Application for registration of a quarry under Section 261 of Planning & Development Act 2000.
View the full application file on the council's planning portal →Application Timeline
Further information requested
30 Aug 2005
Application received
28 Sept 2005
Further information received
28 Sept 2005
Decision due
21 Oct 2005
Decision: Additions/Revisions
18 Apr 2007
Application Details
- Location
- Belgard Quarry, Roadstone Dublin Ltd., Fortunestown, Tallaght, Dublin 24.
- Applicant
- N/A
- Application Type
- Quarry Registration
- Planning Authority
- South Dublin County Council
- Site Area
- 3033124.74599581 ha
Timeline
- Registration Date
- 28 September 2005
- Status
- Registered Application
- Decision
- Additions/Revisions
- Decision Date
- 18 April 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
An extension (600sq.m) to a storage shed (1805sq.m) (Ref.SD12A/0156); cover for 3 existing ground level aggregate storage bays (c.651sq.m); 2 storage containers at quarry garage (c.28.8sq.m); 1 storage container at quarry void (c.28.8sq.m); removal of 2 storage containers (c.59sq.m); extension to storage shed within the retail shop yard (172.5sq.m) (Ref. SD16A/0239) on a site of 0.1822 hectares.
Belgard and Cheeverstown Townlands, Fortunestown, Tallaght, Dublin 24
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
Cheeverstown townland, Fortunestown, Tallaght, Dublin 24
Concrete plant (715sq.m) with a maximum height of 18 metres; extension to the extension to the existing Dry Mortar 'Flomix' plant (302sq.m) with a maximum height of 33.3 metres (Ref. SD16A/0410); truck wash out bays (187sq.m); a water storage tank (35sq.m.); ancillary facilities within a 1.50 hectare application area at the existing quarry.
Cheeverstown townland, Fortunestown, Tallaght, Dublin 24
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Belgard Townland, Fortunestown, Tallaght, Dublin 24
Retention of: (1) plant/parking storage area (c.1457sq.m); (2) truck/car parking area (c.653sq.m); (3) fuelling station (129.7sq.m) & 2 fuel containers (c. 25sq.m & 23sq.m); (4) 4 transportation garage truck wash out bays (c. 433.5sq.m); (5) bunded fuel storage tanks (233sq.m); (6) oil interceptor; (7) 3 storage containers (30.2sq.m each); (8) truck/car parking area (592sq.m); (9) transportation garage & office with two storey back office/canteen/stores (2036.9sq.m), 2 storage portacabins (16.4sq.m & 10.5sq.m), 1 storage container (c. 7.5sq.m) & generator; (10) 1 lamp post (7.8m high); (11) bunded fuel storage (74sq.m); (12) 5 lamp posts (5.7m high); (13) 5 lamp post from 6.6m to 7.2m high; (14) screening berm (3.7m high by 106m long & 936sq.m); (15) car park for transportation garage & office staff (924sq.m); (16) 1 lamp post (7.8m high); (17) sprinkler system; (18) lab/offices (503.7sq.m) & 3 storage containers (30sq.m each) with 'Biocycle' effluent treatment system; (19) central waste storage container area (c. 860sq.m); (20) 1 storage container (11.9sq.m); (21) metal recycling storage area (c. 324sq.m); (22) 2 lampposts (6.7m & 10m high); (23) fuel/storage shed & fuel tank (162.6sq.m); (24) aggregate storage bays (c. 306sq.m); (25) waste (stone/brick) storage bays (c. 71sq.m); (26) mould blocks storage area (c. 45sq.m); (27) paving plant (2,110sq.m) with elevated feed hopper; (28) 1 storage container (26.4sq.m); (29) rumbler plant (106.8sq.m); (30) packing plant & rumbler (243.8sq.m); (31) 3 security light towers (15.2m & 21.2m & 8.9m high); (32) concrete block/paving storage yard (c. 4.2ha); (33) block plant 2 (3210sq.m); (34) 2 storage porta cabins (27.6sq.m & 34.1sq.m); (35) office/canteen/changing rooms/toilets (c. 133.67sq.m), 1 storage container (c. 14.2sq.m) & 1 storage porta cabin (c. 9.3sq.m); (36) central orders office (85.3sq.m); (37); 1 lamp post (8.8m high); (38) sample storage area (c. 78sq.m); (39) aggregate storage bay (c. 330sq.m); (40) aggregate storage bays (762sq.m); (41) workshop & stores (c. 164.6sq.m); (42) mortar plant (c. 170.8sq.m), substation (14.1sq.m) & stores (29.1sq.m); (43) block plant 1 (3604sq.m) & feeder hopper conveyor to block plant (c. 322sq.m); (44) 'Flomix' silo storage area (c. 299sq.m); (45) Dry Mortar 'Flomix' plant (c. 452sq.m) & storage container (15sq.m); (46) storage bays (427sq.m); (47) 1 Security Cameras Post (7.8m high); (48) sprinklers system; (49) 4 security light tower (1 at 22.1m & 3 at 16.9m high); (50) 2 truck containers (c. 29.2sq.m each); (51) 1 storage container (c. 21.8sq.m) & water tank (9.3sq.m); (52) attenuation pond (c. 4176sq.m); (53) water tank (c. 35sq.m); (54) 1 lamp post (8.8m high); (55) 5 concrete truck wash out bays (c. 322.5sq.m); (56) 1 container (14.1sq.m); (57) block & concrete dispatch office (c. 97.9sq.m); (58) effluent pump station (c. 12.5sq.m); (59) aggregate storage area (c. 1.95ha); (60) roller crusher mill (65.8sq.m); (61) 'Skako' concrete plant (c. 330sq.m) & 2 storage containers (c. 22sq.m & c. 14sq.m); (62) aggregate storage bays (c. 582sq.m); (63) contracts plant storage yard (c. 4311sq.m); (64) 4 contracts yard storage containers (3 at 11.9sq.m & 1 at 29.8sq.m); & all ancillary site development works, internal roads & landscape planting.
