SD15B/0265

Grant Permission for Retention

Dublin - South Dublin County Council

Proposed Development

Retention for double garage (55sq.m) with pitched roof.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Aug 2015

  2. Decision: Grant Permission for Retention

    21 Oct 2015

  3. Decision due

    22 Oct 2015

  4. Grant issued

    30 Nov 2015

Application Details

Location
Kilbride House, Baldonnel, Co. Dublin.
Applicant
N/A
Application Type
Retention
Planning Authority
South Dublin County Council
Site Area
2400 ha
Floor Area
55 sq m

Timeline

Registration Date
28 August 2015
Status
Decision
Decision
Grant Permission for Retention
Decision Date
21 October 2015
Grant Date
30 November 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

157m
SD14A/0022Declared Withdrawn17 Feb 2014

A Cremated Remains Cemetery with Columbarium Walls and Remembrance Headstones with chambers for sealed urns; a retail sales unit with public toilets; on site parking, landscaping to existing stone church and graveyard (a Protected Structure, RPS:184 - Stone Church, graveyard, ringfort and earthworks) and all associated site works.

Kilbride, Baldonnell, Dublin 22

264m
SD12A/0002/EPRefuse Ext. of Duration of Permission14 Jun 2019

Revisions and alterations to the permitted development of a data processing facility under planning reference SD11A/0023 consisting of minor alterations to the four permitted data centre/warehouse structures, additional internal floor areas, alterations to sub-station structures and car park layout to be provided on a phased basis (it is proposed to extend the life of the planning permission to 7 years). The construction of the four data centre/warehouse buildings totals 23278 sq.m. (an increase of 2188sq.m.) and associated site works comprising the following areas: Two Type 'A' buildings each with 1872sq.m. of data halls, 697sq.m. of offices/recption, 1934sq.m. of support space/staff facilities/internal plant giving each a total internal floor area of 4503sq.m. (previously 3582sq.m.) and 1483sq.m. of external plant - total area for both Type 'A' is 11972sq.m. (previously 11094sq.m.); Two Type 'B' buildings each with 1872sq.m. of data halls, 419sq.m. (previously 67sq.m.) of offices/reception; 1879sq.m. support space/staff facilities/internal plant giving a total internal floor area of 4170sq.m. (previously 3005sq.m.) and 1483sq.m. of external plant - total area for both Type 'B' structures is 11306sq.m. (previously 9996sq.m.) The Data Centre part of the building is single storey reaching a maximum of 8.6m in height; the plant area is to a maximum of 10.7m high (increase from 9m) and the tallest building is Type 'A' office building is 12.5m in height (increase from 10m). 4 substations accessed from the estate road to facilitate the development are now proposed; each has an area of 49sq.m. and will be 3.75 metres in height. The development will be constructed in 5 phases initially with the enabling site works and 2 substations; the subsequent phases will contain a single warehouse building starting with the northern-most building. A total of 84 car parking spaces will be provided together with recycling storage and all ancillary services and landscaping. There will be 2 site entrances from vehicular accesses permitted as part of business park infrastructure (SD06A/0568).

Profile Park, Nangor Road, Clondalkin, Dublin 22

264m
SD11A/0023Granted6 Apr 2011

Development of a data processing facility on a 4.04ha site consisting of: the construction of four buildings totalling 21090sq.m. and associated site works comprising the following: two 'Type A' buildings each with a data hall (1870sq.m.), offices/reception (607sq.m.), support space/staff facilities and internal plant with a floor area of 3572sq.m. each and external plant 1975sq.m. each (total 'Type A' structures is 11094sq.m.); two 'Type B' buildings each with a data hall (1870sq.m.), reception (67sq.m.), support space/staff facilities and internal plant with a floor area of 3005sq.m. each and external plant of 1993sq.m. each (total Type B structures is 9996sq.m.). The Data Centre part is single storey reaching a maximum of 8.2 metres in height; the plant area is to a maximum of 9.2 metres and the office block is 10 metres in height. A substation to facilitate the development is also proposed with 16sq.m. area and will be 2.6 metres in height. The development will be constructed in two phases with building No.s 3. and 4 built initially. 84 car parking spaces will be provided together with recycling storage. There will be 2 site entrances from the existing crossovers already established as part of business park infrastructure. Surface and foul drainage has been designed to utilize existing sewer system and all retention of surface water and drainage will be in accordance with the agreed design criteria. Lighting and landscaping have been designed with the approved masterplan and site owners.

