 240m long & 5665sq.m); (35) perimeter screening berm (9m high by 320m long & 1ha); (36) screening berm (2.7m high by 245m long &3125sq.m); (37) screening berm (3.5m high by 950m long & 1.1ha); (38) screening berm (3m high by 243m long & 3030sq.m); (39) screening berm (3.3m high by 238m long & 2088sq.m); (40) settlement pond area (6.4ha); (41) screening berm (3.5m high by 379m long & 4793sq.m); (42) screening berm ( 3.1m high by 244m long & 3743sq.m); (43) internal access road (285m long) to Outer Ring Road entrance/exit, gate, pedestrian gates, footpaths, paladin fencing (1.8m high) & 6 lampposts (6m high); (44) screening berm (5.2m high by 215m long & 4040sq.m); (45) relocation of entrance to C&D recovery site permitted under SD02A/0167 & all ancillary site works; internal roads & landscape planting.
Belgard Quarry at Cheerverstown, Whitehall and Belgard Townlands, Tallaght, Dublin 24
Improvement of the sightlines on the northern side of the main entrance off the R136 Cheeverstown Road, including removal of a section of the existing boundary wall; construction of a new section of boundary wall (same height and materials as the existing wall); landscaping and all ancillary works within a c. 0.145 hectare application area at the existing quarry.
Cheeverstown Road, Belgard Quarry, Fortunestown, Tallaght, Dublin 24
The establishment of an asphalt plant and ancillary site facilities at the site stated above. The proposed asphalt plant has a maximum of height of 20 metres, includes a number of different components and has a total area of ca. 311.5sq.m. The proposed ancillary facilities include 4 no. portacabin site offices; a wheelwash facility, a weighbridge facility; a staff car-parking area; a hard-stand area: an ESB station, an internal road and an effluent treatment and disposal system. It is proposed to operate the asphalt plant 24 hours a day, seven days a week. Application is made operate the plant for a 30 year period
Belgard Quarry, Cheeverstown, Tallaght, Dublin 24.
Concrete plant (715sq.m) with a maximum height of 18 metres; extension to the extension to the existing Dry Mortar 'Flomix' plant (302sq.m) with a maximum height of 33.3 metres (Ref. SD16A/0410); truck wash out bays (187sq.m); a water storage tank (35sq.m.); ancillary facilities within a 1.50 hectare application area at the existing quarry.
Cheeverstown townland, Fortunestown, Tallaght, Dublin 24
Additions to existing asphalt plant to facilitate use of recycled asphalt materials
Fortunestown, Tallaght, Dublin 24
1,020 sq.m. single storey warehouse unit with associated 1,115 sq.m. 2-storey offices on 0.55 hectare site. Including all associated hard and soft landscaping site services, car parking and yard area.
Kingswood Drive, Citywest Business Campus, Saggart, Co. Dublin.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?