Belgard Quarry at Cheerverstown, Whitehall and Belgard Townlands, Tallaght, Dublin 24
Retention of two storey retail display shop (106.2sq.m) & office (180.8sq.m), paving product sample shed (27.7sq.m), storage shed (169.5sq.m) & water tank (4sq.sq.m), retail concrete plant (59.6sq.m), retail product storage bays (725sq.m), retail product storage yard (c.1.2ha), 2 dry mortar 'Flomix' silos (7.9sq.m & 7.92sq.m), welfare room (10.6sq.m) retail display area (1,785sq.m), storage portacabin (14.6sq.m), screening berm (2,370sq.m, c.2.5m high & 166m long), car park (424sq.m, 23 spaces), security hut (4.2sq.m) & barrier entrance, 3 lamp posts (8.1m, 6.6m & 9.2m high), 2 storage containers (29.5sq.m & 29.5sq.m), 1 lamp post (6.2m high), 1 lamp post (9.5m high), pedestrian entrance, 2 Roadstone Retail Outlet signs at site entrance, 6 flagpoles at 8.7m high, 5 directional signs, footpath, 500m of internal roads, the completion & retention of a 45m long & 3m high product display wall, landscaping & all ancillary development works.
Belgard, Fortunestown, Tallaght, Dublin 24
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24
Additions to existing asphalt plant to facilitate use of recycled asphalt materials
Fortunestown, Tallaght, Dublin 24
Retention of the following: (1) Quarry control office & garage (1835sq.m) & 5 storage portacabins (14sq.m,14sq.m, 14sq.m 12.6sq.m & 8.4sq.m); (2) ESB switching station (58sq.m) & substation (36sq.m); (3) spare parts storage area (c. 2445sq.m); (4) maintenance shed (117.7sq.m); (5) car park (30 spaces & 627.7sq.m); (6) 2 lampost (10.5m high); (7) 'Clause 804' plant (1177.7sq.m); (8) wet sand plant (684.4sq.m); (9) 2 weighbridges (325.4sq.m); (10) general waste storage area (c. 12.5sq.m); (11) quarry fuelling station with two 9m3 fuel tanks (126.8sq.m); (12) metal recycling storage area (c.310sq.m); (13) truck parking area (c. 6632sq.m); (14) 1 security camera post (2.2m high); (15) 1 lamp post (9.2 high); (16) hydrocarbon interceptor; (17) tyre storage bays (c.140sq.m); (18) dry sand pant (2203.4sq.m); (19) 1 lamp post (10.3m high); (20) quarry stores (163sq.m); (21) effluent holding tank; (22) security station (13.9sq.m) and 2 lamp post (6.5m high); (23) wheel wash (236.3sq.m); (24) 'Tricel' effluent treatment system; (25) settlement lagoon system (3208.9sq.m); (26) sand polishing filter; (27) security fence (2.9m high); (28) overburden storage mound (7.3 ha); (29) perimeter screening berm (5m to 8m high by 1.6km long & 6ha); (30) perimeter screening berm (5.2m high by 310m long & 7930sq.m); (31) plant storage area ( 8356sq.m); (32) perimeter screening berm (9.2m high by 147 long & 4770sq.m); (33) screening berm (8.4m high by 340m long & 5257sq.m); (34) perimeter screening berm (6.5m high by 240m long & 5665sq.m); (35) perimeter screening berm (9m high by 320m long & 1ha); (36) screening berm (2.7m high by 245m long &3125sq.m); (37) screening berm (3.5m high by 950m long & 1.1ha); (38) screening berm (3m high by 243m long & 3030sq.m); (39) screening berm (3.3m high by 238m long & 2088sq.m); (40) settlement pond area (6.4ha); (41) screening berm (3.5m high by 379m long & 4793sq.m); (42) screening berm ( 3.1m high by 244m long & 3743sq.m); (43) internal access road (285m long) to Outer Ring Road entrance/exit, gate, pedestrian gates, footpaths, paladin fencing (1.8m high) & 6 lampposts (6m high); (44) screening berm (5.2m high by 215m long & 4040sq.m); (45) relocation of entrance to C&D recovery site permitted under SD02A/0167 & all ancillary site works; internal roads & landscape planting.
Belgard Quarry at Cheerverstown, Whitehall and Belgard Townlands, Tallaght, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?