Profile Park, Nangor Road, Clondalkin, Dublin 22

265m
SD17A/0377Granted23 Oct 2017

Revisions and alterations of the permitted development of a data processing facility under planning Ref: SD12A/0002 on a 3.85 hectare site. The revised application consists of alterations to the DUB14 (previously DUB12) data centre/warehouse structure, granted in the previous application. The alterations to the DUB14 (Previously DUB12) include: (i) 2 data halls 2137 sq.m (increase of 180sq.m), (ii) offices/reception 478sq.m (decrease of 190 sq.m), (iii) support space/staff facilities and internal plant with a floor area of 953sq.m (increase of 84sq.m), (iv) external plant of 1,777sq.m (footprint increase of 35sq.m). The data centre part of the building is single storey reaching a maximum of 8.6 m in height. The plant area is to a maximum of 10.5m high and the office building has been lowered one storey and is 9.1m in height (decrease from 12.3m). The development will be constructed in 5 phases, currently Phases 1 & 2 have been completed with the enabling site works and 2 substations and single warehouse building to the North of the site. The subsequent phases will contain a single warehouse building starting with Phase 3, the application in which this Site Notice relates. A total of 84 (60 at the end of Phase 3) car parking spaces will be provided together with recycling storage and all ancillary services and landscaping. There will be 2 site entrances from vehicular accesses permitted as part of business park infrastructure (SD06A/0568).

Profile Park, Baldonnell, Dublin 22, D22 TY06

265m
SD12A/0002Granted9 Jan 2012

Revisions and alterations to the permitted development of a data processing facility under planning reference SD11A/0023 consisting on minor alterations to the four permitted data centre/warehouse structures, additional internal floor areas, alterations to sub-station structures and car park layout to be provided on a phased basis (it is proposed to extend the life of the planning permission to 7 years). The construction of the four data centre/warehouse buildings totals 23278 sq.m. (an increase of 2188sq.m.) and associated site works comprising the following areas: Two Type 'A' buildings each with 1872sq.m. of data halls, 697sq.m. of offices/recption, 1934sq.m. of support space/staff facilities/internal plant giving each a total internal floor area of 4503sq.m. (previously 3582sq.m.) and 1483sq.m. of external plant - total area for both Type 'A' is 11972sq.m. (previously 11094sq.m.); Two Type 'B' buildings each with 1872sq.m. of data halls, 419sq.m. (previously 67sq.m.) of offices/reception; 1879sq.m. support space/staff facilities/internal plant giving a total internal floor area of 4170sq.m. (previously 3005sq.m.) and 1483sq.m. of external plant - total area for both Type 'B' structures is 11306sq.m. (previously 9996sq.m.) The Data Centre part of the building is single storey reacing a maximum of 8.6m in height; the plant area is to a maximum of 10.7m high (increase from 9m) and th etallest building is Type 'A' office building is 12.5m in height (increase from 10m). 4 substations accessed from the estate road to facilitate the development are now proposed; each has an area of 49sq.m. and will be 3.75 metres in height. The development will be constructed in 5 phases initially with the enabling site works and 2 substations; the subsequent phases will contain a single warehouse building starting with the northern-most building. A total of 84 car parking spaces will be provided together with recycling storage and all ancillary services and landscaping. There will be 2 site entrances from vehicular accesses permitted as part of business park infrastructure (SD06A/0568).

Profile Park, Nangor Road, Clondalkin, Dublin 22

266m
SD21A/0217Granted5 Jul 2022

10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency generators and associated emission flues and plant are proposed in compounds adjacent to each data centre building; gas powered energy generation is proposed to the north east corner of the site to provide electricity for the proposed development; the application proposes to re-route and widen an existing watercourse constructed following an earlier planning permission; it is proposed to reroute this watercourse along the eastern and southern boundary of the site; landscaping is proposed to the south of the site to screen the buildings; fencing and security gates are proposed around the site; new access roads within the site are proposed along with 71 car parking spaces and 26 cycle spaces, bin stores, site lighting, and all associated works including underground foul and storm water drainage attenuation and utility cables and all other ancillary works; a Natura Impact Statement will be submitted to the planning authority with the application.

Profile Park, Nangor Road, Clondalkin, Dublin 22

318m
SD08A/0302Granted9 Jul 2008

ESB sub-station (total floor area c.20sq.m.) and associated site works.

Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22

351m
SD08A/0113Granted19 Feb 2008

1 no detached logistics / distribution warehouse unit with ancillary offices (total floor area c.1842 m.sq.m) and associated site works including storm - water , attenuation, water services and boundary fencing

Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22

353m
SD08A/0052Granted24 Jan 2008

(a) 2 no. semi-detached logistics / distribution warehouse units with ancillary offices (total floor c.3,574sq.m.) and associated site works including storm water attenuation, water services, boundary fencing; (b) extension of estate road previously permitted (SD07A/0280); (c) temporary access haul road previously permitted (SD07A/0280).

Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22

366m
SD10A/0063Granted25 Mar 2010

New 8m diameter sprinkler tank (8.5m in height) and pump house (floor area 30sq.m) to the rear of existing semi detached warehouse unit and associated site works on prviously approved development Reg. Ref. SD08A/0052 on a 0.45 Ha site.

Profile Park, Nangor Road, Ballybane, Dublin 22