SD16A/0148
GrantedDublin - South Dublin County Council
Proposed Development
The painting of 5 murals max. 12.25m high totalling (1,192sq.m) on external walls of existing building, smaller images on 3 external flues (total 10sq.m) also mural painting on a 7.5m high external sprinkler tank (surface area 250sq.m). The installation of an external fence1.8m high x 18m long inside the existing perimter fence at external dining area with mural painted on the internal face (area 33sq.m) Total area of all murals is 1485sq.m. The murals will be lit with light fittings either on the building or nearby poles or ground.
View the full application file on the council's planning portal →Application Timeline
Application received
6 May 2016
Decision: Grant Permission
22 Jun 2016
Decision due
30 Jun 2016
Grant issued
3 Aug 2016
Application Details
- Location
- Units 502 & 503, Casement Avenue, Southgate, Profile Park, Grange Castle, Dublin 22
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 13930 ha
Timeline
- Registration Date
- 6 May 2016
- Status
- Officer Allocation
- Decision
- Grant Permission
- Decision Date
- 22 June 2016
- Grant Date
- 3 August 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Change of use of an existing logistics/distribution warehouse facility (approved under planning ref. no. SD08A/0052) to an electronic technology facility, associated works including modifications to existing structure. The development will consist of the following works and modifications to the existing building: installation of external plant over two storeys along the east and west elevations of the building on a new steel support system clad with acoustic louvered screens to match existing cladding colours; installation of a new first floor to provide additional plant areas; extension to the administration area at ground floor level with new windows to the south elevation to match existing; installation of additional windows at upper level over the existing administration area and existing roof lights removed; removal of existing doors to north facade and replacement with new cladding to colour match existing; associated internal alterations. Extent of site works includes: a sprinkler tank and pump house to the north east corner; extension of existing single storey substation in the south east corner to include a customer switch room; provision of a new main entrance to the east of the existing entrance to Unit 502, a new road layout, entrance gates and new entrance gates south of the building to access the car park; block existing main entrance to Unit 502 to provide set down area to access the ESB substation; construct a single storey security building to the east of the site with new gates and new visitor car parking; remove one existing dock leveller and an on-grade roller shutter door from the north west corner of the building with the existing depressed loading dock filled in; installation of self contained emergency stand by generators and other plant to the north west corner of the site, including all supporting structures for flues, and a 1.8m high fence and gate to generator enclosure; construct roadway around the building to the west, north and east of the site; boundary fencing around site with site landscaping; existing site entrance to Unit 503 to be retained as an alternative access point; divert existing culvert along eastern side of the site to facilitate development; install a bicycle shelter to the south west of the site; increase in site area from 9131sq.m. to 13925sq.m.
Units 502 & 503, Southgate, Profile Park, Grange Castle, Dublin 22
New 8m diameter sprinkler tank (8.5m in height) and pump house (floor area 30sq.m) to the rear of existing semi detached warehouse unit and associated site works on prviously approved development Reg. Ref. SD08A/0052 on a 0.45 Ha site.
Profile Park, Nangor Road, Ballybane, Dublin 22
(a) 2 no. semi-detached logistics / distribution warehouse units with ancillary offices (total floor c.3,574sq.m.) and associated site works including storm water attenuation, water services, boundary fencing; (b) extension of estate road previously permitted (SD07A/0280); (c) temporary access haul road previously permitted (SD07A/0280).
Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22
Installation of a new external steel access platform to facilitate generator flue exhaust emissions testing; lighting; creation of a new door opening in the existing northern building façade to provide access to the platform, and all associated ancillary works; The development is for the purposes of an activity requiring an Industrial Emissions Licence granted by the Environmental Protection Agency (reference no. P1189-01).
Google Ireland Limited, Grange Castle Business Park South, Clondalkin, D22X602
ESB sub-station (total floor area c.20sq.m.) and associated site works.
Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22
Further Information - The proposed development now consists of: 43 Units in 7 blocks comprising 16 Industrial Units (Blocks 1, 2 and 7), 24 Warehouse Units (Blocks 4, 5 and 6) and 3 Science and Technology Units (Block 3) all with ancillary office space (total floor area approximately 12,558 sq. m.). Site development works including storm water attenuated works, water services, boundary fencing, temporary access haul road, estate roads and 2 no. E.S.B. sub-stations, 241 car parking spaces, all on a site of approx 3.314 hectares. (An increase in the overall floor area of the proposed development from 11,416 sq. m. to 12, 558 sq. m., increase in parking spaces from 168 to 241, a reduction in the number of units from 45 to 43, alterations to overall area and internal configuration of unit types A, B, C, D and D1, and reduction in floor area of ancillary office space, removal of 2 units onto internal access road (Block 4), relocation of unit from Block 5 to Block 3, relocation of waste collection area, cycle parking and 2 electricity sub-stations/switch rooms, and alterations to elevation onto internal access road, and alterations to internal access road layout).
Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22
1 no detached logistics / distribution warehouse unit with ancillary offices (total floor area c.1842 m.sq.m) and associated site works including storm - water , attenuation, water services and boundary fencing
Profile Park, Nangor Road, Ballybane, Clondalkin, Dublin 22
Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.
Grange Castle Business Park South and Profile Park,, Baldonnell, Dublin, D22 X602
Modifications to the existing main site entrance to comprise of minor realignment of the internal access road with adjusted road marking and roadside bollards; Removal of 3 existing security traffic arms; Installation of 3 new security traffic arms and installation of 3 underground lifting security road blockers together with associated communications and electrical services; Provision of 2 set-down only parking spaces and all associated site drainage and installation works.
Dublin Google Data Centre, Grange Castle Business Park South, 22, Baldonnel Road, Dublin 22
Provision of roads and services infrastructure to facilitate the future development of a business park, to be known as 'Profile Park' on these lands. The development includes the provision of 1,675 metres of internal distributor roads consisting of 267 metres to dual carriageway standard (at the main entrance) with a further 1,408 metres to single carriageway standard and one internal roundabout. The development also includes surface water drainage, foul drainage and water supply infrastructure, associated landscaping and all ancillary works, on a site of 39.84 hectares. Access to the site will be provided at the northern boundary off the existing roundabout to Kilcarbery Business Park. This application is accompanied by an Environmental Impact Statement.
Nangor Road, Ballybane, Clondalkin, Dublin 22.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?