TA170752
CONDITIONALMeath - Meath County Council
Proposed Development
the proposed developments consists of (1) retention of horse arena (2) retention of stables (3) retention of agricultural storage buildings (4) temporary retention of mobile home and septic tank onsite and ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2017
Decision: CONDITIONAL
21 Aug 2017
Decision due
24 Aug 2017
Grant issued
27 Sept 2017
Application Details
- Location
- Blackfriary 1st Division , Trim , Co. Meath
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Meath County Council
- Site Area
- 0.38 ha
Timeline
- Registration Date
- 30 June 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 August 2017
- Grant Date
- 27 September 2017
- Permission Expires
- 26 September 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
constructing a single storey dwelling, installing a proprietary waste water treatment unit and percolation area and all ancillary site works
Blackfriary , 1st Division , Trim Co Meath
the development will consist of the following: (1) to construct a single storied dwelling house and a detached garage (2) to install a proprietary waste water treatment unit and percolation area (3) to make a new entrance onto the road, with entrance walls, gates and piers (4) all ancillary site development works
Blackfriary (1st Division) , Trim , Co. Meath
the development will consist of the following: (1) to construct a single storied dwelling house and a detached garage (2) to install a proprietary waste water treatment unit and percolation area (3) to make a new entrance onto the road, with entrance walls, gates and piers (4) all ancillary site development works
Blackfriary (1st Division) , Trim , Co. Meath
single storey dwelling, installing a proprietary waste water treatment unit and percolation area and all ancillary site works.
Blackfriary 1st divison , Trim , Meath
to construct a single storey dwelling, installing a proprietary waste water treatment unit and percolation area and all ancillary site works
Blackfirary , 1st Division , Trim Co Meath
the development will consist of replacement dwelling for existing dwelling being demolished and replaced with single storey dwelling, detached domestic garage, proprietary waste water treatment system and polishing filter. The development also includes connection to existing services on site, modifications to existing entrance and driveway together with all associated site works
Phillistown , Trim , Co. Meath
the development will consist of single storey dwelling, detached domestic garage, proprietary waste water treatment system and polishing filter, entrance, driveway and all associated site works
Corporationland Dunderry Road , Trim , Co. Meath
the development will consist of: (1) A steel fabrication building incorporating a mezzanine floor for staff facilities and parts storage (2) a detached product assembly building (3) HGV entrance and car entrance (4) services yard to include pallet storage racks and vehicle wash-down area (5) staff parking and bicycle shelter (6) 2.4m high paladin fencing to front, rear and sides of site (7) signage on buildings 1 and 2 (8) underground surface water attenuation yank, connection to all services on site together with all associated site works
Sites 3 + 4 Oaktree Business Park , Dunderry Road , Trim Co. Meath
an increase in waste tonnage at the material recovery and transfer facility permitted under Reg. Ref TA/190687 to now accept up to 50,000 tonnes of waste per annum for the reception, processing and temporary storage of C&D waste, commercial waste and mixed municipal waste for onward transfer. There are no works proposed as part of this application. Permission is also sought to amend Condition No. 2 of Reg. Ref. TA/190687 to now permit a maximum of 50,000 tonnes to be accepted on site per annum. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. The proposed activity will require a review application of the existing Waste Facility Permit from Meath County Council to reflect the increase in waste tonnage upon receipt of planning permission
Site 33 & 34 Oaktree Business Park , Dunderry Road , Trim Co Meath C15 X3RV
(1) A single storey Material Recovery and Transfer Facility building (floor area 1414m2). (2) A single storey detached prefabricated Office building (floor area 67m2). (3) The vehicular access to the site is via the as constructed 2no. entrances. (4) A service yard with vehicle weighbridge and vehicle washing area within. (5) On-site staff car parking and bicycle parking. (6) 1.8m high boundary wall and fencing to front and side boundaries. (7) 2.4m high boundary fencing to side and rear boundaries. (8) Signage on the building. (9) Connection to all services, and (10) All necessary ancillary site development works to facilitate this development. The application relates to an activity requiring a Waste Facility Permit from Meath CC. The waste tonnage for acceptance and handling at the facility will not exceed 24,500 tonnes per annum. The operating hours of the facility will be 07.00-18.00 Monday to Friday and 08.00-16.00 Saturday, and closed on Sundays and Bank Holidays
Sites 33 & 34 Oaktree Business Park , Dunderry Road , Trim Co. Meath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?