SD14A/0118
Grant Permission for RetentionDublin - South Dublin County Council
Proposed Development
Retention of existing timber framed and timber clad pigeon loft set off the ground on top of existing steel shipping containers in commercial yard.
View the full application file on the council's planning portal →Application Timeline
Further information requested
24 Jul 2014
Application received
23 Jan 2015
Further information received
23 Jan 2015
Decision: Grant Permission for Retention
18 Feb 2015
Decision due
19 Feb 2015
Grant issued
27 Mar 2015
Application Details
- Location
- Unit 4A, JFK Drive, Bluebell Industrial Estate, Dublin, 12
- Applicant
- N/A
- Application Type
- Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 19 ha
- Floor Area
- 19 sq m
Timeline
- Registration Date
- 23 January 2015
- Status
- Decision
- Decision
- Grant Permission for Retention
- Decision Date
- 18 February 2015
- Grant Date
- 27 March 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Upgrade to the existing permitted sludge storage sump and bunded liquid waste storage area. This upgrade will consist of retention of an increase in height of the pre-existing reinforced concrete wall in order to raise the wall around the east, west and rear elevations to a uniform height of 2.64m, and permission for the construction of a single skin cladded roof to cover this storage area of 170sq.m, construction of single skin cladded sides from the top of the reinforced concrete walls at the east, west and rear elevations to the roof. The enclosure will remain open at the front elevation. The covered area will slope from a height of 6.49m at the front elevation to a height of 3.92m at the rear elevation. The activity being carried out at the site is one that requires an Industrial Emissions Licence from the EPA.
J.F.Kennedy Drive, Naas Road, Dublin 12
Demolition of the existing warehouse and ancillary office space (c. 459sq.m) and 2 curtain sided storage racks (c. 46sq.m) and the provision of a new warehouse with ancillary office space (c. 746sq.m) and associated development; The proposed warehouse will have a maximum height of c. 11.15 metres; Minor repositioning of an internal gate; The rearrangement of the car parking spaces comprising a reduction from 10 to 7 car parking spaces (including the provision of an accessible parking space); Bicycle parking; The provision of a sectional door on the north-east elevation; External signage; Rooflights; Lighting; Boundary treatments and all associated site development works above and below ground.
John F Kennedy Road, John F Kennedy Industrial Estate, Dublin 12, D12 CF34
Construct an underground reinforced concrete tank (415 cubic metres) for the seperating of water mixed with waste oil to the rear of premises.
Macanulty Specialist Underground Services,, John F. Kennedy Road,, Dublin 12.
Change of use of 147sq.m of existing ground floor warehouse area to a food production area including new extract duct taken through the roof from proposed cookline canopy and new grease trap together with all associated site works.
Bluebell Industrial Estate, Bluebell Avenue, Dublin 12
Change of use from first floor storage to customer waiting area and sales office at Block A.
Motor Vation Bluebell, Bluebell Avenue, Bluebell Industrial Estate, Dublin 12.
(a) change of use is sought of 2 no. industrial units to motor sales outlet and service centre respectively (b) signage to front and side of front building.
Punch Holdings Premises, Bluebell Industrial Estate, Bluebell Avenue, Dublin , 12.
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is laid around the main building 4) Erecting company signage on the main building overall size 0.9m x 18.75m 5) Add 19 No. street lights within the company forecourt 6) Install two electric gates 7) Add metal lines above the roof of the main building 8) Repainting exterior wall paint 9) Replace all doors and windows of the main building, the outer frame color of doors and windows is gun grey 10) On the southeast side of the main building, establish a 4700mm wide and 3100mm high billboard.
JFK Enterprise Centre, Bluebell, Dublin 12, D12 F229.
Installation of 279 solar PV panels on the roof of the Eatto building.
Eatto, John F Kennedy Road, John F Kennedy Industrial State, Dublin 12
To construct a new 65.47sq. m. ground floor extension to the side of existing premises including internal alterations, to erect a new grey palisade fence 2.4 metres high with entrance gates to replace existing low level wall to the front boundary and new grey palisade fence 2.4 metres high to the side boundary.
John F. Kennedy Road, John F. Kennedy Industrial Estate, Dublin 12.
A new storage lobby extension to the side/rear of the Eatto building, Unit 220.
Eatto, Unit 220, John F Kennedy Road, John F Kennedy Industrial State, Dublin 12, D12 ED68