The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

SD19A/0158

Granted

Dublin - South Dublin County Council

Proposed Development

Change of use for a portion (351sq.m) of the previously approved and constructed ground floor retail unit known as C4 to a Primary Care Centre (class 8) which will form an integral part of the previously approved Academic and Primary Care Centre (SD14A/0041, SD14A/0227, SD15A/0147 and SD16A/0046).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 May 2019

  2. Decision: Grant Permission

    2 Jul 2019

  3. Decision due

    3 Jul 2019

  4. Grant issued

    14 Aug 2019

Application Details

Location
Russell Centre, Tallaght Cross West, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
351 ha

Timeline

Registration Date
9 May 2019
Status
Decision
Decision
Grant Permission
Decision Date
2 July 2019
Grant Date
14 August 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

9m
SD16A/0046Granted17 Feb 2016

Change of use for a portion (80sq.m) of the previously approved and constructed ground floor retail unit known as Unit C4 to a Primary Care Centre (Class 8) at ground floor level. The change of use use when completed will form an integral part of the previously approved Academic and Primary Care Centre (SD14A/0027 & SD14A/0041).

Ground Floor, Russell Centre, Tallaght Cross West, Dublin, 24

15m
SD12A/0239Granted26 Nov 2012

Construction at basement level -1, of an enclosure accommodating an emergency accident response training facility (c. 220 sq.m).

Tallaght Cross Office Development, Belgard Square West/Cookstown Way, Tallaght Town Centre, Tallaght, Dublin 24.

16m
SD20A/0088Granted26 Mar 2020

Replacement of a portion of the facade; removal of escalators and infill of voids at first floor (ex. mezzanine 93.5sq.m and second floor (ex. food courts 64sq.m); change of use of the mezzanine floor of the previously approved and constructed retail known as C4 to a Primary Care Centre (Class 8); change of use for ground floor, first floor and second floor of the previously approved and constructed retail unit known as Food Court, to a Primary Care Centre (Class 8); 6 external signage locations: (1) at unit C5 entrance (8.17sq.m); (2) at unit C4 entrance (9.36sq.m); (3) above first/second floors entrance (11.4sq.m); (4) to east elevation (6,25sq.m); (5) above unit C5 entrance (1.5sq.m); (6) above unit C4 entrance (0.75sq.m); the change of use area when completed will form an integral part of the previously approved Academic & Primary Care Centre (SD14A/0041, SD14A/0227, SD15A/0147, SD16A/0046 and SD19A/0158 at Tallaght Cross West, Tallaght, Dublin 24.

Russell Centre, Tallaght Cross West, Dublin 24

19m
SD20A/0126Granted2 Jun 2020

3 externally mounted hotel signs which include: (1) a high-level wall mounted sign to the northeast facade complete with individual lettering and LED halo backlighting; (2) a double fronted suspended soffit sign with integrated LED lighting located adjacent to the main entrance at the northeast corner of the site; (3) a sign with integrated LED backlighting installed into the existing glazed facade located over the main entrance door to the north of the site.

Tallaght Cross Hotel, Belgard Square West, Tallaght, Dublin, 24

19m
SD15A/0147Granted1 Sept 2015

Change of use of a portion (310sq.m) of the previously approved and constructed retail unit known as The Food Court, to a Primary Care Centre (Class 8) at first floor level. The unit when completed will form an integral part of the previously approved Academic and Primary Care Centre (SD14A/0027 & SD14A/0041). The work shall include: (1) Primary Care Centre at first floor level (310sq.m); (2) additional plant room at roof level; (3) canopy to the entrance glazing on the east elevation of the Russell Building; (4) building and unit signage.

First Floor, Russell Building, Tallaght Cross West, Dublin, 24

22m
ED15/0016Declared Exempt11 May 2015

Replacement of the glazing to the retail units under the Russell Building and in Unit H2 with a flush jointed curtain wall system.

Russell Building (1B) and Unit, H2, Tallaght Cross West, Belgard Square West, Tallaght, Dublin 24

24m
ED26/0049Declared Exempt6 Jul 2026

Whether the partial use of Tallaght Cross Hotel, Tallaght Cross West, Tallaght, Dublin 24, D24VX61, to provide accommodation within 100 no. rooms of the total 186 no rooms for displaced persons or persons seeking international protection, constitutes exempted development or does not constitute exempt development. We note the remaining rooms will continue to operate under continue to operate under the current hotel use.

Tallaght Cross Hotel, Tallaght Cross West, Tallaght, Dublin 24, D24VX61

37m
SD14A/0041Granted5 Mar 2014

Provision of an Academic and Primary Care Centre (total area 6,296sq.m.) which includes a Primary Care Centre, a research and Education Centre (Institute of Population Health), a Clinical/Diagnostics Centre, a Pharmacy all with associated site works, access and external signage. Works to include change of use to existing previously approved and constructed office building, known as Russell Building (total area 6,060sq.m.) and adjoining ground floor retail units C5, C6 to include Level -03 (59sq.m.), Level -02 (59sq.m.), Level -01 (59sq.m.) for access cores from existing basement carpark levels; Level 00 (717sq.m.), Level 00M mezzanine (368.5sq.m.), Level 01 (714.2sq.m.), Level 02 (868.15sq.m.), Level 03 (868.15sq.m.), Level 04 (868.15sq.m.), Level 05 (868.15sq.m.), Level 06 (610.7sq..m.); addition of 236sq.m. of new floor area at Level 00M mezzanine between Level 00 and Level 01; inclusion within total development (including change of use from retail) of Diagnostics Centre within previously approved and constructed Unit C5 at level 00 (364sq.m.); inclusion within total development (including change of use from retail) of Pharmacy unit (179sq.m.) within previously approved and constructed Unit C6 at Level 00 (119sq.m.) and addition of new area at Level 00M (60sq.m.); 7 no. external signage locations (7.5sq.m.) each: 1 no. at Level 00 at entrance lobby at Level 03, 04 (3 no.) to west elevation; 1 no. at Level 03, 04 (2 no.) to south elevation; 1 no. at Level 03, 04 (2 no.) to east elevation; 2 no. external signage locations for projecting illuminated signs (1sq.m. each) at Level 00 east elevation and at Level 00 south elevation; 3 no. internal integrated signage locations (6sq.m. each) within Level 00 Units C4, C5 and entrance lobby to PCC.

Russell Building, Tallaght Cross West, Tallaght, Dublin 24.

45m
SD07A/0973Grant Permission for Retention7 Dec 2007

Sundry revision to development permitted under Reg. Ref. SD03A/0421, SD04A/0938, SD05A/0805, SD06A/0021, SD06A/0561& SD07A/0211 comprising the infill of floor void to hotel mezzanine (Block 2) representing additional floor area of 47.15sq.m. The application site comprises 2.775 hectares.

Belgard Square West/Cookstown Way, Tallaght Town Centre, Tallaght, Dublin 24

45m
SD07A/0925Refused19 Nov 2007

Provision of specialist signage on previously approved Block 2 hotel

Belgard Square West/Cookstown Way, Tallaght, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?