SD14A/0262

Granted

Dublin - South Dublin County Council

Proposed Development

A 111sq.m (gross) single storey extension to the north facade of the existing facility; the development includes connection to existing storm water drainage, process water drainage and associated site works required for the extension.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Dec 2014

  2. Decision: Grant Permission

    4 Feb 2015

  3. Decision due

    5 Feb 2015

  4. Grant issued

    12 Mar 2015

Application Details

Location
Aryzta Bakeries Ireland, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
93000 ha
Floor Area
111 sq m

Timeline

Registration Date
3 December 2014
Status
Decision
Decision
Grant Permission
Decision Date
4 February 2015
Grant Date
12 March 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD06A/0527Granted26 Jun 2006

Demolition of an existing habitable house and associated farm outhouses and construction of Head Quarters Offices; Production Plant and National Distribution Centre which comprises of a five-storey office block (total gross floor area 5,375sq.m.) linked via a glazed 365sq.m.) atrium to a two-storey office block (total gross floor area 1618sq.m.; a production plant (total gross floor area 17,153sq.m.) with ancillary plant, substation, storage, workshop, offices and staff facilities including storage at mezzanine level; a distribution centre (total gross floor area 17,480sq.m.) comprising of a cold store, an ambient store; other ancillary storage areas; forklift battery charging area, plant and staff facilities with office space at mezzanine level; 10 no. flour silos, water tank and substation screened by a free-standing structure and ESB station; a water treatment plant and underground attenuation tank; an underground pump-house; new site entrance and access security hut located to the south-east of the site with access onto an internal Business Park distributor road; provision of 60 no. truck parking spaces with power plug in points; provision of 470 no. staff car parking spaces; provision of water feature/attenuation lake and all other landscaping and boundary works; provision of all other associated site and development works. Total development will comprise of 42,600sq.m. of buildings on an overall site area of 9.3 ha. This planning application is accompanied by an Environmental Impact Statement.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

0m
SD07A/0102Granted13 Feb 2007

Modifications to previously permitted development under South Dublin County Council Register Reference SD06A/0527. The modifications include the reconfiguration of building layout and the following changes: an increase in the front office of HQ building from 4970sq.m. to 6,241sq.m. (gross floor area (gfa)), an increase in the rear office from 1,497 to 2,053 sq.m. (gfa), an increase in the atrium area from 324sq.m. to 398sq.m. (gfa); on the ground floor a reduction in the cold store/distribution area from 10,178sq.m. (gfa) to 9,483 sq.m. (gfa), a new mezzanine area to cold store of 840 sq.m. (gfa), an additional mezzanine area to battery charging area of 506 sq.m. (gfa), an additional plant room on mezzanine level of 68sq.m. (gfa), an additional fire escape adjacent to the ambient store, an additional external fire escape on north elevation adjacent to battery charging area, two additional silo buildings of 64 sq.m. (gfa) and 58sq.m. (gfa), the removal of 1 flour silo and new layout for remaining silos, an additional building of 58sq.m. (gfa) to accommodate a water pump room, new roller shutter doors for the waste compactor room's east elevation, a new pedestrian gate at the southern boundary, a new covered bus stop area and covered smoking area, new automatic sliding gates to main entrance and 4 no. new covered bicycle shelters accommodating 48 no. parking spaces. All building floor levels and site levels to be dropped by 200mm with the implication that all parapet heights change. The main car and truck entrance and the gate house to be moved north east on the Proposed Western Road. The modifications will also include an additional parking area at basement level under the HQ building of 803sq.m. (gfa) with new entrance ramp to accommodate 21 no. additional parking spaces, changes to the parking layout south east of HQ Building to accommodate the basement entrance ramp, change of layout to previously approved truck parking to the north and north east, and 3 no. additional loading bays at the east elevation. The modifications result in an overall increase in the gross floor area of entire development from 42,600sq.m. to 45,400sq.m. on an overall site area of 9.3ha.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin, 22

170m
SD13A/0015Granted6 Feb 2013

Construction of a single storey data centre with plant at roof level (total gross floor area 15,825sq.m.) which comprises the following uses: offices, computer and associated support areas, electrical component rooms, plant and associated equipment and new ground level link between the proposed and the existing buildings; also included are ancillary site works for connection to existing infrastructural services (installed under granted permission SD07A/0632), fencing, signage, perimeter services road around the building, 17 no. car parking spaces along with disabled car parking spaces for service of new building, berming and landscaping to the frontage onto Technology Park Road and new random rubble wall and railings to the proposed line of the new R120 road. This application is for 10 years.

Grangecastle Business Park, Nangor Road, Clondalkin, Dublin 22.

195m
SD04B/0109Grant Permission for Retention25 May 2004

Detached domestic double garage as constructed adjacent to existing dwelling

Grange, Newcastle Road, Lucan, Co. Dublin

222m
SD24A/0242WGranted12 Jun 2025

The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.

Grangecastle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22

282m
SD08A/0630Granted5 Sept 2008

Alterations to previously approved reg. ref SD06A/0527 AND SD07A/0102 including a revised gate house design, new pedestrian turnstile access and pathway, revised position of bus shelter, revised parking layout (with the omission of 2 no. car parking spaces and addition of 10 no. truck parking spaces), adjustments to building 1 basement car park ramp, new semi-submerged sprinkling system pump house with a floor area of 95.25 sq. m and 2no underground chambers of 11 sq. m each, revised water tank area layout with 1 no. additional tank of 13.2 sq. m, revised position of permitted smoking shelter, new gas skid enclosure, new back-up generator and associated diesel tank, new truck wash unit, revised stainless steel silo heights ( from 14.98 m. to 17.84 m.), new internal vehicular gate, revised treatment plant layout, revised wheelcahir access to the main building, new additional hard standing area and smoking shelter to the east of the subject site.

Grange Castle Business Park,Nangor Road, Clondalkin, Dublin 22.

295m
SD09A/0376Grant Permission & Grant Retention22 Sept 2009

Modifications to previously approved planning references numbered SD07A/0632 and SD08A/0496 to include the following:- In phase one to retain and complete:- (a) extension of the eastern generator room (ground floor) by 1m and movement of the of room by a distance of 1.45m to the northeast - this extension increases the area of the generator room by 103sq.m. (relocation of the external wall to the northeast by 2.45m); (b) additional louvers adjacent to stair core 6 (central stair core on the southwest facing elevation of the building); (c) the approved flues screening to the airway over the northeast generators to be increased in width by 2.8m and the stacks to be reduced in number from 8 to 7, all of this structure is to be relocated a further 9.3m to the east; (d) electrical room 4 on level 2 (first floor) to be extended north by 3.9m to give an overall increase in area of 145sq.m. to the two; (e) the addition of two number aerial to the existing parapet, located in the northeast and southwest corners of the north facing elevation respectively - aerials to be .75m (750mm) tall and be 0.25m (25mm) in diameter. In phase two to modify the approved works in order to : (a) to replicate all of the modifications listed for phase one to the proposed generator rooms at ground floor level; (b) to replicate the extension of the electrical rooms 4 and 5 to rooms 6, 7 and 8; (c) to replicate the movement and reduction in flue numbers to the southeast airway of phase two; (d) all of the above modifications representing an increase in area of phase two by 248sq.m.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

295m
SD11A/0211Granted2 Sept 2011

Construction of a single storey data centre with external plant at roof and ground level adjoining existing two storey, with roof plant, data centre consisting of a total gross floor area of 11090sq.m. approx. comprising office area, loading area, storage areas, customer and associated support areas with external support plant to be constructed in two phases. The development includes the completion of internal roadwork with additional car parking for four cars; surface water drainage, foul sewage system, sprinkler mains and external landscaping shall be completed in accordance with previously granted planning applications SD07A/0632, SD08A/0496 and SD09A/0376. Extension of existing berm and additional landscaping is proposed for north/west boundary.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

295m
SD07A/0632Granted3 Aug 2007

Construction in two phases of a two storey data centre with plant at roof level (total gross floor area 51,155sqm) which comprises the following uses: offices; computer and associated support and workshop areas; loading docks and storage of electrical components; plant and equipment. Ancillary site works will include parking for 80 no. cars; site lighting an 110kv electrical compound (5,408sqm enclosure); associated plant; fencing; an access bridge and signage from the Technology Park road; a perimeter service road around the building, berming and landscaping. This planning application is for a 10 year permission and is accompanied by an Environmental Impact Statement.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

295m
SD08A/0496Granted16 Jul 2008

Modifications to previously approved reg ref SD07A/0632 ; (a) lowering of office parapet from 81.125 OD to 80.125 OD; (b) change in configuration to the lift motor room to the office area; (c) raising the flues from 93.125 OD to 97.50 OD (Maximum agreed with Air Corp under previous application); (d) omission of two strip window to the south elevation of the office area; (e) reduction in the areas of stairs towers number 3,4,5,6 and 7; (f) addition of louvers to return walls of stair towers 3,4,5,6 and 7; (g) increase in area of the electrical rooms to level 2 by 1,916 sq.m; (h) reduction in the area of louvers to the south elevation level 1 from grid line 17 to 22; (j) construction to be in three phases; (k) transformers reduced from four numbers to three; (I) additional sub-station building of 270sq.m. added to 110kV compound; (m) fuel storage area elongated with additional landscaping beam.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?